• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Greater Anglia Class 755s (Regional Trains)

LAX54

Established Member
Joined
15 Jan 2008
Messages
3,906
As far as I know NR / GA /FL /GB etc can run as many trains as they want over the crossing :) if the barriers are down, then so be it ! I recall at the Colchester resig, the public were warned that once the project was completed Chitts Hill could be closed for up to 50 mins per hour at certain times :) (but we do try to keep it down to a max of 15 mins, if we can, at busy times)
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

306024

Established Member
Joined
23 Jan 2013
Messages
3,974
Location
East Anglia
Exactly, but running the Peterborough service hourly through to Colchester would mean an extra two trains per hour for most of the day, which brings some out in a rash, even if they are timetabled to pass while the gates would be down for another service.

Up in Colchester box you possibly don’t see all the hurdles in the planning world that have to be cleared before these trains appear on the panel.

As for Brantham depot, there were lots of stories about down time which wouldn’t have stood up to close scrutiny if planned correctly. But as the project was struggling for different reasons it never got that far.
 
Last edited:

LAX54

Established Member
Joined
15 Jan 2008
Messages
3,906
Exactly, but running the Peterborough service hourly through to Colchester would mean an extra two trains per hour for most of the day, which brings some out in a rash, even if they are timetabled to pass while the gates would be down for another service.

Up in Colchester box you possibly don’t see all the hurdles in the planning world that have to be cleared before these trains appear on the panel.

As for Brantham depot, there were lots of stories about down time which wouldn’t have stood up to close scrutiny if planned correctly. But as the project was struggling for different reasons it never got that far.

Brantham we heard the 'stories' bounding about how the crossing will be closed, for x mins as a unit came out of the depot, into the station, changed ends and then went back to Ipswich to start a service, this was due to the UKPN cables to low Ipswich end of the depot, when in fact there was never any need for the units to go to the station and back ! Only the ones 'starting' at Manningtree or Colchester :)
 

TheEdge

Established Member
Joined
29 Nov 2012
Messages
4,498
Location
Norwich
Surprised no one has mentioned it yet but the first few night time runs to Diss and back have happened now...
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,902
Location
East Anglia
Several pictures on various Facebook groups of the unit at Diss in the wee small hours.
 

_toommm_

Established Member
Joined
8 Jul 2017
Messages
6,306
Location
South West London
Hi guys, just recently caught up with this thread - I'm interested in the 755's power pack coach in the middle.

My question(s) are: What is stored in there (no sarcasm)? And if its engines or batteries, why aren't they stored under the train or on top like a conventional bi mode? And does it not surely restrict passengers if one half suddenly becomes more busy than the rest
 

AJM580

Member
Joined
31 Jan 2016
Messages
655
Location
Norwich
The power pack contains the diesel engines, presumably they're not underfloor in order to provide a quieter ride, rather than have a diesel engine droning away underfloor. Checking twitter feeds of those that have seen the one at Innotrans, there is a corridor through the power pack coach, so you will be able to walk through from either end.
 

samuelmorris

Established Member
Joined
18 Jul 2013
Messages
5,121
Location
Brentwood, Essex
Yup, engine and generator - since the trains are bimodes, there's also a pantograph and transformer to house, so you couldn't have an engine under every vehicle. This way, there is sufficient power to give the train good performance on diesel mode (like you would have with an engine under every vehicle) but with room for a low-floor design (as common in Europe), the electrical traction equipment located elsewhere and it also has the advantage of there being less engine noise in the cabin, apart from perhaps the seats adjacent to the power module. Think of it like a diesel loco but without all that wasted space.

