Read this today:

Delay from Birmingham New Street due to slippery rails

Really?
Is there a limit to how simple we make things before it becomes almost unreadable or patronising?
I would have thought "poor rail condition" is adequate enough to be grown up but simple.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The_Train

Established Member
Joined
2 Jun 2018
Messages
5,247
But wouldn't 'poor rail condition' cover a wide variety of potential issues, whereas 'slippery rails' actually gets to the point of the issue and leaves no doubt as to what the actual problem is?
 
Last edited:

GB

Established Member
Joined
16 Nov 2008
Messages
6,562
Location
Somewhere
Bur wouldn't 'poor rail condition' cover a wide variety of potential issues, whereas 'slippery rails' actually gets to the point of the issue and leaves no doubt as to what the actual problem is?

Exactly. A frequent comment on here is that people want simple and direct information. When the railways provide just that they are then seen as babying people....cant win.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,736
Location
"Marston Vale mafia"
Exactly. A frequent comment on here is that people want simple and direct information. When the railways provide just that they are then seen as babying people....cant win.

I don't see this as babying at all. It's simple, accurate and detailed. What's not to like?
 

ComUtoR

Established Member
Joined
13 Dec 2013
Messages
9,562
Location
UK
I would have thought "poor rail condition" is adequate enough to be grown up but simple.

We apologize for the delay. Loss of traction due to reduction of friction between the contact point of the train and the rail has been affecting all units with 'smart sander™' capability and the RHTT circuit has not yet been completed. Should operational staff report low adhesion conditions that are 'reportable' then we will ensure that sandite™ or trackgrip 60™ will be laid and conditions will therefore improve slightly.
 

Steam buff

New Member
Joined
4 Nov 2017
Messages
3
We apologize for the delay. Loss of traction due to reduction of friction between the contact point of the train and the rail has been affecting all units with 'smart sander™' capability and the RHTT circuit has not yet been completed. Should operational staff report low adhesion conditions that are 'reportable' then we will ensure that sandite™ or trackgrip 60™ will be laid and conditions will therefore improve slightly.
Would love to hear the station announcer or guard read that out without laughing!!!
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,939
Location
Fenny Stratford
The opening statement seems to be direct, punchy and accurate - gets a tick here!

We apologize for the delay. Loss of traction due to reduction of friction between the contact point of the train and the rail has been affecting all units with 'smart sander™' capability and the RHTT circuit has not yet been completed. Should operational staff report low adhesion conditions that are 'reportable' then we will ensure that sandite™ or trackgrip 60™ will be laid and conditions will therefore improve slightly.

whilst you jest i suspect that is exactly what some posters here would like!
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,979
Location
Airedale
To me, "poor rail conditions" sounds as if the rail is in poor condition - which is rather more worrying!
 

the Rat

Member
Joined
28 Jun 2015
Messages
61
Whilst we are, quite rightly, defending our wonderful language against the onslaught of 'Americanisation', I would like to point out that 'simplicity' is the word.

The irony of someone complaining about the inaccuracy of an announcement whilst, themselves, making up their own words is pure Britain 2018.
 

gazthomas

Established Member
Joined
5 Jun 2011
Messages
3,466
Location
Llandudno
I'm happy with the explanation, though would love to know whether it's due water, leaves, or both (or something else of course!)
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,061
Location
St Albans
I'm happy with the explanation, though would love to know whether it's due water, leaves, or both (or something else of course!)
What difference would it make if it was water, leaves or even KY? :)
Maybe you would also like to know between which mileposts it is located.
 

gazthomas

Established Member
Joined
5 Jun 2011
Messages
3,466
Location
Llandudno
What difference would it make if it was water, leaves or even KY? :)
Maybe you would also like to know between which mileposts it is located.
Yes, please, and what the driver had for lunch that day!
 

FQTV

Member
Joined
27 Apr 2012
Messages
1,067
Whilst we are, quite rightly, defending our wonderful language against the onslaught of 'Americanisation', I would like to point out that 'simplicity' is the word.

The irony of someone complaining about the inaccuracy of an announcement whilst, themselves, making up their own words is pure Britain 2018.

Quite!
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,718
Location
Nottingham
Whilst we are, quite rightly, defending our wonderful language against the onslaught of 'Americanisation', I would like to point out that 'simplicity' is the word.

The irony of someone complaining about the inaccuracy of an announcement whilst, themselves, making up their own words is pure Britain 2018.
You're obviously in a state of some mifflement, and certainly not gruntled.
 

Bedpan

Established Member
Joined
4 Feb 2010
Messages
1,299
Location
Harpenden
What difference would it make if it was water, leaves or even KY? :)
Maybe you would also like to know between which mileposts it is located.
Actually I would like to know where a problem exists, just so i know what to expect if I become stick in a queue, and how far we have got to go before we start moving again. What is wrong with being told that, say, trains are being delayed by a bridge strike just south of Sharnbrook whereas the norm nowadays seems more likely to be "between Bedford and Leicester".

In fact looking now, we have on the National Rail website, " A safety inspection of the track is taking place between Milton Keynes Central and Rugby. Consequently, trains between these stations may be delayed by up to 30 minutes or deiverted (sic) via Northallerton" (sic again). So if my train is crawling along, when can I expect it to pick up speed again. Well, somewhere north of Roade I would suppose, assuming that the person who wrote the message meant Northampton when they said Northallerton.
 
