Nicholas43
Member
Is there any information, or informed conjecture, about what services GWR are planning to run, when? Is it only Reading<>Gatwick? Or (some?) Oxford<>Reading<>Gatwick?They’ll remain on Diesel through Guildford.
Is there any information, or informed conjecture, about what services GWR are planning to run, when? Is it only Reading<>Gatwick? Or (some?) Oxford<>Reading<>Gatwick?They’ll remain on Diesel through Guildford.
The reports I have seen, suggest; -Is there any information, or informed conjecture, about what services GWR are planning to run, when? Is it only Reading<>Gatwick? Or (some?) Oxford<>Reading<>Gatwick?
It has been implied in print that they would replace the 12 387s converting to Heathrow Express, how exactly that pans out in real numbers I'm not sure but then when Crossrail eventually starts running, it will displace 387s currently used on Paddington - Reading 'Stoppers', so long term, (unless Didcot - Oxford & Reading - Basingstoke are electrified), std GWR 387s are only going to be used Reading - Newbury 'Stoppers' and Paddington - Newbury/Didcot 'fasts'.They won’t see regular use on the mainline; just branches, Basingstoke and Gatwick/Redhills.
It has been implied in print that they would replace the 12 387s converting to Heathrow Express, how exactly that pans out in real numbers I'm not sure but then when Crossrail eventually starts running, it will displace 387s currently used on Paddington - Reading 'Stoppers', so long term, (unless Didcot - Oxford & Reading - Basingstoke are electrified), std GWR 387s are only going to be used Reading - Newbury 'Stoppers' and Paddington - Newbury/Didcot 'fasts'.
i though perhaps connect basings with gatwicks as a single service but realized that would restrict electric working from gatwick to reigate if no moving changeovers can take place![]()
The reports I have seen, suggest; -
Reading to Gatwick & presumably on the same tracks the Reading - Redhill stopping service.
Paddington to Oxford through trains i.e over and above the 387s running Paddington - Didcot under the "juice', although given that IETs are on order for this route, I suspect they may be just a few peak hour through trips.
Reading - Basingstoke.
Not specifically noted but assume that Slough - Windsor & Twyford - Henley branches would be 769 operated
The West Ealing - Greenford & the Maidenhead - Bourne End - Marlow branches won't take 4 car trains.
They could work Didcot/Reading - Banbury.
387s run to Swindon sidings now and are due to provide 'Rugby Specials' through to Cardiff in future, main line beyond Didcot won't be cleared for 769s but presumably could be.
If there are 19 units due and allowing for engineering spares, that suggests a max of 17 diagrames, would roughly work out at 7 for Reading - Gatwick, one apiece for Windsor & Henley branches, 2 for the Basingstoke line and assuming either 3 - 8 car or 2 - 12 car for Paddington - Oxford, makes a total of 17? (will probably be corrected very soon!!!)
Is there one out for testing today, or is it a sprinter or 331/195 from Allerton? 5Z20 - http://www.realtimetrains.co.uk/train/S05852/2019/03/12/advanced and return to Liverpool South Parkway 5Z21 - http://www.realtimetrains.co.uk/train/S05854/2019/03/12/advanced timed as Sprinter one way and 319 the other way!
002 coupled up and ready to leave. Debranded, but still in Northern colours. Grey with blue doors.
According to RTT the move has been cancelled again.
http://www.realtimetrains.co.uk/train/K01120/2019/03/14/advanced
What's this then ?
http://www.realtimetrains.co.uk/train/O90718/2019/03/14/advanced
Seems to have been 2 schedules
But when are they going to be any use?769-002 now delivered to Canton 14/3/19 1457
Which Thameslink unit was this converted from? A cursory look at earlier posts mentions 319426 or 319002.769-002 now delivered to Canton 14/3/19 1457
Supposedly will be going into service in May after route, driver and guard training...But when are they going to be any use?
319-002 (the 769s retain their 319 unit numbers other than the class). this will be followed by 003, 006, 007 and 008 which are the other units of the original 5 ordered under Arriva Trains Wales. 426 and three other identified units would be the extra 4 ordered under Transport for Wales.Which Thameslink unit was this converted from? A cursory look at earlier posts mentions 319426 or 319002.
Supposedly will be going into service in May after route, driver and guard training...
Supposedly will be going into service in May after route, driver and guard training...
May 2020?
Who wants to bet 769002 will end up heading back towards Loughborough before it turns a wheel on the public network. Or the first test from Cardiff Central to Cardiff Queen Street it breaks down attempting to climb the hill in the rain
May 2020?
Who wants to bet 769002 will end up heading back towards Loughborough before it turns a wheel on the public network. Or the first test from Cardiff Central to Cardiff Queen Street it breaks down attempting to climb the hill in the rain
if they can manage the 1/4mile 1/46 into sutton platform i am sure they can manage the worst the vallies can throw at them![]()
But that was on electric, who knows what they will be like on diesel on a very wet day
But that was on electric, who knows what they will be like on diesel on a very wet day