CrossCountry Franchise: DfT looking at five year direct award

Status
Not open for further replies.
Joined
24 Jun 2014
Messages
442
Location
Derby
According to the 'Railway Gazette', the DfT is planning to directly award a contract to Arriva to continue to operate Cross Country for a further five years; see:

https://www.railwaygazette.com/news...-year-cross-country-direct-award-planned.html

The Department for Transport plans to directly award incumbent Arriva a contract to continue to operate Cross Country services for 60 months from the end of the current contract in October 2019.

Arriva's XC Trains Ltd subsidiary originally won the Cross Country franchise in 2007, and the services are currently operated under a three-year direct award contract running from September 2016 to October 2019.

...

Note that the list of services to be operated includes Birmingham - Leicester, but Birmingham - Nottingham is excluded.
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly

CptCharlee

Member
Joined
31 Jan 2018
Messages
123
5 years. With no improvements to services or rolling stock. Crosscountry seriously needed to sort out it's capacity issue. This is going to be ridiculous.

No Liverpool or Norwich on the new franchise either.

I was really looking forward to a new progressive start for crosscountry from 2019. Now it's just make do.
 

geoffk

On Moderation
Joined
4 Aug 2010
Messages
3,933
Location
Exeter
5 years. With no improvements to services or rolling stock. Crosscountry seriously needed to sort out it's capacity issue. This is going to be ridiculous.

No Liverpool or Norwich on the new franchise either.

I was really looking forward to a new progressive start for crosscountry from 2019. Now it's just make do.
I agree. Rail users and supporters need to make a fuss about this.
 
Joined
24 Jun 2014
Messages
442
Location
Derby
Perhaps Birmingham to Nottingham is covered by Cardiff to Nottingham

Could be, but it lists Birmingham - Stansted Airport and Birmingham - Leicester.

Can't see anything on the DfT's website about it yet, but the Railway Gazette entry (dated today) says that the announcement of these plans for the direct award was made on 13th October (which was a Saturday)
 

Puffing Devil

Established Member
Joined
11 Apr 2013
Messages
3,170
Why not 2 years as an extension, to allow the country to Brexit and get a proper procurement process in place? Of course, if Arriva doesn't want the extension, we could go straight to a procurement.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,764
Location
Nottingham
Nottingham - Cardiff is included. Surely Brum is a calling point on the way?
Perhaps Birmingham to Nottingham is covered by Cardiff to Nottingham
But they have put Birmingham-Leicester separately despite it being a short working of Birmingham-Stansted. Which could be down to sloppy writing or an indication that Birmingham-Nottingham will go to East Midlands. Let the speculation commence!
No Liverpool or Norwich on the new franchise either.
It seems to have been decided that this will be split with west of Nottingham going to TPE or Northern in recognition of linking three cities definitely in the North with one that's on the fringes but will already be served by a Northern Connect. Giving the eastern end to XC would reduce Peterborough-Ely to two operators but invove setting up a new operation that doesn't go through Birmingham, which seems to be the main criterion for being part of XC today.

By definition train services connect different areas so you're never going to have a neat and tidy franchise map with no overlaps unless you force passengers to change trains unnecessarily. There's also the risk of seeing what doesn't work too well with the current setup but not seeing the things that work well and would be worse if it was changed. There are also good reasons for passengers and for the railway as a whole to leave the franchise pattern alone unless there's agood reason to change it.

"When you reorganise you bleed" - G Fiennes.
 

pdeaves

Established Member
Joined
14 Sep 2014
Messages
5,932
Location
Gateway to the South West
There is no mention of Guildford, Newquay or Penzance. I wonder if they are sufficiently minor to be omitted from the summary or whether it's decided they will disappear.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,062
Location
Reston City Centre
Five years for an extension (of a 2007 franchise that was already meant to have finished over two years ago)?

This extension is as long as some franchises are meant to be!

Fingers crossed there's some real "meat" in the deal arranged - GWR passengers have had improvements secured as part of the various extensions that that franchise has had over the years - making-do-and-mending won't work with XC.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,314
Why not 2 years as an extension, to allow the country to Brexit and get a proper procurement process in place? Of course, if Arriva doesn't want the extension, we could go straight to a procurement.
It might not be a straight 5 years, the article includes:
“Giving a year’s notice of its plans for a direct award on October 13, DfT said the five-year period was likely to include a core period and optional extensions exercisable at its sole discretion.”
 

TheDavibob

Member
Joined
10 Oct 2016
Messages
431
I would have thought stock decisions would be constrained by whatever happens for the EM franchise, given the similar requirements. When is that franchise due to be announced? I lose track...
 

michael74

Member
Joined
3 Jul 2014
Messages
586
Will the direct award stipulate putting some tarpaulin on-top of the voyagers so they can get past Dawlish at high tide... :rolleyes: I was hoping a new franchise could have done something about that...
 

