Altnabreac
Established Member
Is there already a southbound platform (albeit disused) next to the level crossing at Newtonmore?
Its somewhere on the continuum between disused, derelict and disappearing. Suspect it would need a total rebuild.
Is there already a southbound platform (albeit disused) next to the level crossing at Newtonmore?
I’d also like to see Tomatin station reopen in the not too distant future.
Is it (with total blockade) amenable to a Farnworth Tunnel type approach i.e fill up with structural foam/etc and then rebore with concrete segments and clear to a larger gauge etc?Killicrankie tunnel is a substantial barrier to speedy journeys & capacity, because it is single track, it has a 30 mph speed limit & it has restricted gauge. However it is also short. Tunnels of its length are being built every day around the world. It would be easy to drive a second tunnel on the land side of the river. If we were not in the hands of Network Rail it could be done cheaply & speedily too.
Killicrankie tunnel is a substantial barrier to speedy journeys & capacity, because it is single track, it has a 30 mph speed limit & it has restricted gauge. However it is also short. Tunnels of its length are being built every day around the world. It would be easy to drive a second tunnel on the land side of the river. If we were not in the hands of Network Rail it could be done cheaply & speedily too.
Killiecrankie. Nobody has quite nailed the spelling yet, nor, unless I have missed it, mentioned the viaduct.
The realist in me tells me that not even any of the above is likely to happen in the next ten years. All we're getting is resignalling to allow increased speed of approach of HSTs at Pitlochry and Aviemore. Dunkeld station might get moved, but far more important is to get its useless platforms raised to an acceptable height.

Reinstatement of double track from Culloden to Daviot.
Fair enough, but we all know that timetable modelling and single track reality are very different things on the Highland Main Line.As I understand it, this was actually on the cards until timetable modelling showed that it would be of little use, as two trains were unlikely to pass on that section.
My suggestions for double tracking and loops are based on a combination of affordability, strategic location within single sections, and that land should be available within the existing railway boundary.
Sorting out Ladybank to Hilton also helps Edinburgh to Perth services so would hopefully have a strong business case.If it was up to me as a resident of Speyside, and a pessimist in the light of the limited resources likely to be available, in the order of priority:
1. Sort out Ladybank-Hilton before worrying about the HML itself. The inefficiency of this section affects substantially more people than anything north of Perth but is relevant to woeful journey times between Edinburgh and the highlands.
2. Reinstatement of loops at Ballinluig, Killiecrankie and Etteridge.
3. Reinstatement of double track from Culloden to Daviot.
The realist in me tells me that not even any of the above is likely to happen in the next ten years. All we're getting is resignalling to allow increased speed of approach of HSTs at Pitlochry and Aviemore. Dunkeld station might get moved, but far more important is to get its useless platforms raised to an acceptable height.
Reengineering Killiecrankie viaduct and tunnel would shave two or three minutes maybe but I suspect that there are many more slow spots that could be tackled more cheaply than this one.
Tomatin station? That's a bit left field isn't it? The place makes Dalwhinnie look like a major centre of population, and Dalwhinnie is at least at a junction of two roads. What's the thinking behind this? I'd sooner have Newburgh on the Ladybank line as part of my top priority above.
Sorting out Ladybank to Hilton also helps Edinburgh to Perth services so would hopefully have a strong business case.
All or any of those things. Please God no longer that we have over 15 miles of uninterrupted single track. It must be close to being the worst piece of infrastructure capacity versus passenger demand in the UK.Does sorting out mean doubling and increasing linespeed where possible or something else? Just wondering![]()
All or any of those things. Please God no longer that we have over 15 miles of uninterrupted single track. It must be close to being the worst piece of infrastructure capacity versus passenger demand in the UK.
So bad is it I've decided to start a new thread on the subject!It's also pretty slow too if I recall rightly. I think it's also more readily suited to doubling. It might even be the more worthwhile course of action than doing anything on the HML, at least for the time being.
So bad is it I've decided to start a new thread on the subject!
Thanks for the info. I for one am glad Dunblane and Bridge of Allan have been removed from the stops as it just added to the time and no one ever gets off there.
The kind of services that probably should stop at GatewayLooks like Gleneagles has been removed too which is a bonus.
On the Edinburgh side it looks as if Kirkcaldy will become a regular call again, but no calls at Edinburgh Gateway, Inverkeithing, Markinch and Ladybank.
if the trains don't stop then you'll never be able to prove if the demand exists.