transmanche
Established Member
- Joined
- 27 Feb 2011
- Messages
- 6,021
Only about 45 minutes, IIRC.Merseyrail to Chester as another example of a longish one? (And Merseyrail has toilets in the main stations but not all of the local ones, though some do).
Only about 45 minutes, IIRC.Merseyrail to Chester as another example of a longish one? (And Merseyrail has toilets in the main stations but not all of the local ones, though some do).
Only about 45 minutes, IIRC.
Remind me how long he has been working in the rail industry for? Describing him as a "rail heavyweight" surely implies he started his long and distinguished rail career under BR?
What's even more frightening is the fact when Skates made that comment he was being serious.
Surely it's the time taken for the average journey, rather than the distance, that's the issue?
Although it's unlikely that many people make end-to-end journeys on these services.
- A 313 takes about 75 minutes for a Moorgate-Letchworth journey (about 36 miles), without any on-board toilets.
- A 455 takes about 70 minutes for a Waterloo-Guildford journey (about 31 miles), without any on-board toilets.
- A 378 takes about 60 minutes for a Richmond-Stratford journey (about 17 miles), without any on-board toilets.
- I understand that 313s can also be used on Brighton-Portsmouth journeys (about 45 miles) taking over 80 minutes.
However, on light rail, a T&W Metro train takes about 65 minutes for a Newcastle Airport-South Hylton journey (about 23 miles), without any on-board toilets.
What will be the (estimated) journey times for the South Wales Metro?
Surely it's the time taken for the average journey, rather than the distance, that's the issue?
Although it's unlikely that many people make end-to-end journeys on these services.
- A 313 takes about 75 minutes for a Moorgate-Letchworth journey (about 36 miles), without any on-board toilets.
- A 455 takes about 70 minutes for a Waterloo-Guildford journey (about 31 miles), without any on-board toilets.
- A 378 takes about 60 minutes for a Richmond-Stratford journey (about 17 miles), without any on-board toilets.
- I understand that 313s can also be used on Brighton-Portsmouth journeys (about 45 miles) taking over 80 minutes.
However, on light rail, a T&W Metro train takes about 65 minutes for a Newcastle Airport-South Hylton journey (about 23 miles), without any on-board toilets.
What will be the (estimated) journey times for the South Wales Metro?
With the exception of Portsmouth - Brighton, the numbers travelling the entire length of those journeys would be negligible - that's not what they're for. It's mostly local commuter traffic, on for much shorter journeys. There are alternatives available that are quicker and/or carry suitable facilities. People coming down from the Heads of the Valleys won't have any alternatives - the numbers suffering with crossed legs will be much higher - and given that most of the intermediate stations up there are unstaffed halts with little more then a bus shelter for comfort, rather then the busy staffed stations of the southeast, it really is much more likely to be a problem.
With the exception of Portsmouth - Brighton, the numbers travelling the entire length of those journeys would be negligible - that's not what they're for. It's mostly local commuter traffic, on for much shorter journeys. There are alternatives available that are quicker and/or carry suitable facilities. People coming down from the Heads of the Valleys won't have any alternatives - the numbers suffering with crossed legs will be much higher - and given that most of the intermediate stations up there are unstaffed halts with little more then a bus shelter for comfort, rather then the busy staffed stations of the southeast, it really is much more likely to be a problem.
Surely it's the time taken for the average journey, rather than the distance, that's the issue?
Although it's unlikely that many people make end-to-end journeys on these services.
- A 313 takes about 75 minutes for a Moorgate-Letchworth journey (about 36 miles), without any on-board toilets.
- A 455 takes about 70 minutes for a Waterloo-Guildford journey (about 31 miles), without any on-board toilets.
- A 378 takes about 60 minutes for a Richmond-Stratford journey (about 17 miles), without any on-board toilets.
- I understand that 313s can also be used on Brighton-Portsmouth journeys (about 45 miles) taking over 80 minutes.
It is reasonable to expect people to make some effort to avoid being embarrassed by calls of nature. Stations like Richmond and Waterloo have public lavatories which can be used before people begin their journey. If passengers are taken by surprise mid-journey, in some cases it is possible to avoid a crisis by getting off the train. For example, Finsbury Park has platform lavatories for Moorgate to Letchworth passengers. Willesden Junction and Gospel Oak have platform lavatories for the Richmond to Stratford journey.
Passengers travelling some distance through stations with no facilities need on-train provision.
Are those of us with weak bladders now supposed to develop an encyclopaedic knowledge of railway lavatories and their opening times? What happens if a train is stuck between stations or at one without facilities for an extended period?
It's a significant issue for some of us.
Professor Barry appears to be an academic with a particular bee in his bonnet (and yes, some coloured crayons!). I think he should be described as lightweight, however, given his preference for light rail...Well congratulation to Professor Berry on being awarded a large crayon set however why would you want to appoint a "rail heavyweight" to do a strategic review when your days away (allegedly) from awarding the "world class" "transformational" South Wales Metro and Wales and Border franchise contract?
