dangie
On Moderation
For those who think that the plug won't be pulled from HS2 no matter how much money has been spent and how far advanced its construction is, only need to Google TSR2 jet fighter.
Though if we do get an economic slowdown, it's widely considered that the best response is for the government to provide an economic stimulus by spending on infrastructure. Which would be a reason to keep going rather than cancel it.
A stupid idea 10 years ago.
Scrap it now
For those who think that the plug won't be pulled from HS2 no matter how much money has been spent and how far advanced its construction is, only need to Google TSR2 jet fighter.
Well the gambler's fallacy doesn't apply here. That concept assumes that past bets are investments and indicators of the future when in fact there are a succession of random events. HS2 has a positive usiness case that has improved in its own right since 2009 through traffic growth alone. Add to that the fact that most of the budgeted capital spent to date makes the business case more positive, so cancelling would be even less justified (on a pure economic basis) when the benefits remain the same.
Don't you mean the sunk cost fallacy?
https://youarenotsosmart.com/2011/03/25/the-sunk-cost-fallacy/
And the rolling stock must be capable of these speeds, and fitted with only in cab signalling to stop the penny pinchers who might decide yes these trains can go to Leeds but on the existing network!
For those who think that the plug won't be pulled from HS2 no matter how much money has been spent and how far advanced its construction is, only need to Google TSR2 jet fighter.
I agree. Defence of the country is far more important than getting from A to B ten minutes quicker. Didn't stop the new government scrapping the project though.I think there's a big difference in scope between defence procurement and national infrastructure projects.
with Grayling’s position looking less and less secure, there may need to be a new SoS who presumably will need to be convinced of the merits of HS2.
I know the treasury are far more important in these decisions.
However, I was wondering if the amount spent already and the amount which would need to be spent of the project was cancelled me that it is now effectively impossible to cancel st least to Birmingham.
Edinburgh Trams came close to being halted on a number of occasions, even after all the vehicles had been delivered and almost all of the infrastructure completed. It all got caught up in some horrific local politics, with some nationalists branding it a "unionist" project! It was extraordinarily depressing to see, and although the trams have proved successful and are highly likely to make it to Leith in the next few years, there are still people unfeasibly angry about them. You hear less about it now, but there's at least a few people in Edinburgh who would gleefully rip the whole lot up.
The bad feeling is understandable and is because of the appalling way the project was managed and delivered, not, mostly, because of a simple dislike of trams.
Plenty of projects have run into similar problems - the Jubilee Line Extension cost twice as much as it was meant to and was delayed by 18 months, but no-one seemed to bat an eyelid.
The JLE, being underground, didn't blight the high street of a major city (and make a hash of its popular and well-run bus network that uses that street as its core) for several years.
For those who think that the plug won't be pulled from HS2 no matter how much money has been spent and how far advanced its construction is, only need to Google TSR2 jet fighter.
Didn't they get sent to Shoeburyness to be used for target practice?It's easy to hide a few jet fighters. Having half completed bridges, stations and tracks across the countryside would be a very visible and embarrassing.
Plenty of projects have run into similar problems - the Jubilee Line Extension cost twice as much as it was meant to and was delayed by 18 months, but no-one seemed to bat an eyelid.
So, given it appears we have not reached that point yet, at what point would the 'sunk cost fallacy' no longer apply, i.e. at what point what there be essentially no significant savings from cancellation? 1/2/3 years from now? Longer?
Perhaps the ERG would not be in favour, but then they would be under massive pressure to show some investment in the Midlands and North and cancelling HS2 would completely go against that.
This assumes that enough people are convinced that HS2 will benefit the Midlands and the North. There's a lot of people who think that HS2 will be neutral or negative. Further, they see HS2 as draining money from the rail budget or as being a pot of money that could be put into the rail budget.
I think cancelling HS2 could be easily sold (politically) as a benefit to the Midlands/North.
It would be hard to sell it as a benefit if the money wasn't going to be spent elsewhere
I agree. Defence of the country is far more important than getting from A to B ten minutes quicker. Didn't stop the new government scrapping the project though.
They could make a lot of people happy in "Northern-land" by spending just a fraction of the HS2 money on a new fleet of DMUs to make the trains longer, get rid of the antiquated rolling stock and provide more regular services.
I am puzzled by people's suggestion (assuming such a suggestion has seriously been made) that a committed project of national importance would be cancelled. Am I correct in assuming this is a result in the difficulties faced by California's High Speed programme?
Just a reminder this thread is to discuss whether or not we have "passed the point of no return", and is not to post speculative ideas nor post reasons against HS2.They could make a lot of people happy in "Northern-land" by spending just a fraction of the HS2 money on a new fleet of DMUs to make the trains longer, get rid of the antiquated rolling stock and provide more regular services.
Correct. An act of parliament can only be overturned by another act of parliament (with the possible exception of if a court were to rule that act was unlawful in some way such as non-compliance with ECHR, but I can't see that applying in the case of HS2).The act authorising the work has passed into UK law. What would be needed to cancel it legally? Possibly another act of parliament (anyone able to confirm?)