Thought that comment would entice more detail. Thank you. Yes no doubt these are the fastest recorded runs, but would you seriously plan a whole timetable on that basis? With ATO perhaps, but the variation in driving styles of humans is something else. We may be talking at cross purposes anyway as I was referring to the average performance, not the best possible with a south westerly wind.
Between Chelmsford and Colchester there is the mandatory [2] minutes recovery time for TSRs. The timings between Hatfield Peverel and Witham reflect the old approach controlled signalling for stopping trains on the down main at Witham which thankfully has now been rectified. All 360s are on 321 timings on the main line to keep a pattern timetable and allow 321 substitution without any performance issues. The 30 second dwell times at Hatfield Peverel, Kelvedon and Marks Tey are actually planned as 40 seconds, an agreement that came in with DOO operation. As planning software can’t cope with that, the extra 10 seconds is added to the running times instead, then rounded to the nearest half minute according to NR rules for rounding times. Finally the overhead power supply is more variable than you may think. It is much better now on this section following Hill House feeder being introduced, but it hasn’t always been so.
None of which means I disagree, the new class 720s should be possible of improvements in running times, but to imply that 6 minutes could easily be taken out of the current schedules perhaps paints a slightly false picture.