• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Platform 15 and 16 project at Manchester Piccadilly.

Status
Not open for further replies.

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,374
That would mean every Liverpool-Leeds train would cross on the flat at Ardwick and we're back to square one!
That would depend on how many Liverpool-Leeds trains there would be in such a scheme, and simplification of the Piccadilly throat from withdrawal of the majority of the terminating platforms would make room for a flyover of one is required
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bantamzen

Established Member
Joined
4 Dec 2013
Messages
10,508
Location
Cheshire

furnessvale

Established Member
Joined
14 Jul 2015
Messages
4,914
There does seem to be a recurring theme in that article, plans for improvements sat in a Minister's in-tray....
That in itself is an improvement on the days of BR when the BRB was instructed NOT to submit plans so that the minister could claim, hand on heart, that his in tray was empty.
 

randyrippley

Established Member
Joined
21 Feb 2016
Messages
5,382
That in itself is an improvement on the days of BR when the BRB was instructed NOT to submit plans so that the minister could claim, hand on heart, that his in tray was empty.
I heard a rumour that there were two trays for a while.
One labelled "In action"
The other labelled "Inaction"
Guess which one was full...
 

Senex

Established Member
Joined
1 Apr 2014
Messages
2,957
Location
York
i thought they were labelled "in london"
"not in london"
I'd just amend those to "In and for London" and "Other" to make sure that schemes such as the splendid job at Reading are included. Isn't Scotland lucky that transport is devolved?
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Like Heathrow 3rd Runway?

I doubt Grayling took much pleasure from making that announcement. See this jokey account of it by John Crace in the Guardian.

https://www.theguardian.com/politics/2018/jun/05/chris-grayling-heathrow-announcement-commons

Grayling's big Heathrow announcement fails to take off
John Crace

The transport secretary was forced to the dispatch box again for yet another bashing

First trains, now planes. After Monday’s humiliating mauling over the train timetables, Chris Grayling must have been hoping for a bit of recovery time. A chance to lie on his therapist’s couch and free-associate in a doomed search for his self esteem. Instead he was back in the Commons to make yet another statement he would have rather avoided. This time on the government’s decision to give the go-ahead for Heathrow’s third runway.

“The time for action is now,” said a visibly fragile Grayling. This wasn’t actually true. The time for action had been 10 years ago when the government had first decided to expand London’s airport capacity, but previous transport ministers had had the wit to recognise the issue was a poisoned chalice and had successfully managed to kick it into the long grass. Not so Grayling. They don’t call him Failing Grayling for nothing, so it was somehow inevitable that the buck would stop with him.

Grayling cowered at the dispatch box, as if fearful of another punishment beating, as he outlined his proposals. Everything was going to be fine – don’t hit me, don’t hit me – no one was going to be inconvenienced at all – don’t hit me, don’t hit me – the new planes would make so little noise and cause such little pollution that you wouldn’t even know they were taking off or landing. Largely because they wouldn’t be, as the runway wouldn’t be built. At least not for 10 years. Or longer if he had anything to do with it. Sometimes incompetence has its uses. Don’t hit me, don’t hit me.

3000.jpg

Unable to resist a sitting duck, the shadow transport secretary, Andy McDonald, immediately stood up and started hitting him. Repeatedly. He wasn’t going to grace the occasion with a detailed response because Grayling was so clearly out of his depth and no one could trust a word he said. McDonald had a point. Immediately the nervous tic that had afflicted Failing Grayling throughout his train wreck the previous day restarted. It was the most visible sign of intelligent life in the transport minister throughout the session.
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
"Eeee, just think what us could do with £14.3bn!"

"£14.3bn? We were lucky to get £1.2bn for Northern Hub"

"£1.2bn? Luxury! We've had to make do with buses built on coal wagon frames with new seat covers and an LED sign from a kebab shop for the last few years"

"Seats? Seats? We don't get seats, just a close-up view of someone's sweaty armpit while we listen to the superfluous conductor (who takes up valuable standing room) work out which excuse to use next"

"Conductor? On a cattle train? you have it easy my lad. We have to run behind a track trolley being pushed by two modern apprentices and a redundant banker on a retraining placement"
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,374
Well thats because he is not going to approve it... and never will
 

Chester1

Established Member
Joined
25 Aug 2014
Messages
4,442
From the TP electrification thread:

Key Manchester junctions:
Ordsall Lane - good scheme, complex design, grade separation possible
Water Street - no room to do anything except 4-track the OLW viaduct to avoid it
Castlefield - good scheme, multiple solutions, not necessarily grade separated
Ardwick - good scheme, big bridge to get grade separation (requires P15 and 16 at Picc.)
Edgeley - good scheme, big bridge to get grade separation (requires further remodelling of Stockport)

Are any of these plans better value for money than Piccadilly 15 & 16?

I am intrigued by what the Castlefield Junction options are! If big money becomes available before the area gets too built up I would like to see the area redeveloped. I guess the grade seperation options would use the Metrolink viaduct and switch Metrolink to the old viaduct, which I imagine would cost a small fortune to restore? I remember you saying that you think Deansgate station should be closed, which makes sense considering its proximity to Oxford Road and capacity constraints. Demolishing it would also provide more space to rebuild the junction too. An interchange station at Cornbrook would limit the loss of Deansgate Station. Once the rail infrastructure was rebuilt any spare land would be worth a small fortune considering the skyscrappers being built nearby.
 

