Any chance of a service onto Nuneaton in the future? Or does that involve crossing lines slowing up faster services?
I haven't got the facility to search for the post currently but I'm sure not too long ago it was stated that someone had managed to work out a potential path, at the expense of a freight path, to which The Planner said he was aware of the person who came up with the idea, so it might be possible. (Apologies if I've remembered this wrong)It’s usually been explained as too difficult to path across Coventry, but it’s been reported in another forum that the local authority reckon such a service can operate from Dec 2019.
However our resident expert, The Planner, has often said here it is impossible.
Nope, you are right, I still am a bit dubious of it as I think it could well be a bit of a performance nightmare but I have been wrong plenty of times before!
I’m with you on that. Can see the Leamington - Nuneaton held outside Coventry at either end because of a late running express.
Much better to keep them as shuttles and have good connection times at Coventry.
How have the shuttles beem affecting the performance of the XC service - particularly going northwards, when the dogbox has to do a quick shufty out of the way to clear platform 4 at Cov?
That announcement certainly doesn’t help - there is at least one a day booked to depart from platform 2. Also, they don’t all leave ‘on the hour’ - some are a bit off time.
Main issue with delays so far bizarrely enough has been XC’s knock ons by the looks of it. The dog box (touch wood) has performed very well and long may it continue.

Believe me people were warned over it but sometimes the bigger picture gets involved...
Also, what is better, having a service which may be late by a minute or two late several times a day (or longer some other times) or no service, especially if the problems causing the issues are likely to be fixed in due course?
There were ten instances yesterday of late starts from Leamington per RTT (some only a minute) - all apparently caused by the Newcastle-Reading XC arriving late into platform 3. The latter service is notoriously unreliable from NS at xx33. As getting to Coventry with the new service and shunting promptly is key to avoiding further delays at Coventry, it seems the arrangements at Leamington are far from ideal. You wonder why Network Rail has agreed to anything that is bound to further disrupt the Coventry corridor.
A quick question here.
Are there any plans to make Kenilworth station a passing loop at some point in the future?
I saw what appeared to be space for another platform and track on the Leamington side.
So if WMT have for instance bid Mon-Sat paths xx-02 Leamington arrive Nuneaton xx-38 returning NN xx-16 arr Leam xx-53 based on two car 172s and a split service on Sun what would the problem be?
It is the reason it doesn't run Sunday.
That was fixed as part of the station works, there used to be an overlap that overlapped an overlap.ISTR passenger trains can't be timed to cross in Kenilworth loop due to some signalling issue?