I can't really see any future scenario that needs more than 4 platforms for the EMT service at St Pancras.
Firstly there is the capacity issue south of Bedford, which is where we came in on this thread. As Thameslink fits on a 4TPH grid, the MML service has to run on a similar pattern. There is a pair of MML trains 3min apart on some of those quarter-hours and it's realistic to imagine that happening on all four giving a total of 8TPH. This may not be possible with the current Thameslink timetable but it ought to be possible with minor adjustments - it doesn't matter, as the important point is that anything more than 8TPH is very unlikely. Given that at least 2TPH of the 8 will be Corby EMUs that can turn around fairly quickly, 4 platforms ought to be enough even if all the trains are too long to share a platform. It might need some adjustments to reduce the long layovers as I suggested a few posts back.
Secondly there is the question of how many trains the MML north of Bedford actually needs. Assuming HS2 happens, in the long term it takes all the London-Sheffield and some of the London-Derby/Nottingham passengers but will have no effect on anywhere further south. It will also make MML services beyond Sheffield even more pointless than they will become anyway, once HSTs no longer need to access Neville Hill. So I think north of Leicester the likely future is 4TPH of London services, going to Nottingham (fast and semi), Derby (fast) and Sheffield via Derby or Toton (semi, to keep the Sheffield link for intermediate stations). You could add two Leicester semis in to that, plus the Corbies, and still only get to 8TPH.
Firstly there is the capacity issue south of Bedford, which is where we came in on this thread. As Thameslink fits on a 4TPH grid, the MML service has to run on a similar pattern. There is a pair of MML trains 3min apart on some of those quarter-hours and it's realistic to imagine that happening on all four giving a total of 8TPH. This may not be possible with the current Thameslink timetable but it ought to be possible with minor adjustments - it doesn't matter, as the important point is that anything more than 8TPH is very unlikely. Given that at least 2TPH of the 8 will be Corby EMUs that can turn around fairly quickly, 4 platforms ought to be enough even if all the trains are too long to share a platform. It might need some adjustments to reduce the long layovers as I suggested a few posts back.
Secondly there is the question of how many trains the MML north of Bedford actually needs. Assuming HS2 happens, in the long term it takes all the London-Sheffield and some of the London-Derby/Nottingham passengers but will have no effect on anywhere further south. It will also make MML services beyond Sheffield even more pointless than they will become anyway, once HSTs no longer need to access Neville Hill. So I think north of Leicester the likely future is 4TPH of London services, going to Nottingham (fast and semi), Derby (fast) and Sheffield via Derby or Toton (semi, to keep the Sheffield link for intermediate stations). You could add two Leicester semis in to that, plus the Corbies, and still only get to 8TPH.