707s cannot completely replace Networkers. While I expect the latter to get replaced if a new franchise is awarded properly, there are only 30 x 707s of 5 car length, compared to 147 x 465s and 43 x 466s of 4 and 2 car length respectively.Where will they go when replaced? SE networkers are getting old and need a good replacement
Of course they can. Part of their acceptance included running on 25 kV OHLE, using the first two units that came with pantographs and transformers etc. But your obvious challenge is to find somewhere ‘up north’ that actually needs 5 car EMUs without toilets, an area that hasn’t already got more suitable stock organised already...Surely they can be converted to overhead and sent up north?
Of course they can. Part of their acceptance included running on 25 kV OHLE, using the first two units that came with pantographs and transformers etc. But your obvious challenge is to find somewhere ‘up north’ that actually needs 5 car EMUs without toilets, an area that hasn’t already got more suitable stock organised already...
Northern? If they had toilets added and possible 1 coach removed, could be used there possibly??
Just depends on cost of adding whats needed
Exactly. There are just too many easier solutions using other available stock that is already a suitable length, fitted with toilets, and 25 kV capable.350/2s would probably be easier if Northern want some Desiros.
You clearly must be working for Northern with that mindset!Give them 35-years, stick a battery in them and send then to Northern and describe them as 'new' stock
The only obvious fit would have been Merseyrail, for which they would have been ideal exactly as they are (run 5 car all day and vary the timetable for demand instead of the train length) - but they of course already have the FLIRTs coming.
They didn’t meet the standing capacity and dwell time requirements for suburban stock laid down by DfT in the new SW franchise ITT. As has been mentioned in most of the previous 707 based threads...What's wrong with them that's making South-West wish to dispose of them so soon after their coming into service? I've been on them quite a few times to and from Waterloo and have had nothing to complain about.
Even if they were an option the 707s would need cab end doors because of underground section in liverpool
No toilets, they dont meet the PRM requirements eitherWhat's wrong with them that's making South-West wish to dispose of them so soon after their coming into service? I've been on them quite a few times to and from Waterloo and have had nothing to complain about.
Nonsense. The 707s are fully PRM compliant.No toilets, they dont meet the PRM requirements either
Wasnt a universal toilet part of the requirements?Nonsense. The 707s are fully PRM compliant.
Wasnt a universal toilet part of the requirements?
If there are toilets, at least one must be a universal access type. There don't have to be any, and indeed completely removing them is a valid option for the likes of 153s.
The Merseyrail 777s will not have toilets. The Crossrail units won't. Etc.
Issue is that the lines they operate on at the moment, windsor reading lines are long distance
Crossrail and merseyrail have no toilet facilities mainly cause they both have underground sections. We’re talking a mainline train here
707s only work one train to Reading per day (1935 off Waterloo), so hardly a big issue.Issue is that the lines they operate on at the moment, windsor reading lines are long distance
Crossrail and merseyrail have no toilet facilities mainly cause they both have underground sections. We’re talking a mainline train here
Issue is that the lines they operate on at the moment, windsor reading lines are long distance
Crossrail and merseyrail have no toilet facilities mainly cause they both have underground sections. We’re talking a mainline train here
Waterloo to Windsor takes roughly 55 minutes end to end, it is not long distance.
The 376s on South Eastern & 378s on London Overground also don't have toilets and in theory folk travelling from end to end could be on them for ~ 50 minutes (i.e Crayford/Slade Green to Charing Cross, West Croydon to Highbury & Islington).
No it wasn’t. SWR made it a feature of their PR after the announcement that they’d won, but it wasn’t required in the ITT. The reasons were as I stated in post #19, I’ve cut and pasted the exact wording in previous “707” threads and really can’t be bothered to look it up again...Wasnt a universal toilet part of the requirements?