Bletchleyite
Veteran Member
That’s Birmingham to London.
OK, third then. It still shares with Birmingham the two highest frequency InterCity rail routes in Europe (possibly outside Japan?)
That’s Birmingham to London.
OK, third then. It still shares with Birmingham the two highest frequency InterCity rail routes in Europe (possibly outside Japan?)
If Birmingham & Coventry drivers don't sign south of Northampton and Northhampton and Bletcheley drivers don't sign north of Northampton does that mean that crews alway have to change at Northampton? And who signs for the Crewe- Euston which currently takes the direct fast line?No additional road learning has been carried out, so Coventry and New Street Drivers dont sign further south than Northampton, and Northampton/Bletchley drivers don't sign any further north than New Street (that way at least) so crew changes at New Street will be the norm.
If Birmingham & Coventry drivers don't sign south of Northampton and Northhampton and Bletcheley drivers don't sign north of Northampton does that mean that crews alway have to change at Northampton? And who signs for the Crewe- Euston which currently takes the direct fast line?
No additional road learning has been carried out, so Coventry and New Street Drivers dont sign further south than Northampton, and Northampton/Bletchley drivers don't sign any further north than New Street (that way at least) so crew changes at New Street will be the norm.
Lots of potential for things to go wrong....8 car from Euston turns up and one or other crew is missing at New Street.....half the southbound service turns up with half delayed...do they send the four car and if so what do they do with the (now) spare other 4 cars?
There was also talk of "coupling on the move".....when the 2nd 4 car comes in and instead of stopping, opening doors, closing doors, coupling up and then reopening doors etc, it just came in and coupled straight onto the unit already there.......after stopping first to ensure a smooth coupling of course. The New Street passengers seem a bit dense at times, they see open doors and jump on, so stopping and coupling in the conventional sense (after opening doors) would be a nightmare. The flipside to that is that when the second half comes to a stand, and then starts moving again the passengers will think they've missed the stop and be pulling passcoms left right and centre!
If Birmingham & Coventry drivers don't sign south of Northampton and Northhampton and Bletcheley drivers don't sign north of Northampton does that mean that crews alway have to change at Northampton? And who signs for the Crewe- Euston which currently takes the direct fast line?
From london every hour (majority of the day)
1 tph london - crewe, through brum
1 tph london - liverpool through brum
1 tph london - rugeley through brum
Those are the 3 trains that go from euston through birmingham
But that doesn't account for two of those destinations being served by one train between Euston and New St which then splits off.
I thought people were saying the Liverpool and Rugeley is one 8 car train to Birmingham, then splitting off. So how does that explain 3tph Euston to Birmingham departures?
Another poster wrote that there will be 2tph Rugeley services from Euston with one splitting off from a Liverpool and the other tph from Euston being to Crewe via Birmingham?
I didn't think 2 trains per hour London to Rugeley was announced so doesn't sound quite right somehow?
Birmingham wise:
xx:15 is London - Crew via Stoke & Rugeley
xx:24 is London - Rugeley
xx:49 is London - Crewe
In the reverse it is only one Rugeley - London, so maybe that's why it's not a big announcement? The printed timetable shows it https://www.westmidlandsrailway.co....XAGWnZV54EMY2Qa6tgyvAKxl_dSCWQMk/wm02_web.pdf
Wasn't the idea of the wmtrains franchise to make the services split able so that West Midlands Trains and London Northwestern Railway would become separate TOCs next time round?
Seems a bit concerning to have inter-working between so many LNR and WMR services, and still be able to meet this aim?
Whoops, complacent copying. Correcting..Where is the Liverpool departure there though? I've seen 3 different claims of which services work where and split where on this thread now!
I *think* Bletchleyite may have said the new timetable nearly abolishes 4 car working on the South WCML. He may be able to give more detail though.Whoops, complacent copying. Correcting..
afaik, the Euston - Brum timetable doesn't publish coach lengths, so apart from the split workings, it may be possible some assumptions of 4 cars are wrong unless anyone else knows otherwise? (I think there are a few 8 car peak services as is and don't know how they will be effected)
I *think* Bletchleyite may have said the new timetable nearly abolishes 4 car working on the South WCML. He may be able to give more detail though.
In which case, I do hope someone has had a good look at the train crew diagrams to make sure they haven’t been over optimised. If the changeover arrangements are too tight (which is a fear, having now found out who has been involved in this timetable), it will fall like a pack of cards.
