Please don't let what I have actually said get in the way of a good argument.
I will repeat, for the third time, that I am in favour of as much railway being built, everywhere, as the country needs, because I want to see a huge modal shift from road to rail. I am not against high speed rail, but I am critical of HS2 as planned. Is that clear ?
I understand that you are critical of HS2, but the problem is that there's a lot of people who would agree with you that HS2 is bad and so don't want any HS lines built.
The problem with building HS lines to Liverpool as part of the basic package is that it pushes the costs for HS2 higher. As such you will get more people saying that we are spending too much money on it and something else should happen.
As such the end result is that HS lines to Liverpool is less likely to happen.
Now, it seems to me that the people who are against railway expansion are people like you, because if you weren't you'd be arguing for a high speed line to be built the whole way to Liverpool. Instead, you are spending quite extraordinary amounts of time and energy trying to convince me that Liverpool should be content with inferior infrastructure, and either economic shrinkage, or less growth than other places which HS2 serves properly.
If you look at the sorts of posts I generally post on here they tend to be supportive of be rail services and lines and look for ways of making incremental steps to bring wider benefits, which is what I'm doing here.
I'm suggesting build HS2 and then expand it. In doing so there's going to be more support for doing so as there will be a clear customer base with passenger flows which can be used to argue for funding for the extra schemes.
I suppose you'll say something about having to draw the line somewhere. But why there ? It would cost a fraction of the overall project price to build a high speed line to Liverpool, by far the largest conurbation in England that won't have one, and also the closest conurbation to the trunk line not to be served. The city even offered to go into debt to pay for it itself, and that was turned down too.
There's got to be somewhere where construction finishes, even for a phase. Much in the same way that phase 2a and 2b have been split from the original phase. By splitting that up it allows one part to be delivered earlier than the other and so implement the benefits to the one being built first.
Let's for argument say that the spur to Liverpool was originally part of phase 2, now let's say that it was split off and became phase 2c and was set to open in 2038. How much different if that from where are at?
I would suggest planning and funding, it could still be opened by then or shortly after.
I agree that it's odd that Liverpool hasn't been allowed to part fund it themselves.
I see that you have repeated the strange argument that Liverpool stands to lose out more if HS2 is a success. Doesn't that just emphasise how ineffective HS2 risks being as a way of reducing economic disparity ? Think about it, and you will see why I'm struggling to take your position seriously.
I've said if I'm reading the table right then the better HS2 does the more likely Liverpool will be to loose out.
Therefore, if this is the case, the reason it becomes inefficient is the same way any railway which has too many people using it. In that the busier it gets the harder it is to provide a good service to everywhere.
I see that you also repeat the assertion that HS2 makes a high speed line to Liverpool more likely. (Yet) again I will remind you that there is no definitive plan, no funding, and no enabling legislation for any high speed line to Liverpool. If HS2 makes it such an inevitability, why don't they just finish the job and build it ? If it's so vitally necessary to the economic health of the nation that a high speed line is not built to Liverpool now, what's going to change at any point in the future which will make it more likely ?
I said if HS2 is a success then the link becomes more likely as there will be passenger numbers to support it.
Let's say that HS2 opens in 2027 and has more passengers than expected. Let's say 10% more. If that's the case then it becomes easier to say we need this link because there's lots of demand now and so we need to do more to cater for future passenger numbers. You will also find that there's more money in the railways pot meaning that they need less money from the treasury.
The more passenger growth happens the stronger the case for improvement.