Ah bimodes, the solution to all problems, the ultimate panacea.........Any new locos bought for the network from now on should be a bimodes
Ah bimodes, the solution to all problems, the ultimate panacea.........Any new locos bought for the network from now on should be a bimodes
A smaller loco would be too small for a bimode operation surely? I still think my engine and tender idea works best. Would suit a slightly smaller than type 5 loco.
Why 10?
'Hazard a guess' based on what? Even if that were the case (and we have no idea beyond blind guesswork) I assume you will be prepared to compensate DRS for any increased costs they incur and/or compensate them for lost revenue if they fail to live up to the Cat or the MTU equivalents?
So to the contrary, there should be a market for a lighter, just <2,000hp, ETS, RA5, type 3 loco capable of 90-100mph.
Aside from test trains a "new" loco could potentially replace the 68s that are currently working fairly short-formed passenger turns such as Chiltern, Anglia, Northern (and maybe even TPE in the mid-/long-term) leaving the 68s to work the heavier freights for which they were designed.
A smaller loco would be too small for a bimode operation surely? I still think my engine and tender idea works best. Would suit a slightly smaller than type 5 loco.
Why 10?
And against the MTU 4000, the VP185 uses less fuel, less oil and goes longer between overhauls.AS for the VP185 "failing to live up to the Cat and MTU equivalent", I think you will find the VP185 has done considerably more duty on UK metals than the Cat 175.
That’s interesting. I didn’t know that.And against the MTU 4000, the VP185 uses less fuel, less oil and goes longer between overhauls.
how about hst (mtu) power plant?..plenty of them going to be doing the rounds....just add bogie.Is there any point in replacing the 37's EE V12 with something more modern / cleaner / quieter & possibly more powerful?
Assuming of course that said 37's were worth keeping, (corrosion/ old wiring, etc.)
And the HST MTUs are now into their third full overhaul cycle (i.e. beyond the second QL4). They were only expected to do two cycles.how about hst (mtu) power plant?..plenty of them going to be doing the rounds....just add bogie.
only about 10 years old,plenty of spares and kicks out 2200bhp....nicely in type 3/type 4 territory.
vivarail getting a sideline in freight loco's now?
Type 3s would be most useful for various jobs providing the RA is right. CS should have went for something like this in place of the silly 73/9 order.
Why CS didn't rebuild 37s or even 47s instead of the silly 73/9s Ill never know. 73/9 RA isn't great, why keep the third rail capability for locos that will be working mainly on non third rail lines?
Maybe these new locos would be more suitable with ETS capable of CS Mk5.
Even the bigger 88 can only squeeze in a 1000bhp engine, I was assuming the person was making that comment in jest after all the bimode DMU discussions here.
Well, since DRS is an indirectly nationalised business, I’d hope they make the right choice to ensure the money of the tax payer is spent right....
Essentially, from what I can tell, they’re looking for locomotives that can almost compete with the 73s, in some senses... While unlikely, I’d love to see a UK diesel Siemens vectron![]()
The VP185 has been used for almost 24 years.I think you will find the VP185 has done considerably more duty on UK metals than the Cat 175.
I thought thats why DRS ordered the 88s only to be undercut by GBRF for the sleeper contract at the last minute?
Same could be said for the 92s.
The Class 88 is a lightweight Bo-Bo locomotive.
A Co-Co would have far more weight and significantly more room to spare.
It also has substantially more power than a pure diesel locomotive would have, implying that its traction transformer is bigger than you would need for a ~3000hp bi-mode.
yes,sort of. you'll get better tractive effort with 6 sets of traction motors,so able to pull heavier loads/better acceleration(depending on how the motors are geared/wired)All current new build have been bo-bo whereas our beloved Class 37 is co-co. Is there any merit in a new build co-co?
They were not undercut by GBRf. Each of the three bidders for the sleeper franchise had a different traction provider: GBRf, DRS or DB. Serco had GBRf as their provider so when Serco won, GBRf got the contract as a result.I thought thats why DRS ordered the 88s only to be undercut by GBRF for the sleeper contract at the last minute?
Even the bigger 88 can only squeeze in a 1000bhp engine, I was assuming the person was making that comment in jest after all the bimode DMU discussions here.
I had thought RA was more about axle loading, how is it worked out?
RA is about individual axle weight, a Co Co is 6 axles, whereas Bo Bo is 4. So it's total loco weight divided by either 4 or 6.I thought the same hence the Class 37 is RA5 while the lighter 73/9's with a Bo-Bo arrangement are RA6. The Bo-Bo Class 67 is RA8 and on another topic here I think someone said it had very high track access charges? I've been curious what the trade offs are since a lot of the recent new engines are Bo-Bo, Wikipedia doesn't show much detail apart from to mention more wheels to reduce axle load, to improve traction or Bo-Bo layouts to improve cornering speed.
RA is about individual axle weight
so the bogie needs to be short wheelbase if possible..that'll keep the RA low.
American engines have a reputation amongst motorcyclists and motorists for being less refined, shall we say, than European or Japanese designs.
Even the US locomotive builders know this and adapt European engines which is why the current GE GEVO and Powerhaul engines are derived from EU designs (Deutz and Janbacher respectively). I even read on another forum that the EMD 1010 probably shares its genes with the MTU 8000.
I think a modest power centre-cab design would have its place in the UK scene.
I hope you're not referring to the fabled publication called "The Scotsman"?Carting round traction equipment that will see very little use, RA6, isn't the thermal efficiency of one large prime mover better than two small units? It's not been the most successful of rebuilds.
It just seem a strange choice. As I recall there was quite a heated discussion on the suitability of these locos for the job required.