The_Train

Established Member
Joined
2 Jun 2018
Messages
5,247
As others have said in the vast array of XC threads we have seen lately, it definitely does make you wonder if there was a severe lack of interest from other parties that has lead to this outcome
 

The_Train

Established Member
Joined
2 Jun 2018
Messages
5,247
Will the direct award stipulate putting some tarpaulin on-top of the voyagers so they can get past Dawlish at high tide... :rolleyes: I was hoping a new franchise could have done something about that...

Or tarpaulin over the sea?
 

geoffk

On Moderation
Joined
4 Aug 2010
Messages
3,933
Location
Exeter
Five years for an extension (of a 2007 franchise that was already meant to have finished over two years ago)?

This extension is as long as some franchises are meant to be!

Fingers crossed there's some real "meat" in the deal arranged - GWR passengers have had improvements secured as part of the various extensions that that franchise has had over the years - making-do-and-mending won't work with XC.
This is really bad news. XC desperately needs extra capacity, including bi-mode trains to reduce the large amount of diesel operation under the wires. XC-set fares are a rip-off and easily undercut by split-ticketing.
 

geoffk

On Moderation
Joined
4 Aug 2010
Messages
3,933
Location
Exeter
Why not 2 years as an extension, to allow the country to Brexit and get a proper procurement process in place? Of course, if Arriva doesn't want the extension, we could go straight to a procurement.
Why not stop Brexit, get rid of the Tory government and elect one which makes public transport investment outside the south-east of England a high priority?
 

ForTheLoveOf

Established Member
Joined
7 Oct 2017
Messages
6,416
XC-set fares are a rip-off and easily undercut by split-ticketing.
The DfT is no doubt happy about that state of affairs (though perhaps not about the fact that splitting is allowed); they have more money to spend on other projects, and are less reliant on the Treasury, if TOCs have a pricing policy that enables them to pay a bigger franchise premium.
 

mushroomchow

Member
Joined
14 Feb 2017
Messages
455
Location
Where HSTs Still Scream. Kind of.
If the protestations of the local council are of any note, they're planning to split the Birmingham - Stansted service at Leicester and give the eastern portion to the new East Midlands franchise. The specific mention of a "Birmingham-Leicester" service would seem to back up that assertion.

I don't see the logic myself, Leicester is already a bottleneck without having additional trains terminating there. Unless they finally pull their finger out and build either platforms 5 and 6 or a platform 0 for north-facing terminating services, that is. It would make far more sense to increase train lengths instead, since it's a horribly overcrowded service relying on 3 (sometimes 2) car 170s at present, and I believe there's room at each station along the line for at least 4-car trains.
 
Joined
24 Jun 2014
Messages
442
Location
Derby
Which could be down to sloppy writing or an indication that Birmingham-Nottingham will go to East Midlands. Let the speculation commence!

East Midlands has been consulted on and is now out to tender; Birmingham - Nottingham isn't included.

However, as the possibility of transferring this service to West Midlands was included in the XC franchise consultation, this is probably the better bet if the omission from the list of services is deliberate and not an error
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,764
Location
Nottingham
East Midlands has been consulted on and is now out to tender; Birmingham - Nottingham isn't included.

However, as the possibility of transferring this service to West Midlands was included in the XC franchise consultation, this is probably the better bet if the omission from the list of services is deliberate and not an error
Which means the 3TPH Nottingham-Derby service would have three different operators...
 

Mollman

Established Member
Joined
21 Sep 2016
Messages
1,727
Location
Preston
Why not 2 years as an extension, to allow the country to Brexit and get a proper procurement process in place? Of course, if Arriva doesn't want the extension, we could go straight to a procurement.

As has been mentioned by the DfT itself - the whole point of the direct award is to keep the franchise going as is until the future of franchising is known. Then the XC franchise can be recast as needed to meet the new look model or just be nationalised if Labour is in office by then.
 

lammergeier

Member
Joined
5 Oct 2017
Messages
505
But they have put Birmingham-Leicester separately despite it being a short working of Birmingham-Stansted. Which could be down to sloppy writing or an indication that Birmingham-Nottingham will go to East Midlands. Let the speculation commence!
EMT will not be allowed to operate into New St. If it goes, it will go to WMR although it would surprise me if it went and Leicester didn't.
 

Mitchell Hurd

On Moderation
Joined
28 Oct 2017
Messages
1,763
Well I'm sincerely hoping that it is not going to be a case of putting up with our current stock for at least 6 more years. Otherwise it's back to square one with me complaining to XC about capacity.

I'll even be happy to either talk to someone in person on the phone, go up to their headquarters in Birmingham or arrange a meeting with someone from the DfT even if I have to go down to London in the morning or evening rush hour - whatever it takes to make sure we're not waiting over 5 or 6 years for desperately needed more capacity!

There'll be enough stock from LNER - either HST's which means waiting for electric doors or Mark 4's which means either...

New-build bi-mode 125mph locomotives or the HST powercar's engines updated to enough power to cope with lugging 7 Mark 4's everyday.
 
Status