Pontefract Baghill & the Dearne Valley - is there any future?

Status
Not open for further replies.

greyman42

Established Member
Joined
14 Aug 2017
Messages
5,368
CrossCountry are diverted this way, and VTEC via Askern (which shares a good part of this route from Knottingley onwards) due to engineering works taking place between Shaftholme Junction and Hambleton South Junctions, closing the usual East Coast Mainline route from Doncaster to York and vice versa.
The VTEC Aberdeen - Leeds service regularly uses part of this route as well.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Grumpy

Established Member
Joined
8 Nov 2010
Messages
1,322
You have to travel on this line to appreciate the sorry state of affairs. I am not aware of any major subsidence issues currently- the slow journey times seem mainly due to timetabling. Over the part of the route not shared with other services (i.e. Moorthorpe-Sherburn) there seem to be hardly any passengers.

On my last journey, last year, the first southbound train carried approx. 6 or 7 passengers when it arrived at Pontefract where a couple joined and a couple alighted. The train then sat for 6 minutes waiting departure time. It ran with this light load to Moorthorpe where it again sat for 6 minutes waiting departure time. At subsequent stations to Sheffield more passengers joined but it could be argued they could have used the other services using the line.

The returning northbound train had a similar load into Pontefract and similar joiners/alighters. At Sherburn the lady guard came round the train and told us not to worry that the train was standing at the platform (where no-one joined or alighted) as it wasn’t booked to depart for 7 minutes.

I haven’t used the service this year but the timetabling issue still seems to exist Thus looking at Realtime trains for 13 February the equivalent southbound train sat 7 minutes at Pontefract and 6 at Moorthorpe. The Northbound return recovered 2 minutes lateness between Pontefract and Sherburn, then sat for 4 minutes at Sherburn.

Mention is made of use of the line by freight. However again looking at Realtime trains for 13 February only 10 freight trains used the route and these were all in night time hours when presumably paths might be found on alternative routes.

As stated by others, you can travel from York to Sheffield by the faster, more frequent and more comfortable Cross-country service. All the communities on the route can access the national network by using other frequent services and changing at the likes of Leeds Doncaster or Sheffield. The only unique contribution made by the route (providing a quicker link Moorthorpe-Pontefract-Sherburn) doesn’t seem to have sufficient users to make it worthwhile. The first question is- is the low usage because there is no market, or because the service is so poor, or a combination? The next question is if you had some spare resource would augmenting this service be a better use than other alternatives. Thus Barnsley and Castleford don’t have a through service to York but they have bigger populations and bigger potential. Passengers from Pontefract can access Castleford easily. Perhaps the service should be rerouted to serve Barnsley and Castleford (as suggested by Billio and others above).

I am surprised no-one has brought up the possibility of running a local service on the Knottingley-Doncaster line. This would offer much faster journeys from Castleford/Pontefract to Doncaster and hence London and could be combined with the clear need (mentioned by johntea above) for an augmented Leeds-Castleford/Pontefract service. Would seem to be much more use than the proposed extending of the Pontefract-Wakefield service to run to Leeds via Westgate
 

backontrack

Established Member
Joined
2 Feb 2014
Messages
6,399
Location
The UK
I am surprised no-one has brought up the possibility of running a local service on the Knottingley-Doncaster line. This would offer much faster journeys from Castleford/Pontefract to Doncaster and hence London and could be combined with the clear need (mentioned by johntea above) for an augmented Leeds-Castleford/Pontefract service. Would seem to be much more use than the proposed extending of the Pontefract-Wakefield service to run to Leeds via Westgate

Hmm.

1tph Leeds-Woodlesford-Castleford-Glasshoughton-Pontefract Monkhill-Knottingley-Norton-Askern-Doncaster?
 

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,615
The VTEC Aberdeen - Leeds service regularly uses part of this route as well.

You perhaps didn't notice that I was replying to a specific query about a diverted trains on a specific day.

Ive not observed VTEC Aberdeen to Leeds going that was for some time now, seems more usual to go through to Doncaster and reverse if the Garforth route isn't available. That said even if it did divert this was it would use a vanishingly small amount of the line which is the topic of this thread.
 

Grumpy

Established Member
Joined
8 Nov 2010
Messages
1,322
Hmm.

