Last weekend no passenger trains ran between Bournemouth and Southampton and passengers were conveyed between intermediate stations by bus.
Needless to say on Sunday travelling on a full bus from Bournemouth I witnessed frustrated and angry passengers turned away at Christchurch by our Stagecoach driver because the bus was full. There was no SWT rep at the station and the looks on the faces of the 15 or so people left stranded said that there are 15 passengers lost to rail fpr good and a lot more besides when they recount to others how SWT left them for dead instead of providing an adequate service. I don;t know how many other stations suffered this humiliating fiasco but I bet my bus and the one station we called at before the driver gave up and went non stop to Southampton Central with a full load was not the only incident.
So does anyone know why such a huge stretch of main line was closed? How much of the line was worked on - could it have been operated using Single line running and shorter sections?
Surely the entire 25 miles (plus Lymington branch) is not all being tamped or whatever at the same time - was this massive outage and the corresponding bustitution just for Network Rail and Stagecoach's personal convenience because it sure as h*ll wasn't for the passengers!
If any SWT drivers read this I'd be interested to know how many crossovers exist between Soton Central and Bournemouth - I'm guessing Brockenhurst is at least one?
Needless to say on Sunday travelling on a full bus from Bournemouth I witnessed frustrated and angry passengers turned away at Christchurch by our Stagecoach driver because the bus was full. There was no SWT rep at the station and the looks on the faces of the 15 or so people left stranded said that there are 15 passengers lost to rail fpr good and a lot more besides when they recount to others how SWT left them for dead instead of providing an adequate service. I don;t know how many other stations suffered this humiliating fiasco but I bet my bus and the one station we called at before the driver gave up and went non stop to Southampton Central with a full load was not the only incident.
So does anyone know why such a huge stretch of main line was closed? How much of the line was worked on - could it have been operated using Single line running and shorter sections?
Surely the entire 25 miles (plus Lymington branch) is not all being tamped or whatever at the same time - was this massive outage and the corresponding bustitution just for Network Rail and Stagecoach's personal convenience because it sure as h*ll wasn't for the passengers!
If any SWT drivers read this I'd be interested to know how many crossovers exist between Soton Central and Bournemouth - I'm guessing Brockenhurst is at least one?