anthony263
Established Member
It seems that Network rail are to replace and extend some of the passing loops on the heart of wales line from October.
http://news.bbc.co.uk/1/hi/wales/mid/8190197.stm
Hopefully this & the redoubling of the single line through Gowerton should allow services along the Haert of wales line to be increased to every 2 hours & extended to Crewe which will be good as even though it is a very rural line trains are often overcrowded.
http://news.bbc.co.uk/1/hi/wales/mid/8190197.stm
Hopefully this & the redoubling of the single line through Gowerton should allow services along the Haert of wales line to be increased to every 2 hours & extended to Crewe which will be good as even though it is a very rural line trains are often overcrowded.