Xenophon PCDGS
Veteran Member
They also sound like an good option for a Helsby to E Port shuttle service..
Was there anything in the wording of the current Northern franchise that precluded the use of Class 230 units?
They also sound like an good option for a Helsby to E Port shuttle service..
Was there anything in the wording of the current Northern franchise that precluded the use of Class 230 units?
The self-powered units proposed in the franchise bids for the December 2019 train plan had to be 15xs, 17xs or new build (excluding rebuilt and upcycled.) There is also no requirement to run a Helsby to Ellesmere Port shuttle, the future limited peak time only service on that branch has to work to Warrington and beyond.
And yet there seemed to be no problem subsequently when the class 319s were to be fitted with diesel engines and supplied to Northern Rail - so I think the most you can say is that 230s were not to be allowed when the franchise agreement was signed. Given that the class 769 (is that right) seems to be proving to be more of a problem than was expected I'm somewhat puzzled to know what we will be riding in from Oxenholme to Windermere (for example). I don't expect class 230s but am starting to expect that the "other 22" class 185s will be sticking around in this area (some of them at least).
The 185 would produce diagramming issues for Northern however, there are places they are speed restricted due to axle weight and the more off mainline they are the more weak structures they are likely to encounter.
There is no particular issue with using them on the Barrows and Windermeres, as that is exactly where they are being used now. TBH, if they did stay, I would probably expect an agreement with TPE like the one at present to remain in place.
Why would the lease be any less expensive for any other TOC? In fact I imagine it would be more expensive for another TOC to take on those 185s due to them being the only Siemens diesels in the country.
That's just one point I wanted to pick up on, obviously nothing to do with the 230s.
There is no particular issue with using them on the Barrows and Windermeres, as that is exactly where they are being used now. TBH, if they did stay, I would probably expect an agreement with TPE like the one at present to remain in place.
However 195's have been ordered for the barrow route and 319Flex are intended for Windermere.
I never suggested the lease would be any less for any other TOC, but Northern don't really need 185's if they can get more 170's which might be a bit cheaper and compatible with their existing fleet. Anyway as you say we are somewhat digressing from the 230's
However 195's have been ordered for the barrow route and 319Flex are intended for Windermere.
Back to 230s I still think we can be certain Northern won't be having any.
Vivarail’s first two-car battery unit is in the final-build stages and is due to run on the national network this summer, the company confirmed on February 21.
Two-car 230002, converted from redundant D-Stock, has been approved for passenger use and is the first production battery unit in the UK. The company described it as “a simple and elegant design that will allow battery trains to replace diesel units with a minimum of time and effort”.
Power is provided by two lithium ion batteries per vehicle (four per train). This provides 106kWh, requiring an eight-minute charge at the end of each journey. Vivrail said that with a ten-minute charge that range is extended to 50 miles. As battery technology improves, so these distances can be extended.
In terms of safety, Vivarail said: “The lithium ion batteries on our trains work only within defined temperature parameters and performance is constantly monitored - so should an incident occur it can be quickly contained and the gases will be filtered before being allowed to dissipate naturally.”
A seven-year lifespan is expected for the batteries. They fit into a battery raft using the same space as a diesel genset.
The two-car ‘230’ can be charged via existing overhead line electrification or third-rail, while for non-electrified routes Vivarail has developed a static battery bank as an alternative charger.
Can anyone think of suitable routes for these units - 25 mile or less round trip with 10 minute or more turnaround times
A one way trip to Booths of Rotherham?![]()
The two-car ‘230’ can be charged via existing overhead line electrification or third-rail
The first battery unit is due to run on the network this summer
Can anyone think of suitable routes for these units - 25 mile or less round trip with 10 minute or more turnaround times
I'd love to say Ormskirk-Preston, Kirkby-Wigan Wallgate and Bidston-Wrexham, but I suspect turnaround times are insufficient at current frequencies on all of those.
Basically play a game of "spot the branch line that operates as a branch line with reasonable layovers". The shorter Cornish branches too perhaps? Marks Tey to Sudbury? Thames Valley branches? Windsor shuttle? Stourbridge shuttle once the rubber band finally snaps? There seem to be lots. Actually, it looks like most of the cases for 230s *at all* have a case for the electric version.
It would be interesting if they went from famine to feastMy word, Vivarail will really have to be on the ball in the production batch scheduling to meet all these new prospective orders. Remember they only have "X" number of LU units to build all the new trains from.

Excuse my ignorance but could they be charged while running, as opposed to charging at the end of the journey?
Remember they only have "X" number of LU units to build all the new trains from.
to be commercially viable you need something that can replace all 14x and 150/153 units,with the same or lower running costs..so looking upwards of 500 sets.
basically 2 car unit,with relevant loo/disabled access/cycle or pram bays,100 seats,75mph capable and weighing in at 35-40 tonnes total(with about 1.0m/s/s acceleration)
The 769 Flex is only intended as an interim solution for Windermere, due to them not meeting Northern Connect standards and will be removed from the route in 2019. If Porterbrook get too far behind schedule then they may never operate to Windermere at all!
Excuse my ignorance but could they be charged while running, as opposed to charging at the end of the journey?
theoretically yes as a diesel hybrid.(or LPG/NG turbine if that ever got passed)
you would use the engine to power the main battery and an auxilliary for acceleration.
re-gen brakes also charge the auxilliary.
while the train is at a reversal/terminus the engine would charge both during the dwell time.
LPG/LNG is perhaps more exciting as it uses a lot less moving parts,so you can use waste heat do give cabin heating and hotel load electricity,produce a lot more HP/KW from a turbine(need to keep high RPM constant for best efficiency),and it's a lot lighter...which ought to be a boon on track access charges...perfect for a branch line that requires low running costs and quick acceleration.NG being very much cheaper than diesel.
rolls royce actually do the perfect turbine in one of their concept cars...rated at about 500BHP it's ideal for a VLR type 2 car unit.
the beauty of this method is you also have the battery as "limp home" backup if the engine does fail.
problem with this fuel is flammability in case of an accident,given the state and quantity of the stuff involved,although it ought to be safer than road use,which has already got the green light.
it's basically a big CHP boiler on wheels.
the problematic bit will be the control/phase systems...the electric motors will be running at 750vDC(make exception for the new stock which has AC traction and frequency control...but I'm trying to keep this as low cost and low tech as possible as it's branch line trains we're talking about..lets say budget of £1m for a 2 car multiple unit...if we had to build from scratch and produce a cheap but reliable unit,you wouldn't be fiddling around with fancy control systems, just the comms and signalling stuff would be up to date!)
it's not so easy to switch from that to 25kvAC in parallel, you need a certain period of time where each power source is isolated.