LOL The Irony

Established Member
Joined
29 Jul 2017
Messages
5,335
Location
Chinatown, New York
From the TP electrification thread:



Are any of these plans better value for money than Piccadilly 15 & 16?

I am intrigued by what the Castlefield Junction options are! If big money becomes available before the area gets too built up I would like to see the area redeveloped. I guess the grade seperation options would use the Metrolink viaduct and switch Metrolink to the old viaduct, which I imagine would cost a small fortune to restore? I remember you saying that you think Deansgate station should be closed, which makes sense considering its proximity to Oxford Road and capacity constraints. Demolishing it would also provide more space to rebuild the junction too. An interchange station at Cornbrook would limit the loss of Deansgate Station. Once the rail infrastructure was rebuilt any spare land would be worth a small fortune considering the skyscrappers being built nearby.
That sounds like more effort than it's worth. Just 4 track from Piccadilly and split it at Castlefield. Although, we should just let the engineer's sort it out.
 

Chester1

Established Member
Joined
25 Aug 2014
Messages
4,442
That sounds like more effort than it's worth. Just 4 track from Piccadilly and split it at Castlefield. Although, we should just let the engineer's sort it out.

There is no chance of any more 4 tracking between Piccadilly and Deansgate stations than currently proposed for platforms 15 and 16. There are high rise buildings on both sides of the viaduct now.
 

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,578
Location
Brighton
I mean, those high-rise buildings don't prevent widening the viaduct, they just make it dramatically less likely...
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,756
Location
Nottingham
Who said the other two had to go alongside?
I was involved with a study circa 2000 where someone suggested double-decking the viaduct, one deck for each direction I think. Not sure how they planned to untangle it at Castlefield Junction, nor how it would have played with the listed building at Oxford Road.
 
Last edited:

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,365
Who said the other two had to go alongside?
Quite. Given the wishes for grade-separation at either end I wondered whether an "El" [evated] type double track line with platforms could be supported somehow above the existing viaduct. I can't see it being possible to put new lines underground. Of course which lines you chose to run up to the elevated section locks your service pattern for ever though...
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
I was involved with a study circa 2000 where someone suggested double-decking the viaduct, one deck for each direction I think. Not sure how they planned to untangle it at Deansgate Junction, nor how it would have played with the listed building at Oxford Road.

Do you mean Castlefield Juncton? Only the southern canopies would be affected at Oxford Road, and you wouldn't need all the existing platforms anyway, three would do. I (and J Locke senior) suggested it, in 2000, but the upper deck went to the CLCs and the lower to Ordsall Lane (then), Water Street (now).

Quite. Given the wishes for grade-separation at either end I wondered whether an "El" [evated] type double track line with platforms could be supported somehow above the existing viaduct. I can't see it being possible to put new lines underground. Of course which lines you chose to run up to the elevated section locks your service pattern for ever though...

You just decide at London Road Junction instead. A few crossover pairs for perturbation management and off you go.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,756
Location
Nottingham
Do you mean Castlefield Juncton? Only the southern canopies would be affected at Oxford Road, and you wouldn't need all the existing platforms anyway, three would do. I (and J Locke senior) suggested it, in 2000, but the upper deck went to the CLCs and the lower to Ordsall Lane (then), Water Street (now).
Yes, it really does my head in that Deansgate Junction is nowehere near Deansgate.
 

Chester1

Established Member
Joined
25 Aug 2014
Messages
4,442
Do you mean Castlefield Juncton? Only the southern canopies would be affected at Oxford Road, and you wouldn't need all the existing platforms anyway, three would do. I (and J Locke senior) suggested it, in 2000, but the upper deck went to the CLCs and the lower to Ordsall Lane (then), Water Street (now).

How much would double decking the viaduct cost? It sounds incredibly expensive, wouldn't it make more financial sense to tunnel between Piccadilly and Victoria?
 

Esker-pades

Established Member
Joined
23 Jul 2015
Messages
3,784
Location
Beds, Bucks, or somewhere else
"Eeee, just think what us could do with £14.3bn!"

"£14.3bn? We were lucky to get £1.2bn for Northern Hub"

"£1.2bn? Luxury! We've had to make do with buses built on coal wagon frames with new seat covers and an LED sign from a kebab shop for the last few years"

"Seats? Seats? We don't get seats, just a close-up view of someone's sweaty armpit while we listen to the superfluous conductor (who takes up valuable standing room) work out which excuse to use next"

"Conductor? On a cattle train? you have it easy my lad. We have to run behind a track trolley being pushed by two modern apprentices and a redundant banker on a retraining placement"

In Scotland they have to make do with a sheep attached to a motorised wheelie bin.
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
How much would double decking the viaduct cost? It sounds incredibly expensive, wouldn't it make more financial sense to tunnel between Piccadilly and Victoria?

That wouldn't help relieve the issues between Castlefield and London Road Junctions caused by trains from Windermere, Barrow, Blackpool, Southport, Kirby, Liverpool and Traffod Park all converging.

Also, do you honestly think that such a tunnel would cheaper that building some portal frames over the existing viaduct? Even at 1 in 50 (which is pretty steep) on the East you'd have to start tunnelling near Thorpes Bridge to get under Victoria, the Irk and the Irwell. From the West you're better off, but probably out towards Eccles to get under the moat and back up. Then miss Guardian and come back up well south of Ardwick (which is above you on a viaduct still) ... that'd all need to be twin bore as well due to the length.
 
Status
Not open for further replies.

Top