Most likely, but it depends on how long it takes for the useable parts to be stripped.
Don't forget that the 800s get introduced on the East Coast later this year...

So it might be with as a wee while yet. Is there is set date for the 800 introduction on the ECML?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,310
Location
Glasgow
Three HST powercars have already been scrapped - 43011 (Ladbroke Grove accident) 43019 (Ufton Nervet collision) and 43173 (Southall accident). As well as those one of the prototype powercars, 41002, was scrapped in 1990 after beind withdrawn from Departmental stock.

I meant the first one due to, essentially - age and being surplus to requirements as opposed to accident damage.
 

mde

Member
Joined
17 Nov 2016
Messages
513
I'm sorry loving HST's and all that but 43195 wont happen its been condemned as spares. 43138 has a more likely chance of revival.
Indeed - and I would never have hinted at the chance. What I did allude (and wibble to) was would 43138 face the same fate as 43195. :)
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,310
Location
Glasgow
Told that tonight in a public consultation with Alex Hynes. Glossed over it rather quickly.

Hardly surprising, it's been delayed that much I've forgotten the original service enary date. Was it actually the May timetable change or earlier?
 

JohnR

Member
Joined
23 Jul 2010
Messages
495
Hardly surprising, it's been delayed that much I've forgotten the original service enary date. Was it actually the May timetable change or earlier?

I seem to recall from the time of the franchise bid being announced that May 2018 was the date for full squadron service on all routes. Which even if GML electrification hadnt been delayed, always seemed ambitious to me. This had gradually slipped and slipped - not always through the fault of ScotRail I should hasten to add.

However, the problem is over-promising and under-delivering.
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
I don't think that in this case it's anything to do with Scotrail. A major underestimate by Wabtec of how long it would take to refurbish the coaches.
 

mic505

Member
Joined
26 Nov 2016
Messages
192
Same old, same old Wabtec. Just like the Class 458/460 conversion lol.
 
Last edited:

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,310
Location
Glasgow
I seem to recall from the time of the franchise bid being announced that May 2018 was the date for full squadron service on all routes. Which even if GML electrification hadnt been delayed, always seemed ambitious to me. This had gradually slipped and slipped - not always through the fault of ScotRail I should hasten to add.

However, the problem is over-promising and under-delivering.

So it was May, it seems to have been delayed so often, I couldn't remember!

No, I daresay the blame isn't entirely with ScotRail.

Oh well, it's HSTs, to me it'll still be worth the wait! :lol:
 

nat67

Established Member
Joined
23 Apr 2014
Messages
1,477
Location
Warwickshire
Indeed - and I would never have hinted at the chance. What I did allude (and wibble to) was would 43138 face the same fate as 43195. :)
I wouldn't think so as it was supposed to be having a home unlike 195 which wasn't and I would guess the leasing company would want it back.
 

nat67

Established Member
Joined
23 Apr 2014
Messages
1,477
Location
Warwickshire
Will that be the first one scrapped then?
I would guess GWR will strip it down for parts and then like with the West Coast Brush up at Carnforth it will go the same way, maybe 125 group may salvage it if there is enough left of it.
 

The_Engineer

Member
Joined
24 Mar 2018
Messages
524
I wouldn't think so as it was supposed to be having a home unlike 195 which wasn't and I would guess the leasing company would want it back.
Yes. the point has already been made and stressed that 43138 is leased, and when returned off-lease it needs to be returned in a fully serviceable condition by the operator. There's usually a "catastrophe" clause in a lease which allows for a major damage possibility, where the insurers of the leased vehicle can write-off the vehicle if it is deemed "beyond economic repair" and the leasing company gets the insured value payment.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,310
Location
Glasgow
I would guess GWR will strip it down for parts and then like with the West Coast Brush up at Carnforth it will go the same way, maybe 125 group may salvage it if there is enough left of it.

I think they might prefer an intact power car, even if they want to fit Valentas.
 

gordonjahn

Member
Joined
23 Oct 2010
Messages
146
Sorry if I missed this - will/are the SR power cars be the same as the GWR HSTGTi ones with notch 5 locked out? Just curious.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,685
Location
Scotland
Sorry if I missed this - will/are the SR power cars be the same as the GWR HSTGTi ones with notch 5 locked out? Just curious.
I don't know but it's a good question - I can't see why they would need it but it would be nice to have.
 

47802

Established Member
Joined
6 Mar 2010
Messages
3,454
So it was May, it seems to have been delayed so often, I couldn't remember!

No, I daresay the blame isn't entirely with ScotRail.

Oh well, it's HSTs, to me it'll still be worth the wait! :lol:

Well I think you could strongly argue that whoever placed the contract with Wabtec is to blame or if you do place a contract with Wabtec make sure you allow for adding at least 2 years to the time they actually state.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,310
Location
Glasgow
Well I think you could strongly argue that whoever placed the contract with Wabtec is to blame or if you do place a contract with Wabtec make sure you add at least 2 years to the time they actually state.

Well I'll agree Wabtec don't seem to be keeping to schedule very well, but they're not 2 years behind or does that refer to another refurbishment project?
 

47802

Established Member
Joined
6 Mar 2010
Messages
3,454
Well I'll agree Wabtec don't seem to be keeping to schedule very well, but they're not 2 years behind or does that refer to another refurbishment project?

We shall see, but I would tempted to money on the current order book of all Scotrail, XC and GWR Sets not being completed by the end of 2019.
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
You'd be hard pressed to justify a 2 year delay to Wabtec's estimated schedule. You would hope that they would update their own estimating processes following large delays, and then you might put up to 6 months on top of their worst case just for peace of mind, but if you are doubting them so much that you put a 2 year buffer on it, it'd be difficult to justify
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,310
Location
Glasgow
We shall see, but I would tempted to money on the current order book of all Scotrail, XC and GWR Sets not being completed by the end of 2019.

I think the ScotRail ones will be done by then personally and the GWR ones. I can see the XC ones being at the tail end of all that.
 

Stopper

Member
Joined
11 Nov 2017
Messages
670
Well I think you could strongly argue that whoever placed the contract with Wabtec is to blame or if you do place a contract with Wabtec make sure you allow for adding at least 2 years to the time they actually state.

I fully agree with this. Like the Hitachi 385 failure, I fail to see how anyone can say the supplier is 100% to blame. There are multiple parties involved in the wrong.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,833
You'd be hard pressed to justify a 2 year delay to Wabtec's estimated schedule. You would hope that they would update their own estimating processes following large delays, and then you might put up to 6 months on top of their worst case just for peace of mind, but if you are doubting them so much that you put a 2 year buffer on it, it'd be difficult to justify
Well, the 458/5 conversion project saw the final set delivered 91 weeks late, which is not far off 2 years delay.
 