As posted above, there is a corridor between the two pairs of engines (or two singular engines in the 3-car version). It's fairly narrow, but probably not much narrower than the inter-coach gangway connections you got on multiple units before through-gangwayed stock came along. The engine(s) are on both sides of the corridor.
See this video (not mine) from 1m00 onwards:
 
Joined
18 Aug 2018
Messages
704
Yup, engine and generator - since the trains are bimodes, there's also a pantograph and transformer to house, so you couldn't have an engine under every vehicle. This way, there is sufficient power to give the train good performance on diesel mode (like you would have with an engine under every vehicle) but with room for a low-floor design (as common in Europe), the electrical traction equipment located elsewhere and it also has the advantage of there being less engine noise in the cabin, apart from perhaps the seats adjacent to the power module. Think of it like a diesel loco but without all that wasted space.

As posted above, there is a corridor between the two pairs of engines (or two singular engines in the 3-car version). It's fairly narrow, but probably not much narrower than the inter-coach gangway connections you got on multiple units before through-gangwayed stock came along. The engine(s) are on both sides of the corridor.
See this video (not mine) from 1m00 onwards:


How many powered axles do both the 3 and 4 car units have.
 

Jonny

Established Member
Joined
10 Feb 2011
Messages
2,577
Yup, engine and generator - since the trains are bimodes, there's also a pantograph and transformer to house, so you couldn't have an engine under every vehicle. This way, there is sufficient power to give the train good performance on diesel mode (like you would have with an engine under every vehicle) but with room for a low-floor design (as common in Europe), the electrical traction equipment located elsewhere and it also has the advantage of there being less engine noise in the cabin, apart from perhaps the seats adjacent to the power module. Think of it like a diesel loco but without all that wasted space.

As posted above, there is a corridor between the two pairs of engines (or two singular engines in the 3-car version). It's fairly narrow, but probably not much narrower than the inter-coach gangway connections you got on multiple units before through-gangwayed stock came along. The engine(s) are on both sides of the corridor.
See this video (not mine) from 1m00 onwards:

That corridor looks pretty tight (like Gresley's corridor tenders)!
 

TRAX

Established Member
Joined
2 Dec 2015
Messages
1,836
Location
France
why aren't they stored under the train or on top like a conventional bi mode?

Apart from what has been said above, one of the ideas behind a separate power pack is that it can be removed if diesel mode isn’t needed anymore.
 

AlexNL

Established Member
Joined
19 Dec 2014
Messages
1,721
Not to forget: these units have a low floor design, giving level access from platform to train. There's no room underneath for diesel engines.
 

trebor79

Established Member
Joined
8 Mar 2018
Messages
4,912
Also it's a condition of the franchise agreement that there be no diesel engines in or under the passenger carrying vehicles of the new fleet.
 

trebor79

Established Member
Joined
8 Mar 2018
Messages
4,912
I guess the other option would have been LHCS, Mk5 or some other design.
I think I've been on a CAF bimode in Spain in which the diesel engine(s) were not under the floor. Madrid to Algericas, also went through a guage changing station which was interesting.
So at least 2 other potential options.
 

Mordac

Established Member
Joined
5 Mar 2016
Messages
2,386
Location
Birmingham
The franchise agreement specifies no underfloor engines because FLIRTs were bid. It's a way of ensuring the bid stock is the one that gets purchased. If some other type of DMU had been propposed by the winning bidder, the franchise agreement wouldn't specify that.
 

LAX54

Established Member
Joined
15 Jan 2008
Messages
3,906
Yes they ran, and all ran well apart from a slight delay in the ECS being hauled from Norwich to Diss. It ran on diesel only, not allowed on the OHL yet, dont think there are any more planned for 2018, so assume will resume in Jan 2019 ?
Only downside to these units as far as I can see, is the reduced fuel tank capacity, meaning must be fueled every night.
 

dazzler

Member
Joined
6 Apr 2018
Messages
260
Location
York
I guess the other option would have been LHCS, Mk5 or some other design.
I think I've been on a CAF bimode in Spain in which the diesel engine(s) were not under the floor. Madrid to Algericas, also went through a guage changing station which was interesting.
So at least 2 other potential options.

Sounds like RENFE Class 730 for use on standard gauge high speed lines and the rest of the broad gauge network - Two modes, two voltages and two gauges!

https://en.wikipedia.org/wiki/RENFE_Class_730
 

Top