jfowkes
Established Member
- Joined
- 20 Jul 2017
- Messages
- 1,268
Tempted to make some sort of analogy with the A380 and start going on about platform lengths or something but I fear it would break down mid-sentence.
I'm sure that the same was said of the Beeching Report, but look how history has proved those times to be so very wrong.
Tempted to make some sort of analogy with the A380 and start going on about platform lengths or something but I fear it would break down mid-sentence.
Tempted to make some sort of analogy with the A380 and start going on about platform lengths or something but I fear it would break down mid-sentence.
Self driving cars are as of yet unproven technology and do not solve the fundamental issues related to cars as a means of transport. Density, cost, pollution and parking. In regards to Hyperloop and Boring Company, when brought into reality these projects would face the same cost barriers as HS2. I'm sure if there was a magical way to reduce costs associated with construction that the government would be more than happy to implement it!
Fixed it for you.Also, Hype-r-loopy just wouldn't work
Or rather, have a surprising glut of sales of a bespoke train (eg classic-compatibles for HS2, or the massive one you describe) aimed at a specific situation after someone unexpected decides to buy massive numbers of them*, and then wonder why sales dried up when everyone interested had had their fill. There'll be demand for an A380-style plane again (unlike Concorde), however it'll be when the current lot get life-expired.The A380 analogy would be if a rolling stock supplier were to develop an 800m long triple-decker train and then wonder why it wasn't getting many sales.
It would work (in that respect) provided that the maximum line curvature is kept to very gradual levels in both the horizontal and vertical planes. As centrifugal acceleration is proportional to the square of the velocity for a given curvature, and Hyperloop [HL] goes more than 3x faster than HS2, the HL would need its curvatures to be an order of magnitude more gentle. It seems to be generally overlooked that this will require some spectacular and expensive civil works - even almost imperceptibly low hills will need to be cut through or tunneled, and slight valleys crossed on viaducts.Also, Hyperloop just wouldn't work in the UK unless you're subjecting your passengers to roller-coaster style accelerations.
Double decker 400m long trains are the norm on other high speed networks. The TGV duplex does not suffer a lack of orders.
Double decker 400m long trains are the norm on other high speed networks. The TGV duplex does not suffer a lack of orders.
Alstom keeps getting TGV orders because it is political suicicde to see Belfort closeNo they're not. There are no 400m double deck trains anywhere. The TGV duplex is the only double deck high speed train in the world. Nobody other than France has ever ordered one.
I guess Morocco doesn't exist then...No they're not. There are no 400m double deck trains anywhere. The TGV duplex is the only double deck high speed train in the world. Nobody other than France has ever ordered one.
The Hype-r-loopy can stop somewhere at Crewe (the plan for HS2 if not serving Stafford, providing 2A does open with phase 1), and the 30 passengers per train can disembark and join a train that seats several hundred and can run just as often to enjoy rest of the journey in comfort?How does any Hyperloop solution integrate with the classic network though? It's not as if Hyperloop can come onto the WCML at Lichfield and progress up to Scotland
If you want to split hairs then, yes, TGV don't run 400m trains; they run doubled-up 200m duplex trains.No they're not. There are no 400m double deck trains anywhere. The TGV duplex is the only double deck high speed train in the world. Nobody other than France has ever ordered one.
If you want to split hairs then, yes, TGV don't run 400m trains; they run doubled-up 200m duplex trains.
The point is that double decker high speed trains are an off-the-shelf product with a proven in-service record which HS2 could order and use quite easily, massively increasing north-south intercity capacity at a stroke.
Are the HS2 tunnels, bridges, stations and other infrastructure being designed to be able to operate double-deck trains?
Are the HS2 tunnels, bridges, stations and other infrastructure being designed to be able to operate double-deck trains?
Don't think the offset matters much as 'gap filler' extending stepboards will be deployed by classic compatible units where new platforms are further away. As to height, the latest duplexes in France have a boarding height just above the lower floor, to match the standard 560mm platform height. There are, I think, two steps down and a lifting platform is also provided at some, maybe all, doors, for PRM purposes. Access to the level above is by stairs only and inter-car connections are upstairs only with continuous level access throughout the unit once you are up there. I suspect the design could be tweaked to accommodate a higher boarding level with more steps going down and fewer going up. With a wider bodyshell, captive double or single deckers would not need to deploy gap fillers.On the captive HS2 lines, generally yes - But I'm not sure how the platform/train interface will look. To allow a classic compatible fleet of train, a UK standard heights and offsets no doubt will be used which (I think) would prohibit the use of Duplex TGV as the doors would be too low.
Is there any scope in splitting Voyagers, so that they run doubled up at the South of the WCML but then split at say Crewe, first half to Chester, second half to Manchester, or split at Preston, first half to Blackpool, second half to Glasgow/Edinburgh. Seems a possible way to get more use of the limited slots out of Euston, by doubling up. TPX seem to split/join so I wonder if Virgin do it, and if not, is it complications in joining/separating Voyagers?
Is there any scope in splitting Voyagers, so that they run doubled up at the South of the WCML but then split at say Crewe, first half to Chester, second half to Manchester, or split at Preston, first half to Blackpool, second half to Glasgow/Edinburgh. Seems a possible way to get more use of the limited slots out of Euston, by doubling up. TPX seem to split/join so I wonder if Virgin do it, and if not, is it complications in joining/separating Voyagers?
Do you mean Pandelinos?
I'm guessing other than the resulting train being twice as long as the Euston platforms it might work!
No, he means Voyagers. Not Pendolinos.
Sorry! I didn't know Virgin still ran Voyagers...seemed kind of strange that there are diesel trains running under wires for such a large distance. My first reaction to finding out this fact is they should get Virgin some bi-modes and transfer the 221's to Cross Country (They really need the capacity)
It will be the other way around in the short term I suspect, the West Coast Partnership bidders will suggest bi-modes to get rid of the 221s off the WCML.