squizzler
Established Member
I am a frequent traveller through Worcester and the station situation there strikes me as quite messy because the small cramped Foregate Street station is in the city centre where users of the city want to be. And there is the spacious Shrub Hill station half a mile away where, I imagine, the rail operators would rather be.
This proposal is for Foregate street to close and some form of people mover system installed between the city centre and Shrub Hill. This might take the form of a people mover alongside the rail alignment to the Foregate Street site or (and this is my suggestion) an aerial ropeway to a different central location. All rail traffic will then use Shrub Hill station allowing for an integrated city centre interchange. Here are some current operational disadvantages I think my proposal would solve:
I personally would be inconvenienced by my own proposal because I often go from Hereford to Droitwich and my proposal would result in a slower journey due to change of direction at Shrub Hill. However I hope this would be outweighed by the advantages of a single spacious hub in Worcester. The Hereford services, for instance, could use this reversal to split or rejoin at Shrub Hill, providing additional capacity for their more popular New Street (rather than Snow Hill) route
Removing the bottleneck at Foregate Street might have the further benefit of allow a new station for local services to open on the West side of the river. This in turn would help redress the cities notorious cross town traffic.
What do others think? I would be surprised if no such thing had previously been proposed, but could not find it before writing this post.
EDIT: Attached map of my cablecar route
This proposal is for Foregate street to close and some form of people mover system installed between the city centre and Shrub Hill. This might take the form of a people mover alongside the rail alignment to the Foregate Street site or (and this is my suggestion) an aerial ropeway to a different central location. All rail traffic will then use Shrub Hill station allowing for an integrated city centre interchange. Here are some current operational disadvantages I think my proposal would solve:
- The expense of running two stations
- Cotswold - Malvern services having to stop twice in central Worcester
- Most passengers go to Foregate Street for convenience so services from there would get crowded. So the Snow Hill route services to/from Shrub hill now have to call there to balance the loadings. This means your frequent Worcester-Birmingham service is now reversing in that two platform station.
- The above means that the mouth of the Worcester-Hereford line is now getting gummed up with services to/from Shrub Hill and this must eventually reduce the potential to increase services through the Malverns.
I personally would be inconvenienced by my own proposal because I often go from Hereford to Droitwich and my proposal would result in a slower journey due to change of direction at Shrub Hill. However I hope this would be outweighed by the advantages of a single spacious hub in Worcester. The Hereford services, for instance, could use this reversal to split or rejoin at Shrub Hill, providing additional capacity for their more popular New Street (rather than Snow Hill) route
Removing the bottleneck at Foregate Street might have the further benefit of allow a new station for local services to open on the West side of the river. This in turn would help redress the cities notorious cross town traffic.
What do others think? I would be surprised if no such thing had previously been proposed, but could not find it before writing this post.
EDIT: Attached map of my cablecar route
Attachments
Last edited:
Worcester has problems with its rail geography both in terms of the wider network (the main cross country line between Birmingham and Bristol misses the city) and compounds this within the city with reverse branching of traffic from the north and splitting traffic between the two stations. There are several operational disadvantages I think my proposal would solve: