You could argue 100% of cl.376 toilets workIf you take that literally, then the new franchise winner better fix up or replace the 376s very quickly![]()
You could argue 100% of cl.376 toilets workIf you take that literally, then the new franchise winner better fix up or replace the 376s very quickly![]()
Just because the trains may not necessarily be full and standing the entire way doesn’t mean that the services won’t be both much busier between, say, Gravesend and Abbey Wood as they are used to feed the new behemoth that is Crossrail. Indeed, the provision of something akin to 4tph from Gravesend to Cannon all stops via Greenwich and 2tph from each of Barnehurst and Crayford (starting back from wherever) will be extremely important.
It does, however, make the prospect of 8 car Ops every 7-8 mins as a clockface service via Greenwich all stops vastly more attractive as people seek to connect with trains running every 5-8 mins depending on the time of day. Moreover, a lesser number of people on trains east of Charlton through to London freeing up capacity for people in the Westcombe / Greenwich / Deptford corridor makes that service indeed more attractive;
and passengers who seriously need Blackheath can use the 53/54 from Woolwich or the 108 from Westcombe Park or those going to Lewisham can get the DLR.
Any notion after Crossrail opens (serving, for example, Liverpool Street / Farringdon / TCR / Bond Street / Paddington) that people seriously want to go from Erith or Belvedere to Charing Cross on a direct train is bogus. They will all want to get on the vastly quicker Crossrail to the heart of the West End or indeed to the City. Even those who want St Pancras will use it to Farringdon!
1. I don't believe that any bidders are proposing Hitachis. Hitachi might have their hands full supplying the existing order book?In an Abellio-win scenario (or Govia, I hope not), would the new Metro fleet likely consist of the Hitachi AT100 model (that has been mentioned on this thread before)?
Reading the Hitachi page about the proposed stock, it would be a very suitable fit I think, given the car no. configuration options, top speed and all-round versatility, the latter emphasised by the need to have 465s on outer suburban services still, where 375s alone are not enough.
As new as the 707s are, the nature of the SE franchise is multiples of 4, not 5, let alone there only being 30 units, so I think their best use is with pantographs up north. As for 458s they'd better not come this way, again given the wrong car configurations, but more so I think it would be ironic if, given their history, the Networkers low reliability caused them to be replaced with a fleet whose reliability record maybe considered even worse.![]()
1. I don't believe that any bidders are proposing Hitachis. Hitachi might have their hands full supplying the existing order book?
2. Have you forgotten the 377s from GTR? There's now 100 vehicles.
3. SE is not just multiples of 4; they have 2-, 3- and 4-car trains; some peak services run 10-car and guess what 2x5 is... Besides as has been shown in the past, units can be re-configured - when that is the only option. The 707s can fill a hole, early, if extra capacity is needed and they're possibly cheaper than 377s.
The SE Network is a lot slower than the SW one, even after all the money that has been spent. The 707s might be seeing an upgrade. For the ROSCO, this is a once in a lifetime opportunity, without spending money to convert to AC (still with no buyer in sight).If the 707s have flaws which made them unsuitable for SW services, I don't see why they would be any more suitable for SE services. Charing Cross IS a problem, but otherwise the SE Metro services are set up to run 12 car services.
Charing Cross IS a problem, but otherwise the SE Metro services are set up to run 12 car services.
Actually I think 2 of the bidders probably have and also remember the transfer of some service to Thameslink too, even a SE franchise growing on each route will have fewer passengers in total for quite while as they lose routes etc..I don't think any of the bidders plan their bids around possible passenger growth/decline (depending on route and station) after Crossrail. At this stage it would be extremely difficult to reliably predict the flows. The new railway will need months of full service (unlikely in 2019) for commuter's pasterns to be established. Initially a lot of people will experiment, eventually some strange patterns might appear.
The SE Network is a lot slower than the SW one, even after all the money that has been spent. The 707s might be seeing an upgrade. For the ROSCO, this is a once in a lifetime opportunity, without spending money to convert to AC (still with no buyer in sight).
I don't think any of the bidders plan their bids around possible passenger growth/decline (depending on route and station) after Crossrail. At this stage it would be extremely difficult to reliably predict the flows. The new railway will need months of full service (unlikely in 2019) for commuter's pasterns to be established. Initially a lot of people will experiment, eventually some strange patterns might appear.
Why is it slower? I suppose the stops heading towards kent are all very close together compared to the ones towards Surrey.The SE Network is a lot slower than the SW one, even after all the money that has been spent. The 707s might be seeing an upgrade. For the ROSCO, this is a once in a lifetime opportunity, without spending money to convert to AC (still with no buyer in sight).
They will not replace anything fully, but I know that two bidders were looking to make use of them - in different ways.Clearly there aren’t enough of them for Networker replacement - are you suggesting a mix of re-configure and new build?
There are numerous infrastructure issues that reduce speed; it's a pretty complex network compared to SW.Why is it slower? I suppose the stops heading towards kent are all very close together compared to the ones towards Surrey.
I think you'd get hammered if you didn't plan around the passenger reduction due to Crossrail, so I'd be extremely surprised if bidders didn't come up with some assumptions around the timetable. Then the standard timetabling software (MOIRA) will give a good estimate of the revenue loss.
Not surprising, since that isn't its function. MOIRA is solely a tool for predicting the effect of changes to the timetable (all things else being equal). It's generally regarded as being pretty good at that.MOIRA is not great at predicting revenue growth so I've heard.
A LOT of new houses are being built along the Thames at the moment, and for the next few years. There will certainly be no shortage of new potential rail users, even if Crossrail removes some of those from Woolwich eastwards
Yep. Whilst Ebbsfleet hogs the headlines (and government mentions) at 15k homes, areas within London dwarf it when added together and in areas closer to SE than the tube etc. Charlton alone will see more than half Ebbsfleet's total at 8k homes. Deptford about 5k+. Plumstead around 4k and closer to SE than Crossrail. Bexley Council also want 20k on an arc along the SE line. Even if people use Crossrail they'll probably transfer at Abbey Wood to and from SE metro. Could go on with 10+ more examples of very large development sites within the M25.
I'm far from convinced the DfT "get" this, and just think the tube/crossrail/buses suffice and they focus out of London. Tfl DO get it to a greater extent as they know rail is the main transport method for many potential commuters.
No and that will really frustrate TfL as they want /need the money!Do we think there are enough trains from Kent to deposit people at Abbey Wood?
Only 2tph in the South Eastern ITT link Dartford with Abbey Wood, and those trains also call at Woolwich Dockyard thus making 12-car operation tricky without SDO and a risk assessment.
Presumably the 1-2tph Thameslink service will continue, although that hasn't been confirmed yet. That is itself 8-car only.
Yep. Whilst Ebbsfleet hogs the headlines (and government mentions) at 15k homes, areas within London dwarf it when added together and in areas closer to SE than the tube etc. Charlton alone will see more than half Ebbsfleet's total at 8k homes. Deptford about 5k+. Plumstead around 4k and closer to SE than Crossrail. Bexley Council also want 20k on an arc along the SE line. Even if people use Crossrail they'll probably transfer at Abbey Wood to and from SE metro. Could go on with 10+ more examples of very large development sites within the M25.
Do we think there are enough trains from Kent to deposit people at Abbey Wood?
Only 2tph in the South Eastern ITT link Dartford with Abbey Wood, and those trains also call at Woolwich Dockyard thus making 12-car operation tricky without SDO and a risk assessment.
Presumably the 1-2tph Thameslink service will continue, although that hasn't been confirmed yet. That is itself 8-car only.
And that’s an interesting point if the Gillingham/Rainham service is no longer ran by Thameslink in 2022 (praying to the rail gods this comes to pass) then how will the new franchise go about this issue? I’ve not really thought about that
Losing the Thameslink service is only a good thing if it is replaced by something better, and we already have details of what the Southeastern services will be for the next several years.
The franchise 9 or 10 years this time so a bit longer than previous. Much of it will be underway in that time, though of course when is a big question.Sure, that's a lot of potential customers. The question is how many of those homes will be occupied in the life of the new franchise. It would make quite a difference into SE revenue if they mostly occupied in 3-4 years from now rather than in 5-7. Charlton developments are years away.
Actually, I forgot, how long will the new franchise last.
And as someone who lives on this route it has been nice to gain reliable (this route is pretty reliable) Thameslink route. If all of the SE trains became clockface to Cannon Street there is no reason as to why a service to Blackfriars and further north couldn't become part of this.
The Thameslink could go via Lewisham and avoid crossing over the lines into London Bridge (I think so anyway but i am no expert.
The Lewisham route is better since no NKE Junction issue, so far there’s been no issue I know that, but if issues do arise then the Thameslink network will be fouled up.
.