transmanche
Established Member
- Joined
- 27 Feb 2011
- Messages
- 6,021
Yes, thank you.
T for train or trenau?
http://www.railwaygazette.com/uploads/pics/tn_gb-walesborders-dtrain.jpg
You've forgotten the two sidings behind the down platform:Is that really the case? My reading is that anything from the East terminating at Bangor then has to run into Belmont Tunnel to reverse into the Up platform. Which means that trains have to sit in one of the two platforms, or on the Down Main!
I know it is pretentious, but what if the TfW actually looked at our threads and came up with the same conclusion regarding the disbenefit of splitting serviices. The alternative would be that they weren't even thinking of it, despite the rhetoric.
It seems the Civitys will have gangways and the Flirts won't.
Not entirely consistent...
It seems the Civitys will have gangways and the Flirts won't.
Not entirely consistent...
According to the presentation that was briefly released on Tuesday:
£15m has been allocated to improve accessibility and provide step free access at Wales' 247 stations.
Considering that it cost £12m to make 5 stations fully accessible recently, how many stations will be made fully accessible with £15m?
Surely we should be aiming for every station in Wales to be fully accessible (eg. with lifts to all platforms) by the end of the franchise?
Given that would cost in the region of £500 million one could question whether it would be worth it.
But yes £15 million is a pitiful amount. A classic government fig leaf of say look we've invested £X million to solve Y, when X seems big compared to household costs but trivial on a governmental scale.
I can't find anything about how services at Crewe, Nantwich and Wrenbury will be affected. Can anyone help?
What I would like to see is:
1ph Manchester Piccadilly - Milford Haven/Pembroke Dock - Nantwich receives all calls
1p2h Crewe - Aberystwyth - Crewe, Nantwich, Wrenbury, Whitchurch, Prees, Wem, Yorton, Shrewsbury and continues to Aberystwyth
1p2h Crewe - Llandrindod - Crewe, Nantwich, Wrenbury, Whitchurch, Prees, Wem, Yorton, Shrewsbury and continues to Llandrindod/Swansea via Heart of Wales
This would provide better links between Wales and the North of England, and better connections from smaller towns in Cheshire and Shropshire to Crewe and Shrewsbury.
I can't find anything about how services at Crewe, Nantwich and Wrenbury will be affected. Can anyone help?
What I would like to see is:
1ph Manchester Piccadilly - Milford Haven/Pembroke Dock - Nantwich receives all calls
1p2h Crewe - Aberystwyth - Crewe, Nantwich, Wrenbury, Whitchurch, Prees, Wem, Yorton, Shrewsbury and continues to Aberystwyth
1p2h Crewe - Llandrindod - Crewe, Nantwich, Wrenbury, Whitchurch, Prees, Wem, Yorton, Shrewsbury and continues to Llandrindod/Swansea via Heart of Wales
This would provide better links between Wales and the North of England, and better connections from smaller towns in Cheshire and Shropshire to Crewe and Shrewsbury.
I can't find anything about how services at Crewe, Nantwich and Wrenbury will be affected. Can anyone help?
What I would like to see is:
1ph Manchester Piccadilly - Milford Haven/Pembroke Dock - Nantwich receives all calls
1p2h Crewe - Aberystwyth - Crewe, Nantwich, Wrenbury, Whitchurch, Prees, Wem, Yorton, Shrewsbury and continues to Aberystwyth
1p2h Crewe - Llandrindod - Crewe, Nantwich, Wrenbury, Whitchurch, Prees, Wem, Yorton, Shrewsbury and continues to Llandrindod/Swansea via Heart of Wales
This would provide better links between Wales and the North of England, and better connections from smaller towns in Cheshire and Shropshire to Crewe and Shrewsbury.
Any mention of plans for services to Manchester/Birmingham were studiously avoided in the context of Manchester or Birmingham services will improve. You had to look at the other end of the service like the commitment for 1st class sections on Manchester to Swansea by 2024 was tucked away in the Mid & West Wales Summary not the Borders one which it will primarily be for!
Rail Technology Magazine are reporting that the Civity Fleet will be 44 x 2 car & 26 x 3 car by the end of 2022 with a further 7 x 2 car in 2024.
So the Civity fleet will have to cover.
1 tph Bangor to Manchester Airport (6 diagrams)
1 tph Llandudno to Liverpool (5 diagrams)
Conwy Valley (1 diagram)
1 tph Crewe to Chester shuttle (1 diagram)
0.5 tph Liverpool to Shrewsbury (3 diagrams)
0.5 tph Liverpool to Cardiff (5 diagrams)
0.5 tph Crewe to Shrewsbury local (1 diagram)
0.5 tph Pwllheli/Aberystwyth/Shrewsbury/BHM INTL/Chester/Holyhead. (17 diagrams)
0.5 tph Aberystwyth to Shrewsbury (2 diagrams)
5 tpd Cardiff to Holyhead (3 diagrams)
1 tph Manchester to Carmarthen (11 diagrams)
0.5 tph Carmathen to Milford Haven (1 diagram)
Thats 56 diagrams to cover from 70 units. So there's some scope for peak strengthening in 2022 but the real capacity boost will be when the final batch arrives.
