I have it on reasonable authority that there will be an announcement within next week and decisions have been taken.
However that is caveated in that within that week they may decide against announcing anything or delay it. But information is starting to filter out.
I have long theorised that Grayling would cancel the platform 15 & 16 project and turn the Ordsall Chord into a white elephant as to have an excuse to spend less on the North.
The Ordsall Chord is a white elephant whether P15/16 are built or not. It was an utter waste of money built essentially only with the objective of running yet more half-empty trains to Manchester Airport when terminating them in the low numbered platforms at Piccadilly would make more sense.
Regular readers will be well aware of your views on rail connections to Manchester Airport but they are irrelevant. Permission for Manchester's second runway included ensuring the airport having a policy to promote the use of public transport as much as possible. Given that the airport's catchment area includes most of northern England it is inevitable that such a policy will lead to through services to a wide variety of destinations. Remember also that the districts of Greater Manchester remain shareholders in the airport and as such will support such a policy ensuring that where possible Manchester's satellite towns have trains to the airport. Given that these towns lie on longer distance routes to/from Manchester it can be no surprise that airport rail services have developed in the way that they have and that they will continue to do so. The Ordsall Chord is a significant facilitator of this as well as making it easier to send services to the airport to terminate rather than occupying valuable platform space in Manchester itself, especially at Victoria.
The Ordsall Chord is a white elephant whether P15/16 are built or not. It was an utter waste of money built essentially only with the objective of running yet more half-empty trains to Manchester Airport when terminating them in the low numbered platforms at Piccadilly would make more sense.
There speaks someone with no empathy with the massive part of the country where Manchester is the "local" airport. It should have a far better rail service than it does.
I regularly use the Airport station in preference to Piccadilly (It is easier to get to for me). I usually catch the TPE Newcastle/Leeds/York or Edinburgh/Glasgow trains from there.Eh? It has without doubt the best train service (in terms of coverage, though the frequency isn't bad either) of any UK airport and has had since the day it opened. Vast swathes of the North West are connected to it directly, and almost all of it with only one change. What exactly do you want? Every train terminating at Picc to be extended there so each one can carry the proverbial one man and his large trolley suitcase[1]?
[1] Dogs aren't so easy on planes.
I regularly use the Airport station in preference to Piccadilly (It is easier to get to for me). I usually catch the TPE Newcastle/Leeds/York or Edinburgh/Glasgow trains from there.
I don't know which these one man and a dog trains are that you refer to. Most trains I catch are 20 to 25% full leaving the station. I can't comment on the Northern Rail services as I don't use them.
I will also comment that when boarding at the likes of Leeds there are many passengers with large suitcases who are immensely grateful for a direct service to MIA.
So where do you propose the Edinburgh/Glasgow units are parked at the Manchester end between services?I was speaking figuratively. With the high loadings at most times of day on many Northern and (particularly) TPE services, there is no justification to waste units providing a duplicated service which is loaded 20 to 25%. With the new TPE 5-car units/stock, this will be even more pronounced, likely to drop to 10-15%. This is an utter waste of money and rolling stock.
It will also ensure that many people choose to drive to the Airport insteadI'm sure there are, but they'll pull their trolley cases further on arrival at the Airport than they would if they had to make a change from even platform 1 to platform 12 at Picc. Hence my view to drop those through services (not all of them, just the Ordsall Chord ones) and provide Class 319 operated services from the Picc main station as a replacement. This would free up at least one (possibly two) Class 185s far more useful for other purposes.
So where do you propose the Edinburgh/Glasgow units are parked at the Manchester end between services?
It will also ensure that many people choose to drive to the Airport instead
Can I suggest re-reading my post and noting which services I said should be removed from the Airport?
Would I be right in thinking that the Southport to Manchester Airport trains have now been re-routed to terminate elsewhere?
I was speaking figuratively. With the high loadings at most times of day on many Northern and (particularly) TPE services, there is no justification to waste units providing a duplicated service which is loaded 20 to 25%. With the new TPE 5-car units/stock, this will be even more pronounced, likely to drop to 10-15%. This is an utter waste of money and rolling stock.
