So basically you are suggesting 50m trams that could run on streets as single units but not as double units and that would basically be high floor versions of 399s to allow limited running on heavy rail tracks in the future e.g. to Penarth or Barry? That could work but the benefits of street running in Cardiff are so small it would make more sense to just go for trains like T&W or even just get a follow on order of their new stock.
But my point is that the T&W trains, current and future, are essentially high-floor trams. The only meaningful change is that they run at 1500V DC (too high for shared running) and they don't have the pedestrian protection.
Because when CASR was agreed in 2011, the plans were very much for the Valleys to stay as a HR system. WG didn't start dithering until around 2014, when it started rowing with Westminster over who was going to pay & how much for VL electrification. Then along came the vague Metro / light rail proposals. Then the competitive dialogue idea in 2015. By which time it was too late to stop / change CASR.
I think the LR proposals came about as a direct consequence of HR electrification costs increasing. Back in 2011 the idea was that the Valleys could be easily wired up once the GWML job arrived in Swansea and the 315s would be available at a pittance once the 345s took over the Shenfield job. Since the assumptions haven't panned out, the plan has had to change.
If you google 'CASR January 2017' you'll see a picture of Ken Skates with Mark Carne on the NR website at the opening of P8 last January, all smiles, taking credit for an infrastructure enhancement project that he never intends to use and wants to rip out. Along with demolishing the brand new rear entrance of Central station.
Again, an obsession with LR conversion meaning 'ripping out' all that CASR work. What do you think they would be doing? Removing all the track and starting again?
The proposed, outline planning permission depot design confirms absolutely nothing. (Please tell me you know the difference between applying for outline and full planning permission) The demolition and re-build of Taffs Well platform confirms nothing.
What is widely known, which you and the other LR enthusiasts consistently ignore, is the split of the network. So I'll say it again.
Welsh Govt want everything north of Queen St for a tram network. Not a tram-train network.
I do know there are different sorts of planning permission. What I can tell you is that depots have to be designed around the sort of rolling stock that will be used. The plans they've submitted are entirely 100% based around 50m long LR stock. Any change would necessitate almost complete redesign of the depot, since it's all on a very constrained site. There's little point applying for outline planning approval if there's a chance the whole thing would need to be redone, or even moved entirely.
Again, you're saying that any
infrastructure split must necessarily result in an
operational split. Sure, the Welsh Government want control of the infrastructure north of Queen Street. Does that preclude the idea of through running onto NR tracks? No.
If the Welsh Government were planning to split the network operationally, they would have little reason not to go about the W&B franchise in an entirely normal way. If an operational split were guaranteed, they would be able to guarantee bidders for W&B that they would need to run the services to Penarth and Barry and Radyr. Why haven't they done this? Is it all a massive secret conspiracy?
Network Rail are keeping everything else for a no enhancements planned, HR network. I posted NR's strategic plan for CP6 here a few pages back. No enhancements anywhere in Wales in CP6 are planned.
I'm tearing my hair out when reading the LR enthusiasts posts now. NO enhancements for the VoG line to Barry and nothing for Penarth in phase 2 are included. It's DMUs for the foreseeable future. There will be no futuristic, fantasy cross-city tram-train running. No wires of any sort are going up beyond Central out to the west.
Ah yes, I understand. The Welsh Government are going to go about their procurement process in absolute secrecy but then NR will spill all the beans in their reports. This is a nonsense. From my reading of these documents, NR (or the people responsible for this document) know little more than we do. Therefore, it is entirely reasonable for them to act on the assumption that only things that have been guaranteed to happen will occur. Until then, anything else would be speculative. NR isn't going to start talking about having 750V DC strung up to Penarth, Barry Island and Radyr until such a thing is officially confirmed. This really isn't that strange.
Please can our resident LR heads explain to me how on earth you terminate at least 24 trams per hour in Queen St? How you increase frequency out to the VoG and City line terminating it all at Central? How you justify effectively mothballing the recently re-signalled and upgraded Queen St - Central HR link and making people walk between the two stations?
Because you don't. You keep the connection and LR trains continue running to Central, and onto the other parts of the Cardiff rail network.