Any mention of plans for services to Manchester/Birmingham were studiously avoided in the context of Manchester or Birmingham services will improve. You had to look at the other end of the service like the commitment for 1st class sections on Manchester to Swansea by 2024 was tucked away in the Mid & West Wales Summary not the Borders one which it will primarily be for!
Rail Technology Magazine are reporting that the Civity Fleet will be 44 x 2 car & 26 x 3 car by the end of 2022 with a further 7 x 2 car in 2024.
So the Civity fleet will have to cover.
1 tph Bangor to Manchester Airport (6 diagrams)
1 tph Llandudno to Liverpool (5 diagrams)
Conwy Valley (1 diagram)
1 tph Crewe to Chester shuttle (1 diagram)
0.5 tph Liverpool to Shrewsbury (3 diagrams)
0.5 tph Liverpool to Cardiff (5 diagrams)
0.5 tph Crewe to Shrewsbury local (1 diagram)
0.5 tph Pwllheli/Aberystwyth/Shrewsbury/BHM INTL/Chester/Holyhead. (17 diagrams)
0.5 tph Aberystwyth to Shrewsbury (2 diagrams)
5 tpd Cardiff to Holyhead (3 diagrams)
1 tph Manchester to Carmarthen (11 diagrams)
0.5 tph Carmathen to Milford Haven (1 diagram)
Thats 56 diagrams to cover from 70 units. So there's some scope for peak strengthening in 2022 but the real capacity boost will be when the final batch arrives.
Do those figures allow for the fact that some Manchester to North Wales services already have 4 carriages so it will need to be more than one 2 or 3 car unit per diagram to remain the current capacity level?
Operators seem to diagram around 90% of their trains in regular use so around 7 units available for strengthening isn't all that much, considering how full some services currently get.
It will build 44 two-car and 26 three-car units, which will be in service by September 2022, and a further seven two-car units to be delivered in September 2024.
There is 11 more 3 car units than now to factor in as well. Let's see would there be enough for Manchester to West a Wales, Manchester to Bangor & Holyhead to Cardiff DMU"s?
I suspect a more mix and match approach may occur and some 4 car formations will be running.
http://www.railtechnologymagazine.c...-80-locally-made-trains-for-wales-and-borders
With the Commitment to run First Class between Swansea and Manchester by 2024 the above is perhaps hinting at only one train every two hours having this facility. The follow on order is clearly linked to the commitment but only 7 units when you need 9 diagrams covering for the current hourly service? Assuming that the follow on order will have first class sections - your not going to stick them in stock running around declassified for two years or retrofit new units?
seems strange to me that after all the effort made to make TrawsCymru a recognised brand on the buses as "filling in gaps in the rail network" TfW doesn't use the existing Traws branding on the trains now!
2025 is the first summer after the full fleet is in service Dec2024. As far as I can see it's only the line north of Tywyn that will get the enhancement and Sunday only. It will need 2 units and crew to cover it.Also was there talk of an extra 'fast' service Tywyn - Pwllheli from 2025 which would need an extra 2/3 diagrams. This was mentioned alongside improvements to Sunday services on the line so have no idea whether they will operate all week (I assume so) or if they will go through to Machynlleth to link to the extra Shrewsbury - Aberystwyth service
2025 is the first summer after the full fleet is in service Dec2024. As far as I can see it's only the line north of Tywyn that will get the enhancement and Sunday only. It will need 2 units and crew to cover it.
Maybe they'll only have the first class on the Carmarthen services then.
Or could they split the service at Swansea with 2 car (plus first-class) running Manchester to Swansea with another 2 car unit running Swansea West. Would that take it down to 6/7 diagrams?
The full set of units would allow no 2 car running except the Conwy Valley. Before that there will be at least one 2 car running alone. Disappointing.
That's interesting - a completely isolated non-connectional service. Is there a very high amount of local demand that vastly outstrips demand to connect at Mach? That isn't at all my observation.
That's interesting - a completely isolated non-connectional service. Is there a very high amount of local demand that vastly outstrips demand to connect at Mach? That isn't at all my observation.
I don't think we'll see anything 2 car run into Manchester/Cardiff/Birmingham, however they could appear on the Liverpool- Shrewsbury turns.
Cambrian mainline will be 4 car , 2 car, 4 car, 2 car etc initially.