Last edited:

tsr

Established Member
Joined
15 Nov 2011
Messages
7,400
Location
Between the parallel lines
Most people not familiar with an area would know where somewhere prominent like Bedford or Leicester was, but there is no need for them to know about the geographical minutiae of local place names like Sharnbrook which are nothing to do with the public operation of the railway and are only any use to enthusiasts or staff. The official guidance dictates the use of easily-understood locations when describing a “line problem” (disruption) to the public.

One of my small bugbears with onboard announcements on the north WCML and most of the ECML is that the intercity operators’ train managers tend to use their route knowledge to identify the problem but don’t translate it to passengers’ terms. Some of the crews’ recognised waypoints are obviously significant in railway terms but are so socially insignificant as not to even appear on a search of multiple public maps (eg. OpenStreetMap, Google Maps etc.). It would be acceptable to relate it to a really well-known landmark or state “obscure location z, between station x and station y”, and indeed that’s what I’d be expected to do when dealing with passengers.
 

philthetube

Established Member
Joined
5 Jan 2016
Messages
4,192
poor rail conditions are not necessarily restricted to a specific location, a bad day can be a bad day all over part of the issue is that drivers have to expect bad rails everywhere in order to avoid incidents, so very difficult to put locations into words.
 

Bedpan

Established Member
Joined
4 Feb 2010
Messages
1,299
Location
Harpenden
I agree as far as poor rail conditions, and weather related incidents,are concerned, but not derailments, bridge strikes,points and signal failures, cows on the line etc.

It would be acceptable to relate it to a really well-known landmark or state “obscure location z, between station x and station y”, and indeed that’s what I’d be expected to do when dealing with passengers.
Yes, this would be an ideal scenario.
 

johnnychips

Established Member
Joined
19 Nov 2011
Messages
3,826
Location
Leeds
In the same respect, an announcement that 'somebody has been hit by a train on the line between X and Y and we and the emergency services are trying to sort it out' will gain so much more respect and understanding than 'operational incidents'. When such an event occured in Doncaster station last June, and it was absolutely evident what had happened, there was almost complete understanding from passengers that they would be delayed. But in addition, an unautomated human voice frequently gave updates, even if it was 'we're not sure ourselves what is happening yet'.
 
Last edited:

Bedpan

Established Member
Joined
4 Feb 2010
Messages
1,299
Location
Harpenden
Here's another one from this evening "All lines between Plymouth and Totnes have reopened, following damage to the overhead electric wires between these stations. However, whilst services recover, trains may be cancelled or delayed". I begin to wonder if its me, but a quick look at Flying Scotsman on the South Devon Banks on Youtube quickly confirmed that there was no overhead line there, at least, not last weekend. So what overhead electric wires are they referring to? There are some overhead transmission lines crossing the railway at Hemerdon and two more 4 or 5 miles west of Totnes, (and maybe more not on the OS maps): if there was a problem with one of these where it crossed the railway, why not say so?
 

krus_aragon

Established Member
Joined
10 Jun 2009
Messages
6,105
Location
North Wales
That strikes me as being a case of someone selecting the (wrong?) attribution code, and a human-readable explanation automatically generated from that code.
 
Last edited:

FQTV

Member
Joined
27 Apr 2012
Messages
1,067
In the same respect, an announcement that 'somebody has been hit by a train on the line between X and Y and we and the emergency services are trying to sort it out' will gain so much more respect and understanding than 'operational incidents'. When such an event occured in Doncaster station last June, and it was absolutely evident what had happened, there was almost complete understanding from passengers that they would be delayed. But in addition, an unautomated human voice frequently gave updates, even if it was 'we're not sure ourselves what is happening yet'.

If I recall correctly, the specific wording used in such incidents was carefully agreed upon by a number of interested parties including the British Transport Police and The Samaritans. Having been involved in an incident, I agree with their position.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,061
Location
St Albans
I wonder whether some regular passengers are more interested in the reason for a delay than its impact. Excluding enthusiasts who have an interest in anything unusual, it seems that they want to know the reason so that they can pass judgement on those giving it.
If the journey is important, I would regard information about the likely impact far more necessary than finding an excuse to whinge about various parts of the railway/passenger behaviour/selfish (desperate) depressed people. The most important information when you are waiting on a station is when/if your train will run and what you can do to mitigate the delay if necessary.
 

FGW_DID

Established Member
Joined
23 Jun 2011
Messages
3,035
Location
81D & 81E
Here's another one from this evening "All lines between Plymouth and Totnes have reopened, following damage to the overhead electric wires between these stations. However, whilst services recover, trains may be cancelled or delayed". I begin to wonder if its me, but a quick look at Flying Scotsman on the South Devon Banks on Youtube quickly confirmed that there was no overhead line there, at least, not last weekend. So what overhead electric wires are they referring to? There are some overhead transmission lines crossing the railway at Hemerdon and two more 4 or 5 miles west of Totnes, (and maybe more not on the OS maps): if there was a problem with one of these where it crossed the railway, why not say so?

Looking for something else on Tyrell Check last night, I did see an incident noted in that area involving overhead power lines that had come down. So what has been said is correct but could maybe have been worded better.
 