Are they admitting that the greatest things since sliced bread is in fact not and more work and development is needed?
Professor Barry appears to be an academic with a particular bee in his bonnet (and yes, some coloured crayons!). I think he should be described as lightweight, however, given his preference for light rail...
“We saw in the public inquiry this genuine belief that if you build another road, that will solve the problem. And we feel, and the evidence from our witnesses in the inquiry was, it will just fill up again.”
A final decision on the M4 relief road should be taken by Carwyn Jones's successor, the assembly's environment committee chairman has said.
As an occasional user (but supporter) of the HoW it's disappointing but perhaps not surprising that weekday numbers are down since the 2015 timetable. Have the extra early-morning trains picked up any additional business since their introduction? I think there were issues with the changed morning arrival time at Shrewsbury not suiting school and college students, as well as the late-morning trains crossing point being changed from Llanwrtyd to Llan'dod meaning that shopping trips to Llan'dod from the north no longer worked.It does help that the timings on the HOW on a Sunday are when people want to travel. Passenger numbers on that line are down Monday - Friday since the new timetable, despite most of the line going from 4 trains a day to 5, because the new timings don't match up with travel patterns. This is no fault of ATW, the limits of infrastructure and rolling stock availability meant that it was the only way to satisfy the demands from Cardiff Bay for more services. Looking at the figures on the HOW, you might assume the line has no future with passenger numbers going down when in reality it's the timetable holding things back.
As an occasional user (but supporter) of the HoW it's disappointing but perhaps not surprising that weekday numbers are down since the 2015 timetable. Have the extra early-morning trains picked up any additional business since their introduction? I think there were issues with the changed morning arrival time at Shrewsbury not suiting school and college students, as well as the late-morning trains crossing point being changed from Llanwrtyd to Llan'dod meaning that shopping trips to Llan'dod from the north no longer worked.
Have the Saturday loadings held up? By the look of it the current Saturday timetable is similar to the pre-2014 weekday version.
As you say, the lesson should be that additional trains aren't always an improvement if they adversely affect existing passengers.
The Cambrian extras were extra new services on top of existing trains= big success. HOW they had to jig diagrams around and destroy existing flows= failure
As an occasional user (but supporter) of the HoW it's disappointing but perhaps not surprising that weekday numbers are down since the 2015 timetable. Have the extra early-morning trains picked up any additional business since their introduction? I think there were issues with the changed morning arrival time at Shrewsbury not suiting school and college students, as well as the late-morning trains crossing point being changed from Llanwrtyd to Llan'dod meaning that shopping trips to Llan'dod from the north no longer worked.
Have the Saturday loadings held up? By the look of it the current Saturday timetable is similar to the pre-2014 weekday version.
As you say, the lesson should be that additional trains aren't always an improvement if they adversely affect existing passengers.
Alas, that is indeed exactly what happened. Both lines were crying out for extra services, but only one has been a success.
Saturday's are doing well - a lot of the old Llandrindod shopping crowd for example are stil traveling on that day since it's the only day that works. Saturday is often busy down there anyway with all the walkers and shoppers and so on. For the rest of the week I'd like to say things are slowly getting busier on the extra services, but it's really hard to judge, especially as all the free concession tickets in winter affect the loads an awful lot.
Full and standing on that line is not unheard of - but sadly neither is single digital passenger loads.
The HOWL is difficult to path due to a variety of constraints:
1) Pathing constraints on the mainline between Swansea & Llanelli
2) Pathing constrains on the mainline between Craven Arms & Shrewsbury
3) Location of passing loops on the HOWL
4) Desire to merge HOWL with Shrewsbury-Crewe services
Getting all of these to work together effectively is next to near impossible. Hence the long wait times at passing locations in the weekday timetable.
The opportunity of a day trip to Llandrindod Wells during the week from the north was lost due to retiming of existing services to accomodate the additional ones which were an initiative from the Welsh Government and which fouled up many travel plans.
Typical Welsh Government. The students travelling to Shrewsbury in the morning lost their suitable service and have to travel half and hour earlier but as they are mostly from Church Stretton and Craven Arms were not involved in the consultation process as these stations are in England.
Can someone please explain this comment to me: Asked about the timescale, transport secretary Ken Skates said: “I can’t answer this because, if I do, it will reveal the technical solution that’s going to be utilised on that particular line.”
What on earth does he mean by 'technical solution'? Is he trying to get trams up to Ebbw Vale as well? Let's just turn the whole of South Wales into a tramway!
Well with the new franchise commencing in just 5 months isn't it about time Skates got on and did just that? They've only been going through the process of awarding this franchise for the last 4 years!I am guessing that the bids from the two bidders are technically different and each has a unique timescale so providing an answer would effectively announce the winning bidder.