LOL The Irony
Established Member
The Civity's and Flirts are running to time.
The Civity's and Flirts are running to time.
Does any project on the railway meet its timescales? Electrification, new trains, even the timetables are running late now.
The reading rebuild was on time, Crossrail appears to be broadly on time (although there's a risk that it could slip a bit), there's probably lots of other examples it's just that they don't make big headlines. In fact even with electrification there's been some projects that did succeed.
Just out of curiosity, other than the 769's and 230's which other units have been delivered later than expected due to problems with the units themselves (so this excludes 80x's due to delays with the electrification, but doesn't rule then it if there's another train related issue)?
345s and 710s are running pretty late as wellJust out of curiosity, other than the 769's and 230's which other units have been delivered later than expected due to problems with the units themselves (so this excludes 80x's due to delays with the electrification, but doesn't rule then it if there's another train related issue)?
385s late due to windscreen issues.
175s and 180s late due to many, many different issues (good old Washwood Heath!)
334s and 458/0s likewise.
345s and 710s are running pretty late as well
Class 230s aren’t running late on production unit deliveries...
And the 230 prototype actually worked straight off and wasn't just a 319 painted in Northern colours with 769 000 shoddily slapped to the front.Class 230s aren’t running late on production unit deliveries...
If the 319 FLEX project fails (which I think it will) then Northern will have a major fleet shortage, potentially leading to them defaulting on the franchise for being unable to deliver. With first the demise of VTEC, and now possibly the demise of GTR, the demise of a third franchise could cause Grayling some major issues...
Personally I'd like to see Stadler bi-modes, and some more 195s and 331s.
As I've already mentioned, it's already failed in regards to being the quick fix that it was supposed to be; in the time it's taken Porterbrook to put some advertising on an unmodified 319 at Long Marston Stadler have produced a new bi mode from scratch. If it doesn't hurry up (based on how many 319s are at Long Marston it doesn't look like the project is making much progress) it'll fail altogether as it won't have provided the self powered PRM compliant unit in time for the PRM deadline.why do you think this will fail? what do you base that assumption on? I notice above you say it has taken a long time to issue a design. As anyone involved in projects will know that could be for any number of reasons unrelated to the technical solution.
Vivarail have produced the 230s on time, and they work. No evidence to suggest the same for the 769s...Very soon a similar conversion job will be running on my line. Why should the northern works fail when these ones ( on a very different base platform) seem to be almost ready to enter service?
As I've already mentioned, it's already failed in regards to being the quick fix that it was supposed to be; in the time it's taken Porterbrook to put some advertising on an unmodified 319 at Long Marston Stadler have produced a new bi mode from scratch. If it doesn't hurry up (based on how many 319s are at Long Marston it doesn't look like the project is making much progress) it'll fail altogether as it won't have provided the self powered PRM compliant unit in time for the PRM deadline.
Vivarail have produced the 230s on time, and they work. No evidence to suggest the same for the 769s...
I do understand the process, I also understand that the 769 has been due to be tested "imminently" for almost a year now. They obviously are having issues otherwise it wouldn't be taking them so long (and the project wouldn't be running anywhere near as late as it is)With respect I am not sure you quite understand the process and approvals involved here. You seem to think it is simply as case of bolting a diesel engine onto the frame and cracking on. Design is not the only factor.
I do understand the process, I also understand that the 769 has been due to be tested "imminently" for almost a year now. They obviously are having issues otherwise it wouldn't be taking them so long (and the project wouldn't be running anywhere near as late as it is)
Vivarail have produced the 230s on time, and they work. No evidence to suggest the same for the 769s...
There are other reasons that could have delayed it by a few months, but I fail to see how such a long delay can be attributed solely to other issues.You assume they are having technical issues. You overlook the fact there are other reasons why the project could be delayed. I suspect the technical solution is fairly easy.
The unit did work, granted it needed a few modifications after the fire which delayed it by a couple of months, but otherwise it's done everything it should. The production 230s are on time, and the first one has been completed.No they haven't. They were supposed to produce a working unit for the previous LM franchise to use but LM were able to pull out of the agreement when the fire incident caused the D-Train release to be delayed.
That seems unduly optimistic. I would assume that trains would continue to be shortformed or cancelled for the foreseeable future until a cheap fix like spare 156s from Scotrail or Greater Anglia, as noted above, could be procured.What would happen to Northern if the Flex project fails?
Personally I think that they'll order Bi-mode versions of the 331's.
Based on classes that's about 1:4 classes delivered since 2000. Which although isn't great doesn't mean that all trains are late.
The unit did work, granted it needed a few modifications after the fire which delayed it by a couple of months, but otherwise it's done everything it should. The production 230s are on time, and the first one has been completed.
The unit did work, granted it needed a few modifications after the fire which delayed it by a couple of months, but otherwise it's done everything it should. The production 230s are on time, and the first one has been completed.
That was one unit that wasn't delivered for a short term trial run, and that was only because LM pulled out as they didn't want to wait a couple of months for the modifications needed after the fire.The unit wasn't delivered to the previous LM franchise to the timescale agreed though.
There are other reasons that could have delayed it by a few months, but I fail to see how such a long delay can be attributed solely to other issues.
The first 769s were supposed to have entered service two months ago, but they didn't. If that's not an indicator that the project is running late then I don't know what is...How have you decided that the project is late? Is it simply an advert on a website that drives your conclusion?
The first 769s were supposed to have entered service two months ago, but they didn't. If that's not an indicator that the project is running late then I don't know what is...
Agreed, Northern and ATW will both have a rolling stock crisis's if the 769s don't appear. GWR at least theoretically have the option of keeping the 332s if the 769s don't appear, so they won't have as much of a rolling stock crisis as Northern or ATW would.It seems to me that Porterbrook made a colossal blunder by playing their hand far too early, long before it was proven that the concept would work. Now, having attracted a lot of interest, they've left several TOCs in the lurch, with very real rolling stock crises looming.
GWR have ordered 19 of these things!
If they knew that they couldn't deliver operational units in time for the May 2018 timetable change then they should never have claimed that they could. If what you're saying about the 769 project is correct, why haven't Porterbrook announced any revised timescale at all?but do you accept there could be very good reasons why that is not the case? I might suggest looking into the verification and approval process.
Working in railway projects ( in fact any "new" build project) there is often a disconnect between what the PR people want to say and what the experts delivering the project want to say date wise!
Porterbrook have always seemed more interested in getting name recognition than actually innovating effectively. IIRC they're the only ROSCO who painted stock in their own livery, including a Deltic of all things!I can see an ironic situation arising in which Vivarail hoover up the 319s sat dormant at Long Marston, have a go themselves and do the job far faster and more effectively than Porterbrook (who are developing something of a track record of overrunning projects, spiralling budgets and failed concepts).
It's frankly embarrassing that such a big and (supposedly) reputable company continues to struggle to develop what should be a simple project, while a bunch of upstarts in a field in Warwickshire have a product ready for market on a comparable shoestring. It should also serve as a huge red flag for any TOCs toying with doing similar business with them in the future.
That was one unit that wasn't delivered for a short term trial run, and that was only because LM pulled out as they didn't want to wait a couple of months for the modifications needed after the fire.