Hi, everyone
I am confused that the length of the platform is necessary to design to cover the whole length of the train (locomotive+carriage) or just cover only the carriage? for example, if the station was built to accommodate 12 car train formation, the operated train is 2 electric locomotive with 8 carriages. I not sure that what is the maximum for additional carriages for these operated train whether 2 carriage or 4 carriage?
I am confused that the length of the platform is necessary to design to cover the whole length of the train (locomotive+carriage) or just cover only the carriage? for example, if the station was built to accommodate 12 car train formation, the operated train is 2 electric locomotive with 8 carriages. I not sure that what is the maximum for additional carriages for these operated train whether 2 carriage or 4 carriage?