Alternatively, the train crew reps can always put in for some Nike’s.
Crewe guards sign Euston now. There are no jobs we work to Northampton, Rugby or Milton Keynes from the north now, all straight to Euston. Weve even got the delights of a Tring stopper!Crewe drivers only sign as far south as Rugby, the conductors go as far as MK.
Northampton drivers sign to Crewe but bletchley drivers don’t.
Realising I probably won't be trusted after the last mess up, but according to RTT, services through Birmingham seem as follows...
To London Euston
xx:10 from Rugeley Trent Valley xx:14
xx:25 from Crew (via Stoke) xx:33
xx:50 from Liverpool Lime Street xx:54
From London Euston
xx:01 continues to Liverpool Lime Street xx:04
xx:13 continues to Crew (via Stoke) and Rugeley Trent Valley xx:20 simultaneously
xx:41 continues to Rugeley Trent Valley xx:49
To Rugeley Trent Valley
xx:13 from London Euston xx:20
xx:41 from London Euston xx:49
From Rugeley Trent Valley
xx:10 continues to London Euston xx:14
xx:37 continues to Birmingham International xx:39
To Birmingham International
xx:37 from Rugeley Trent Valley xx:39
From Birmingham International
xx:32 continues to Liverpool Lime Street xx:35
To Crewe (via Stoke)
xx:13 from London Euston xx:20
From Crewe (via Stoke)
xx:25 continues to London Euston xx:33
To Liverpool Lime Street
xx:32 from Birmingham International xx:35
xx:01 from London Euston xx:04
From Liverpool Lime Street
xx:20 Joins with xx:26 from Crew (via Stoke), continuing to London Euston xx:33
xx:50 continues to London Euston xx:45
(The Wolverhampton - Walsall local services are also timed as 350s.)
Effectively making the train "sets" working per hour:
(1) EUS - LIV, LIV - EUS
(2) EUS - CRE (with (3) as far as BHM), CRW - EUS (joining onto (4) at BHM)
(3) EUS - RGL (with (2) as far as BHM), RGL - EUS
(4) EUS - RGL, RGL - BHI, BHI - LIV, LIV - EUS (joining onto (2) at BHM)
I'm pretty sure the platform extensions out to Rugeley are only designed for 4 coaches, so that non-splitting service to Rugeley. I think it is likely it has to split elsewhere or be 4 coaches.
Based on the fact that the services heading North from New Street are likely to be 4 coaches each, would that mean there will be 2x 4 coach trains from Northampton to Birmingham continuing to Rugeley and Liverpool, plus one 8 coach service splitting at New Street to Crewe and Rugeley?
Or are they going to 'dump' a 4 car unit in the platform at New Street to wait for a return portion from Rugeley or Liverpool? As this would likely ruin the benefits of running trains through Birmingham.
I really hope, for the sake of the passengers on these new splitting and joining services, that they finally open up the walkway between the two units. Seems to be a WMT speciality to keep them shut, despite this being utterly ludicrous given that the virtually identical 450s have them open all the time. I don't fancy being a passenger who discovers at New Street that they're in the wrong unit, and has 5 or 6 minutes to get to the other unit amongst a horde of commuters at rush hour.
Of course fare evaders might rather like the current setup, provided they're smart enough to cotton on to which unit they won't get a check on!
Crewe drivers have never signed beyond Northampton/Rugby. If it's a driver change it's just between Bletchley/Northampton drivers.Certainly used to be Crewe drivers as far as MK, then another depot's driver takes over.
Well, must just be my luck then, as I've never seen them open and I used to commute on them 5 days a week!That certainly isnt policy. The doors are open and available to walk through on any train I ever work and when I'm travelling pass too.
If it's in service all gangways are supposed to be in use.
Well, must just be my luck then, as I've never seen them open and I used to commute on them 5 days a week!
It’s possible that the dedicated EUS-LIV-EUS circuit is also 8 car throughout.
Or will it just gain/lose coaches at Northampton? Aren't there platform length issues with 8-car Liverpools? Though I suppose UDS could be used...
You cant but its authorised for unit deselect there. I've not seen any weekday 8 car but on a Saturday theres plenty of 8 cars to Liverpool from 25th MayYou can't get 8 coaches in Liverpool South Parkway