AventraFlex
Member
- Joined
- 3 May 2017
- Messages
- 29
Hi all,
Not sure if this has been done before, but this is a fantasy thread about the closed GCML and a make-believe operator (named Greater Central) running services along the line alongside the exisiting Chiltern services, which would be extended to new destinations. This reopened line would be electrified, though some branch lines would require diesel / bi-mode stock. I think it would've proven to be a useful alternative to the MML and WCML had it remained open, and I have some ideas on what rolling stock would be used and services run, but I'm very curious to know of your opinions.
Greater Anglia is my main influence for my ideas on Greater Central rolling stock.
In the case of the Metropolitan Lines that share the tracks with the Chiltern lines, in this 'fantasy world' they'd either be fully segregated similarly to the Bakerloo / Overground lines on the WCML, providing the all-stations services - if fast services were to still exist they'd simply run through the platforms without stopping. The Met has already been turned into all-stations service off-peak anyway, so I don't think the loss of fast services would have much impact on anyone except for peak hour users. The Chiltern services could serve former Met destinations such as Brill and Verney Junction - the Met would terminate at Amersham as normal.
Here are some links:
https://en.wikipedia.org/wiki/Great_Central_Main_Line
https://en.wikipedia.org/wiki/Great_Central_Main_Line_(diagram)
https://en.wikipedia.org/wiki/Midland_Counties_Railway
https://en.wikipedia.org/wiki/East_West_Rail_Link
I've also provided a link on the Met / Chiltern Line, both of which I'd travelled on numerous times:
http://www.inconvenientmule.co.uk/commuter/?tag=metropolitan-line
It's more relevant on the services run, but I thought it might help to add insight to the current situation on the London-Aylesbury Line.
It would be impossible to reopen the entire line, and Marylebone would have to undergo a massive revamp, but it's just an idea that came to mind recently I'd thought I'd share with you all
I would use Stadler FLIRTs for intercity services to Manchester Piccadilly (the end of the line) (some FLIRTs would be bi-modes) and Hitachi AT200s or AT250s (the gangway versions) for regional express services, in a similar manner to London Northwestern's 350s / future Aventras. Some stopping 'Greater Central' services would use AT100s or AT150s (also gangwayed) for inner suburban and outer suburban services. Some of these could share tracks with the Underground lines.
As for Chiltern, some services would retain their diesel fleet, while newer services for the electrified lines / connecting to the EWRL would use 387s and 365s.
Any alternatives?
Not sure if this has been done before, but this is a fantasy thread about the closed GCML and a make-believe operator (named Greater Central) running services along the line alongside the exisiting Chiltern services, which would be extended to new destinations. This reopened line would be electrified, though some branch lines would require diesel / bi-mode stock. I think it would've proven to be a useful alternative to the MML and WCML had it remained open, and I have some ideas on what rolling stock would be used and services run, but I'm very curious to know of your opinions.
Greater Anglia is my main influence for my ideas on Greater Central rolling stock.
In the case of the Metropolitan Lines that share the tracks with the Chiltern lines, in this 'fantasy world' they'd either be fully segregated similarly to the Bakerloo / Overground lines on the WCML, providing the all-stations services - if fast services were to still exist they'd simply run through the platforms without stopping. The Met has already been turned into all-stations service off-peak anyway, so I don't think the loss of fast services would have much impact on anyone except for peak hour users. The Chiltern services could serve former Met destinations such as Brill and Verney Junction - the Met would terminate at Amersham as normal.
Here are some links:
https://en.wikipedia.org/wiki/Great_Central_Main_Line
https://en.wikipedia.org/wiki/Great_Central_Main_Line_(diagram)
https://en.wikipedia.org/wiki/Midland_Counties_Railway
https://en.wikipedia.org/wiki/East_West_Rail_Link
I've also provided a link on the Met / Chiltern Line, both of which I'd travelled on numerous times:
http://www.inconvenientmule.co.uk/commuter/?tag=metropolitan-line
It's more relevant on the services run, but I thought it might help to add insight to the current situation on the London-Aylesbury Line.
It would be impossible to reopen the entire line, and Marylebone would have to undergo a massive revamp, but it's just an idea that came to mind recently I'd thought I'd share with you all
I would use Stadler FLIRTs for intercity services to Manchester Piccadilly (the end of the line) (some FLIRTs would be bi-modes) and Hitachi AT200s or AT250s (the gangway versions) for regional express services, in a similar manner to London Northwestern's 350s / future Aventras. Some stopping 'Greater Central' services would use AT100s or AT150s (also gangwayed) for inner suburban and outer suburban services. Some of these could share tracks with the Underground lines.
As for Chiltern, some services would retain their diesel fleet, while newer services for the electrified lines / connecting to the EWRL would use 387s and 365s.
Any alternatives?