...and that really seems to be the root of the problems on the Hope Valley. The sections are all relatively short between Totley Tunnel and Cowburn Tunnel, with IB sections in both directions between Grindleford and Earles, and between Earles and Edale. There's no point having shorter sections if it just means that you're only going to get a bit closer to a train that you can't overtake anyway. At the east end, the stop signals either side of Totley Tunnel in each direction are already pretty much as close as they could hope to be, with Totley Tunnel East having a tail lamp camera too to speed things up whilst a long freight train (clear of the clearing point but with the rear not past the box) waits for a path. At the west end, Edale to Chinley is a fairly long section and probably one of the most problematic for a fast train (Manchester bound) catching up with a stopper, but the Chinley stop and multiple-aspect signalling from there to New Mills South means that you'll still not be all that far behind it by the time it finally gets out of the way.If the primary limit on capacity is the difference in running times between different tiers of service at the desired frequencies and even intervals, then ETCS, even at a notional level 3, can make little difference to throughput. A little more closing up potential at stations perhaps, but nothing major. No signalling system on Earth can make faster trains pass through slower ones!
So no, I don't think resignalling on its own will make much difference at all!