You know, if all the truth comes out and you were right all along, you can rub it in my face all you like. I'm not defending the system you're criticising. I'm saying the likelihood that this outcome would happen is rather smaller than you seem to think.
Retained or extended? Which is it? If something is being retained, it probably costs less than demolishing it, so I suspect that would be your answer, thought in your world view I suppose spare platforms ahould be dismantled to save the colossal costs of maintaining them.
If you look at the plans, you'll see that the northbound platform is being half rebuilt. Right now the platforms at Taffs Well are staggered but they'll end up totally aligned. The bit of the northbound platform that is already aligned is long enough for a 50m train. A totally new 50m section will be built to the north to keep the length when the southernmost 50m is demolished. That's what I mean by 'retention' - I simply assumed you had looked at the documents and understood what I was on about. Clearly there's little point demolishing excess platform length if trains do get shorter.
The best indication we have so far is a mao showing phase 2. The 'Core' lines remain as per phase 1. The other lines, the ones which currently see the cross-Cardiff services which peopleactually use, see only some unspecified form of enhancement. None of the extensions whoch you seem to think will flow from lightrailification are visible.
In my view, this is simply because they can't yet commit to those changes happening. They're working - in secret - with the SWM and W&B franchise bidders to get them worked out. They've produced maps to the effect of the minimum case, not the maximum. It looks like they're depending on the bidders to suggest tram-train technology and through running rather than mandating it themselves.
I know you don't like engaging with evidence which contradicts your obsessive dedication to LR, but try occasionally, it might make the discussion more interesting.
I don't have an obsessive dedication to LR. I can simply see that in cases like this it presents lots of exciting opportunities. There are plenty of places where LR isn't the answer.
Now you're just being silly. How about joining and dividing 3 or 4 car EMUs as necessary, in accordance with current and future Merseyrail practice? There aren't 10 services an hour on the Metrolink branches at 9 pm on a Saturday, so why would there be on an HR line?
Does Merseyrail magically provide enough capacity all the time? No. HR networks do not find it easier to provide capacity at the moments it's required, because the realistic capacity is set by everyday levels of demand and provision. LR makes it a lot easier to have a high capability even at times of low demand.
8 minutes. In the open air. On 1 of 3 seats at the stop. Luckily a. It wasn't raining, for once in Manchester b. the half dozen other people waiting for the same length of time allowed me to sit (probably a by-product of how old I am starting to look). I boarded the tram at Victoria, and followed the journey planner's advice to change at Trafford Bar. I wasn't hanging around a glorified bus stop, without even a shelter, for the good of my health.
Now I am a captive customer, because I can't drive. If I did, I would have driven from Liverpool to Altrincham rather than pay good money to take 45 mnutes, including change and sitting on that platform, to travel avout 8 miles after leaving the EMU which had carried me over 30 miles in the same time.
This is what you don't seem to get. If public transport is provided at the lowest possible standard, people (outside the London commuter peaks) will vote with their feet and use private transport. This is what existing and prospective passengers think about, not cutting running costs to the bare minimum (and then paying more than for the equivalent HR journeys), non-existent expansion programmes, or land value taxes which are unlikely ever to be implemented, and which have no relevance whatsoever to present-day public transport issues.
Oh no. 8 minutes! That's just terrible! I mean, no one ever waits outside for 8 minutes at a bus stop, or at any reasonably modern low-ish-demand HR station. You know what would have been worse? Waiting for 15 minutes, on a line with a maximum 4tph service. HR doesn't mean plush waiting rooms.
Here's a fascinating little fact for you: the annual usage of the Altrincham and Bury lines pre-conversion was 7.5 million, but by 1994 Metrolink was
carrying up to 14 million. If the imposition of Metrolink and LR upon the good people of Manchester had turned people away from public transport, then I don't think we would have seen that. Clearly for normal people all that low-quality LR is actually very appealing.
It is absolutely amazing that a topic like this could attract such total, blind fanaticism. Makes me wonder hoe often some of the people concerned use public transport, and whether they live within 100 miles of the networks they eulogise.
I don't have a car and I am totally dependent on public transport.