The only infrastructure the Operator & Development Partner will be allowed to work on is the Core Valley lines, IF (and it's still an if) NR and DfT agree to transfer the Core VL to Welsh Govt, as surprisingly that still hasn't officially happened. Any other enhancements will be up to Network Rail and the DfT, because as has been said, almost the entire budget for VL electrification will be swallowed up by the Core VL project.
If there is a clear case for putting up 750V DC on the other lines, it will happen. NR themselves don't have to do the work as part of their normal investment period work. As ever, the funding would come from future operational savings.
So if it's confirmed unequivocally that the plans are for a network split, with everything from the Valleys, the Vale, Barry, Penarth & the City line terminating in or around Central station, what would you say to that?
Because whilst I have no inside info, I have read what must be every single news article on the Metro/Valley lines over the past few years, and I can absolutely say from reading everything there is to read on the subject, that TfW want a network split to hive off the Core VL from everything else, no matter what the effect on operational costs or flexibility at Cardiff Central.
If it's confirmed that there would be a full split, I would initially be curious about how they justified it. Despite what you think, it's really rather hard for civil servants to come out with utterly daft transport schemes for implementation just because of some political beliefs. Sure, plenty of other policies can be crap but these are largely human-based ones like welfare or education, where it's much more subjective and woolly whether something will work or not. Infrastructure doesn't work that way - if the metal and concrete doesn't exist for the thing the politicians say they want, then no amount of political thinking is going to change that. If they do manage to come out with a technically impossible or blatantly inefficient scheme then I will not support it.
I don't see why a totally hived-off network would be better for Labour anyway. They can have the same control over infrastructure and investment on the 'core Valley lines' if they have through running. The network with through running onto NR rails would be larger, more prominent and more revolutionary, all the sorts of things a politician would want as their legacy. Taking over the passenger services running onto NR rails doesn't have to stop any other ideas for the Metro. If anything, it makes it easier, since it provides an easier path for service improvements elsewhere on the network. The less subsidy the SWM needs, the more funding will be available for other rail and general government investments around Wales.