• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Bangkok airport rail link preview.

Status
Not open for further replies.

Snapper

Established Member
Joined
28 May 2006
Messages
2,463
Location
All over the place
I'm currently sitting at Bangkok Airport ready to fly back after being on a press trip to look at Siemens projects in the city - which included a trip on the new rail link which will open early (ish) in 2010. Here's the first few pictures. Some might find that the trains look rather familiar...

http://paulbigland.fotopic.net/c1769614.html
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

turbo mick

Member
Joined
17 Aug 2005
Messages
184
Location
reading
Great pictures mate

Iam over in thailand in november shame the airport link wont be open.ive enjoyed travelling on thailands railways.They have had a few high profile accidents recentley which have damaged there reputation.

cheers
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
The baggage car is interesting- I take it that's designed to take the standard luggage containers used on aircraft? I see that passengers will be able to check in luggage at the station in the city, so I assume the idea is that they're loaded into secure containers on the trains to go to the airport?

Edit: also, they're 360s! Look a bit wierd without the yellow front and with the extra-power aircon pods.
 
Last edited:

turbo mick

Member
Joined
17 Aug 2005
Messages
184
Location
reading
You didn't see any of the Class 158's Thai Brides did you?

Ive been on the 158 conversion to Hua Hinn quality unit aircon was working and we got fed and watered as well about 400bht.

Its madness trying to get out of bangkok initially about 12 level crossing,road traffic takes priority:)
 

Snapper

Established Member
Joined
28 May 2006
Messages
2,463
Location
All over the place
I've added a huge number of extra pictures today - not just of the airport link but also of visits to the MRT depot and control room.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Wonder why they went with something from the "Desiro UK" product line specifically as opposed to the other Desiro lines. After all, on a brand new, isolated, system they were not so constrained by gauge in the manner of UK lines?
 

starrymarkb

Established Member
Joined
4 Aug 2009
Messages
5,985
Location
Exeter
The Thai loading gauge is similar to ours, I'm guessing they have one eye on a future re gauging for the metre gauge network
 

Snapper

Established Member
Joined
28 May 2006
Messages
2,463
Location
All over the place
The Thai loading gauge is similar to ours, I'm guessing they have one eye on a future re gauging for the metre gauge network

Various plans have been mooted for gauge conversion or dual gauging in the past. But as that part of Asia is almost exclusively metre gauge there are logistical problems.

The reason the airport line is standard gauge is - this is what was being offered by the successful bidders. The Japanese bidders were offering a metre-gauge system.
 
Status
Not open for further replies.

Top