1tph Leeds-Woodlesford-Castleford-Glasshoughton-Pontefract Monkhill-Knottingley-Norton-Askern-Doncaster?
Spot on. Without Knottingley,Norton and Askern the Pontefract-Doncaster journey time would be comparable with Pontefract- Wakefield but much more use giving much better access to the south(also from Castleford to the south).
 

xotGD

Established Member
Joined
4 Feb 2017
Messages
7,900
Spot on. Without Knottingley,Norton and Askern the Pontefract-Doncaster journey time would be comparable with Pontefract- Wakefield but much more use giving much better access to the south(also from Castleford to the south).
Grand Central offer some direct journey opportunities between Pontefract and Doncaster. Does anyone know how many passengers use the service for such local trips?
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,664
Very odd. Your link is now showing only 2 trains a day in each direction.
The later train in both directions has been deleted; I hope it makes a comeback. I think it was 17:15 from York and I can't remember the Sheffield departure time.

I felt that the new times were a big improvement and I could see myself using the line more often. It is much more feasible to provide a useable service with 3 trains each way per day, than with only two trains each way per day.
Shortage of DMUs due to non-electrification of the Bolton line? So reduce the losses just don't implement a service that is yet to start maybe?
 

backontrack

Established Member
Joined
2 Feb 2014
Messages
6,399
Location
The UK
Spot on. Without Knottingley,Norton and Askern the Pontefract-Doncaster journey time would be comparable with Pontefract- Wakefield but much more use giving much better access to the south(also from Castleford to the south).
Thanks :)
 

greyman42

Established Member
Joined
14 Aug 2017
Messages
5,368
On the last diversion, Cross Country were doing York - Sheffield in 49 minutes.
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,515
Location
Yorkshire
It's still faster via Doncaster (you can get a station call in and still take a couple of minutes off that time) so there is no reason to favour XC going via Pontefract rather than via Doncaster.
 

Senex

Established Member
Joined
1 Apr 2014
Messages
2,957
Location
York
It's still faster via Doncaster (you can get a station call in and still take a couple of minutes off that time) so there is no reason to favour XC going via Pontefract rather than via Doncaster.
If I remember correctly, the best net schedule times on 10 February via Pontefract shewn in Realtime Trains (but no longer accessible) were 43 minutes both ways, and at least one train southbound (1O86 - I havne't got the full details, but I think a Newcastle to Bournemouth) made it in 43 minutes. The best I found on a quick check northbound was 45 minutes (1E82).
Via Doncaster the WTT net times appear to be 21½ minutes York to Doncaster (the very slow approach to platform 4) and then 19½ minutes Doncaster to Sheffield. Northbound it's 18 minutes Sheffield to Doncaster and 18½ minutes Doncaster to York — which suggests a net best time of 40 minutes including a stop at Doncaster. I have actually known 40 minutes non-stop via Doncaster. As Yorkie says, the Doncaster route easily wins and has the advantage of allowing a large town and major connecting centre to be served. I doubt if even heavy investment in the Pontefract line could get it up to what is already possible via Doncaster.
 

xotGD

Established Member
Joined
4 Feb 2017
Messages
7,900
If I remember correctly, the best net schedule times on 10 February via Pontefract shewn in Realtime Trains (but no longer accessible) were 43 minutes both ways, and at least one train southbound (1O86 - I havne't got the full details, but I think a Newcastle to Bournemouth) made it in 43 minutes. The best I found on a quick check northbound was 45 minutes (1E82).
Via Doncaster the WTT net times appear to be 21½ minutes York to Doncaster (the very slow approach to platform 4) and then 19½ minutes Doncaster to Sheffield. Northbound it's 18 minutes Sheffield to Doncaster and 18½ minutes Doncaster to York — which suggests a net best time of 40 minutes including a stop at Doncaster. I have actually known 40 minutes non-stop via Doncaster. As Yorkie says, the Doncaster route easily wins and has the advantage of allowing a large town and major connecting centre to be served. I doubt if even heavy investment in the Pontefract line could get it up to what is already possible via Doncaster.
I suppose there is the question of whether the paths between York and Doncaster could be better used by other services, such as more York - KX semifasts?
 