Mintona
Established Member
Had my first go on the mainline today. It’s a really lovely train to drive.
Had my first go on the mainline today. It’s a really lovely train to drive.
I wouldn’t expect 800s to be diagrammed West of Taunton in ordinary scheme of things; similarly I wouldn’t expect 802s to be diagrammed to go to Swansea - but I don’t foresee any issues of either happening if it had to.
Imagine one at St Ives![]()
Your a driver? If so, cool!
800026 on the way to Penzance on a test run from Stoke Gifford.
See they been having issues with short forms this week on South Wales/Bristol services. Are they having units going in for service.
They were on 5Z23 on Monday. The TOC for this service is shown as ZZ rather than GW, so if that can be taken as a guide then I guess that they haven't been officially handed over yet, but I may be reading too much in to that.
http://www.realtimetrains.co.uk/train/K97216/2018/05/21/advanced
Thats because the movement is arranged by another party, i.e. ROSCO, and driven by a "Freight" Company driver on their behalf. It happens with all Works movements.
Loads of pics available online, eg:Do these trains have 'glass cockpits' (main instruments replaced by computer screens)?
Not my shot, but 800007 has now been delivered. https://flic.kr/p/Ka1WES
Only 002 left to leave Aycliffe, and then all the /0s will have been delivered to GWR.
My apologies; I meant to say Doncaster, but it got lost in translation!800002 is a Japan built train, nothing to do with Newton Aycliffe.
It is currently at Doncaster having final work/tests done before it finally moves officially to GWR.
Then, 003 and 004 will need bringing up to spec, and to be fitted out fully as they are (or were) purely Hitachis test trains.
Not my shot, but 800007 has now been delivered. https://flic.kr/p/Ka1WES
Only 002 left to leave Aycliffe, and then all the /0s will have been delivered to GWR.
21 9 car 800’s are being delivered with the first passenger service on 25 June on the Cheltenham service internally but expected to start appearing throughout the rest of the year and hopefully we see it on a Bristol/South Wales service by end of July/August.Apologies if this has been covered already, but when are the 9 car 800/3's entering service on London-Bristol/Swansea services? How many have already been delivered to GWR? Thanks..
Thanks for the info. I'm glad the 9 car ones are coming to South Wales services..the sooner the better. If the DFT had any sense, these would have been built first. We have had to suffer 2x5 sets since last October where you can't walk through the entire train and you have no idea where to stand on the platform for First Class travel. The real problems start when they send just one 5 car unit on a Swansea service and everyone is packed in like sardines and the "wonderful" trolley service is permanently stuck at one end of the train. Daft idea building 5 car trains in the first place, as it doesn't allow for growth or busy periods e.g. easter, xmas, sporting events etc when GWR are in dire need of extra capacity. You'd think these people would learn from XC and the awful Voyager..too small and not fit for purpose most of the time for the journeys it does. Sense would have been to build at least 30 x 9 car sets to cover the core major diagrams and 36 x 7 car units instead, giving passengers 5.5 coaches of standard class, so a 7 car can easily substitute for a 9 car set without too much pain for passengers?21 9 car 800’s are being delivered with the first passenger service on 25 June on the Cheltenham service internally but expected to start appearing throughout the rest of the year and hopefully we see it on a Bristol/South Wales service by end of July/August.