Bletchleyite
Veteran Member
Am I the only one that thinks this is insanity? Why does a Liverpool Lime St - London Euston need to call at Hemel Hempstead??
Will anyone sit on a 350 for 4 hours + just to scrimp and save a few pounds off a Virgin ticket? Can someone give me a rational business or practical case to have through trains like these? I don't see anything wrong with the current timetable, although the Crewe via New St and the Trent Valley fast direct London - Crewe seem like a good idea. Reliability will seriously be affected, long through trains aren't all necessary or practical loadings and reliability-wise as NXEA found out with through Lowestoft/Peterborough to London Liv St services.
I've answered this on the other thread you posted it to.