• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Blackpool - Manchester Electrification

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK

The_Engineer

Member
Joined
24 Mar 2018
Messages
524
I wonder when NWSparks aka Phil Wieland will update his map on his website and show Preston to Blackpool as green?
Perhaps when the ORR issues a certificate that allows for electric passenger trains to run? We are assured, though, that this will be THIS WEEK provided nothing showed up to prevent such on last night's runs.
 

John Boy

Member
Joined
23 Jan 2016
Messages
22
Two bases have been installed at Salford crescent.
 

Attachments

  • IMG_1768.JPG
    IMG_1768.JPG
    2.6 MB · Views: 60
  • IMG_1769.JPG
    IMG_1769.JPG
    2.7 MB · Views: 53

Foggycorner

Member
Joined
16 Nov 2016
Messages
202
Location
bolton
there is also a third steel tube at the Bolton end of the platform in the trees that looks like is unfinished due to 1 ran out of time or 2 hit an problem (buried wall or other part of the building that used to be there)
 

nodrogchannel

Member
Joined
5 Nov 2017
Messages
7
Location
Blackpool
NODROG has kindly agreed to allow me to create a link between his YouTube Channel and the Combined Volume (CV), which I have now done.

To access it and the other flickr albums which are linked to the CV please go into the CV (below) and click on the very first image, look down the screen to the Comments, all of which contain links to people's work. NODROG's, being the latest, is the last one. The CV is here:

https://www.flickr.com/photos/127646831@N03/albums/72157661069863633

Thank you NODROG. Any further material you add to your channel will automatically be added to the link, needing no extra effort on your part or mine.
Your most welcome.
 

nodrogchannel

Member
Joined
5 Nov 2017
Messages
7
Location
Blackpool
NODROG has kindly agreed to allow me to create a link between his YouTube Channel and the Combined Volume (CV), which I have now done.

To access it and the other flickr albums which are linked to the CV please go into the CV (below) and click on the very first image, look down the screen to the Comments, all of which contain links to people's work. NODROG's, being the latest, is the last one. The CV is here:

https://www.flickr.com/photos/127646831@N03/albums/72157661069863633

Thank you NODROG. Any further material you add to your channel will automatically be added to the link, needing no extra effort on your part or mine.
Great photos! I see I'm on a few! (May I use them for personal use?) Many thanks.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,897
Location
Mold, Clwyd
Is the testing limited to one unit?
Can they get all useful data from that?
As 2 units under power would be more realistic surely?

The first section of NW wiring (Castlefield-Golborne Jn) was tested with 2x390s, pulling away from Eccles in opposite directions.
I think that was the second test, the first one being a single 390.
One difference is that Preston-Blackpool North is not ATF fitted.
 

The_Engineer

Member
Joined
24 Mar 2018
Messages
524
Is the testing limited to one unit?
Can they get all useful data from that?
As 2 units under power would be more realistic surely?
The testing done with the Class 390 is what is usually done by the MENTOR test car - which is looking at pantograph interface with the wire. Power draw is not tested by MENTOR as it is a passive vehicle, rather it measures supply characteristics and pantograph upforce (conductor wire forces).
 

kaiser62

Member
Joined
10 Sep 2011
Messages
44
Location
Suffolk
The testing done with the Class 390 is what is usually done by the MENTOR test car - which is looking at pantograph interface with the wire. Power draw is not tested by MENTOR as it is a passive vehicle, rather it measures supply characteristics and pantograph upforce (conductor wire forces).
What happened to the old mobile load bank....was a redundant 83 I think? Is it no longer deemed necessary to test in that manner. Seemed to make sense as Mentor is passive as you mention.
 

The_Engineer

Member
Joined
24 Mar 2018
Messages
524
What happened to the old mobile load bank....was a redundant 83 I think?
Yes, it was Class 84 (84.009 - ADB968021) and was a static load bank which could be hauled along an electrified line to give a load to the overhead.

Later, many load tests were done using two Class 90s, one motoring and the other in dynamic brake.

Latterly there were a pair of Class 86s (86.901 and 86.902) that did this function, their redesign (2004) was done by a good friend and colleague of mine! The 86s could move under their own power. These were withdrawn in 2016 I think...

If you're interested see http://www.traintesting.com/Loadbank.htm
 