This potential reopening does not have a strategic role, as Central Lancashire is connected with the West Riding's most important cities and towns via the Copy Pit line. Whether its local potential role justifies its re-opening could be assessed according to the key criteria proposed by Altnabreac elsewhere on this site:
- Population of 10,000+
- 60 minutes (75 at a push) journey time of a major employment centre.
- Extant or mainly unobstructed trackbed
- Ability to extend an existing service so more terminal capacity is not required
- Regeneration potential to justify public investment
- Housing growth demand to create both demand and developer contributions.
- Any extension / diversion should have the effect of generating more passengers than it loses.
Extension of the hourly diesel Preston-Colne stopping service is possible, but would enough of these boxes be ticked?
1. Yes, population of Colne and Nelson would satisfy that, surely
2. Pendle Valley would probably come within 60-75 minutes of leads (the bit that isn't in the easy catchment of Burnley Manchester Road already, or people who are prepared to drive to Steeton & Silsden)
3. Huge issue. Trackbed significantly built on/near in some places
4. Can extend existing Colne service, with option to combine with Skipton terminator if necessary. However, running more than 1toh would require extra services, and a loop/double track on existing Colne branch
5. Yes, Pendle valley lacks jobs and is very deprived
6. No developer is going to build new houses in an area where prices are already crazily low due to supply far outstripping demand. But does make better access to an existing housing supply (for more socially minded governments)
7. Potential to attract Leeds workers who currently live much closer and use other modes. But will abstract from existing Burnley Manchester Rd and Skipton demand to some extent.
On balance, probably a 'No' in the current climate, with 3 and 6 being the biggest blockers.