velaro
Member
The development of Sandymill is far from over, and I'll get to work on it again when I get the chance. I might be somewhat less faithful to the original routes than I have been so far, and thus I need advice from people who know real-life UK railways better than I do.
PSR warnings boards: I understand that they are not required if the speed reduction is less than 30 mph and less than 1/3 of the previous speed limit. My question is: are they always omitted, or usually, or rarely?
Stopping boards: those little signs with the number of cars or just an S on them. The current version of the Sandymill lets all trains stop at the same board, whether they have two or ten coaches, and I want to change that. I'm not sure about the role of locomotives in this. If the board says 8, does that mean a locomotive with eight cars can stop there, or only locomotives with up to seven cars (7 + 1)?
High-speed approach to terminal station: in the current Sandymill, the approach to Invermay station features successive speed reductions to 60, 40, and 20 mph, and also block signals that are kept at YY and Y unless another train in front forces more restrictive aspects. Is that realistic? What kind of safety measures would normally be used if a 90 mph line ends in a terminal station?
Please keep in mind that the Sandymill is meant to represent Scotland, 1986-1993 (more loco-hauled trains, no TPWS, etc.).
PSR warnings boards: I understand that they are not required if the speed reduction is less than 30 mph and less than 1/3 of the previous speed limit. My question is: are they always omitted, or usually, or rarely?
Stopping boards: those little signs with the number of cars or just an S on them. The current version of the Sandymill lets all trains stop at the same board, whether they have two or ten coaches, and I want to change that. I'm not sure about the role of locomotives in this. If the board says 8, does that mean a locomotive with eight cars can stop there, or only locomotives with up to seven cars (7 + 1)?
High-speed approach to terminal station: in the current Sandymill, the approach to Invermay station features successive speed reductions to 60, 40, and 20 mph, and also block signals that are kept at YY and Y unless another train in front forces more restrictive aspects. Is that realistic? What kind of safety measures would normally be used if a 90 mph line ends in a terminal station?
Please keep in mind that the Sandymill is meant to represent Scotland, 1986-1993 (more loco-hauled trains, no TPWS, etc.).