I'm sure there are, but they'll pull their trolley cases further on arrival at the Airport than they would if they had to make a change from even platform 1 to platform 12 at Picc. Hence my view to drop those through services (not all of them, just the Ordsall Chord ones) and provide Class 319 operated services from the Picc main station as a replacement. This would free up at least one (possibly two) Class 185s far more useful for other purposes.
Indeed, add HS2 and The Western Link and we are properly sorted.Maybe it might seem a waste to you, but seeing as Manchester Airport is rapidly expanding with more flights to both short and long haul destinations, the excellent transport links are helping the Airport to justify its big plans. Instead of calling it a waste, we should be applauding a proper transport hub that is genuinely better than any of the London ones .After all, Gatwick lost its very useful link to the north years ago cutting back the southern service and the Heathrow connections to the rest of the country are a disgrace.
For TPE, that's the Middlesborough service then; the Newcastle service is an additional one.Can I suggest re-reading my post and noting which services I said should be removed from the Airport?
For clarity I will explain it again - I am referring to the TPE trains which used to reverse in Piccadilly platforms 1/2 and I believe now use the Ordsall Chord. In my view those trains should terminate at Piccadilly instead (not via Victoria) and not continue to the Airport. This would free up either one or two (I'd have to check but I think two) Class 185s.
For trains that run through 13/14 and cannot do otherwise, it's a terminus of convenience that might as well remain, as there's not really anywhere else to send them other than maybe the Stockport bay which is probably too short..
Driving in London is a big no. In Manchester it is not too bad, so people are easily persuaded to ditch the train. You underestimate the reluctance of non-railway people to change trains. For many people it may be their only train journey of the year.It may ensure that a *few* people drive or take a taxi to the airport; others are happy with connections such as the huge number of people who travel to London and change to the Heathrow Express, Connect or the Piccadilly Line to reach Heathrow, or the Gatwick Express to reach Gatwick. So what? That is to me acceptable against the significant benefit of reduced overcrowding on other services. You cannot have a direct train from everywhere to everywhere.
Maybe it might seem a waste to you, but seeing as Manchester Airport is rapidly expanding with more flights to both short and long haul destinations, the excellent transport links are helping the Airport to justify its big plans. Instead of calling it a waste, we should be applauding a proper transport hub that is genuinely better than any of the London ones .After all, Gatwick lost its very useful link to the north years ago cutting back the southern service and the Heathrow connections to the rest of the country are a disgrace.
Isn't it due to be cancelled the day the summer recess starts!When is the announcement about platforms 15/16, i'm still not convinced that the project will go ahead, the Tories would rather look after there precious London then anywhere else when it come to transport.
Prior to the May timetable change there were 10tph between Manchester Airport and Piccadilly (1*N Wales, 1*Glasgow/Edinburgh, 1*Middlesbrough (reversing at Piccadilly), 1*York (reversing), 1*Cleethorpes (reversing), 2*Piccadilly terminators, 1*Liverpool, 1*Southport, 1*Blackpool/Barrow).The Ordsall Chord is a white elephant whether P15/16 are built or not. It was an utter waste of money built essentially only with the objective of running yet more half-empty trains to Manchester Airport when terminating them in the low numbered platforms at Piccadilly would make more sense.
Certainly, the focus should be on Long Distance services to the airport - where it's worth getting a taxi or lift to the station then on to the airport.
For the more local services, the expense of the train does not outweigh the convenience of a car or taxi.
I live 1.5 miles from my local station and, bar one service a day, need to change to get to the airport. Parking at my local station now costs £3/day, the rail fare is an eye-watering £17.70 for a Short Anytime Return. A taxi can be had for around £35 each way and on airport parking for £40 for the week. It's simply not attractive to travel by train to the airport for a local service. However - advances to Sheffield can be had for £10 each way, that makes a lot more sense!
Being suggested on the TPE electrification thread (see above) that the decision on P15/16 has been made and may be released before the parliamentary recess at the end of next week.
Based on past performance, this leads me to think there may be a repeat of the farce of announcing cancellation of MML and GW electrification last year for which the Boiled Egg has recently received a rollicking from the Transport Committee. Sure it won't stop him though.
Hope to be proved wrong, though I'm not holding my breath.
CW
So, the entire railway system of the north of England has been (badly) rearranged, at colossal cost, to facilitate Manchester Airport'a expansion ? Good to see where our priorities lie