I'd assume that refers to 102% of the requisite 92, rather than 102% of the entire fleet. though if that's the case, I wonder what the previous target was...
![]()
New CGI of a Class 720/5. Photo courtesy of Greater Anglia.
isn't this a corporate livery? maybe acceptable as quite neutralMe too @dp21, I think it actually looks good. That's a sensible plan with the numbers too.
I see that a 755 will be at Innotrans 2018.
There's a few pedestrian crossings on the electric branches too, Network Rail have met with a lot of local resistance in its attempts to close some of them.Interesting that these have gone yellow fronted as well. Has it been done for consistency across the fleet, as I had been under the impression that it was only level crossings on some of the rural DMU lines that necessitated the yellow front on the short flirts.
I agree Wivenswold, though I quite like the little yellow front I'm not so keen on those without, except the refreshed 378s, they look somewhat Japanese.There's a few pedestrian crossings on the electric branches too, Network Rail have met with a lot of local resistance in its attempts to close some of them.
I really don't understand issues like those coming up at times like these. This order was announced in at least as much detail as vehicle length well over a year ago and the first units are nearing completion ready for testing - how has nobody noticed this up until now?
Thanks for the update on Renatus. 7 months before the planned service entry date of the first 720s and four units haven't even gone to Doncaster yet... I sincerely hope another TOC has plans for these units!
Thanks for the update Alfie1014.
Latest on the Renatus project. We have 301-319 and 321 refurbished and back in service. 320, 323-327 at Doncaster (unless one sneaked back unreported) and 322, 328-330 still to go. So your chance to experience what's left of First Great Eastern decor on those last 4 units are running out. 321448 is, as reported above, at Clacton Depot presumed to be under preparation for service. Strange that 322 seems to have been missed out so far.
Me too @dp21, I think it actually looks good. That's a sensible plan with the numbers too.
I see that a 755 will be at Innotrans 2018.
Interesting that these have gone yellow fronted as well. Has it been done for consistency across the fleet, as I had been under the impression that it was only level crossings on some of the rural DMU lines that necessitated the yellow front on the short flirts.
I really don't understand issues like those coming up at times like these. This order was announced in at least as much detail as vehicle length well over a year ago and the first units are nearing completion ready for testing - how has nobody noticed this up until now?
I'm really tempted to put in a FOI act request for the indicative timetable used by the bid team to calculate rolling stock requirements and compliance with the minimum service standards in the agreement. I bet it's a work of utter fiction.
It wouldn’t be the first one. The National Express Lowestoft / Peterborough bid timetable had to be completely re-written to make it work operationally, although running just 3 car 170s to Liverpool St was always going to create ‘issues’.
Bid teams rarely have the detailed knowledge to put together an operationally coherent bid. If they did they wouldn’t win, you need to be bold and innovativeIt is then left to the incumbent staff to put it right, but Wickford and Hertford East look particularly challenging.
It does sound a bit like that doesn't it, almost like they are preparing the blame culture for what follows. But ultimately Kean and Burles both have bid director history with Abellio so it's pretty hard to believe that they would not have had any input with the operational side and also the bid side.I think it was Jonathan Denby who said, in an email to me, that the bid team had put forward the specification for the franchise and it was now for the GA Ops team to fit the trains ordered into the new timetable. At the time I thought it sounded like excuses were already being lined up for the inevitable internal investigation into what went wrong. I also noticed that he ignored my question about contract clauses for additional units if required.
More recently Mike Kean batted away my concerns about the unit lengths for peak shoulder services with a haughty "I think you'll be impressed with the amount of extra seats". Could be read as "You're worrying over nothing" or an avoiding tactic.