Yes, we know - the whole point of our argument is that that's a terrible idea. You pay your money, you get your choices. The fact that they're cutting corners to save money IS the problem
There's a difference between investing to do something and investing to improve something. This is investing to do something, because they "can't afford" - or rather they don't want to afford - to invest in genuine improvement. They're holding their hands up to say "we don't have enough money to do what you really want us to do, so here's this triangulated compromise", and it's a totally hideous idea.
The reason for those lower operational costs are less staff and worse trains. Obviously it's going to be a cost saving if you strip out what people want. Why not go the whole hog, close it all down and just stick people on the buses? That would cut operational costs massively. It'd be a really stupid, terrible idea, though. And it's not too different from what they're planning to do here
If you want to do it properly, to get a high quality, efficient usable public transport system, you've got to spend more money. Every city in Europe with a good public transport system shows that you have to have significant investment and a clear plan, not half-and-half compromise and austerity politics. That's always going to be a recipe for disaster, without exception
And for all that doing it on the cheap saves money on the surface in the short term, the point the Gareths are making is that it doesn't save money in the long term. Having a terrible public transport system is a net cost to the economy of South Wales and having a relatively bespoke system makes it harder to keep reinvesting to extend and renew later on. Heavy rail electrification comes with a cost up front but in the long term it's far more sustainable. You're being fooled by the baseline figures just as much as the politicians if you don't see that
Desiring more efficient public transport spending is a totally orthogonal issue to how much a government wants to prioritise public transport.
Wasting money on inefficient service provision simply for the sake of keeping spending high is not good for anyone. If you make public transport more effective, then with the same amount of subsidy you can
deliver even more. If you want to increase funding, your extra money goes even further than before. If the Valley Lines cost 2/3rds as much to run while delivering 90% of the benefit, you could make back that lost benefit plus more while still saving money compared to today. If you really can't think of any actual investment to spend that on, you can lower fares instead.
Go and actually look at high-quality European transport systems before you say it's just about being on the cheap. Urban regions comparable to South Wales use light rail technology to provide the best possible transport for the lowest possible price. There is absolutely nothing unusual about the ideas for light rail in South Wales from the perspective of a public-transport friendly area on the Continent. Religious belief in heavy rail above all else doesn't help people with the task that urban and regional transportation systems are ultimately trying to solve: allowing people to go to as many places as quickly and cheaply as is reasonably possible.
Do you think this will get past the unions? DOO on the Valleys and drivers being de-skilled and having their pay substantially cut? WG are desperate to avoid any strike action in Wales, hence the guard on every train promise.
The only way the unions would agree without a fuss is for all pay and conditions of all guards and drivers currently on the Valleys to be fully protected for the length of the 15 year franchise.
Honestly I cannot see promises of guards being kept on the Valley Lines being kept at all. If there's one thing the Welsh Government are going to need to be secretive about, it's that there's no way existing staffing arrangements can ever be kept. There's absolutely no way that anyone can justify guard operation on a light railway. If the vehicles are legally permitted to drive through a pedestrianised city square, then it is absurd to argue they would be unsafe to operate without a guard performing duties. A second member of staff on board may well happen - since Edinburgh justifies a permanent ticket inspector on 40m vehicles I think a 100m doubled set makes the case pretty compelling - but it is not a safety-critical role.
There'll probably be a deal where existing guards aren't going to be made totally redundant or have their pay cut. But, the cost savings will apply into the future as new recruits won't be inheriting the same pay and conditions.
Chris Grayling denied any responsibility for transfer of NR to WG as he said 'there was no political appetite for it'.
Once this franchise is let the talk of any rail investement in Wales will cease for another 14 years.
Does NR need to be devolved? No. The concept here would be tram-trains/train-trams which would run on NR infrastructure. NR are perfectly capable of handling a mixed network situation. In London there are London Underground services running on NR tracks and National Rail services running on LUL tracks.
The justification for devolution is cost savings. If the Vale of Glamorgan stopping services aren't transferred to TfW, then the DfT is going to have to worry about and pay for them instead. They don't like the status quo of high subsidy. Even if Chris Grayling doesn't like devolution and doesn't like handing power over to a Labour government, he dislikes pouring taxpayer's money down a public transport drain even more.
What WG won't justify is spending on public transport full stop. Obviously they had plans to introduce more services otherwise CASR would never have happened. Road building took priority.
I am still yet to hear a solution to the splitting up of a cross-city network that only functions operationally so well because it operates cross city and as few services as possible terminate in Cardiff Central. This doesnt just apply to Valleys services, it applies to mainline services as well. Cardiff Central is not a station fit for mass termination and turn around of services.
With no electrification south of Queen St planned, please let me know how this will be solved.
Cross-city services are crucial when you've got rail networks balanced either side of an urban area. In Cardiff, there's no urban areas to the south of the city centre. All that's there is the Bristol channel. East-west links aren't going to go away. The amount of extra 750V DC wiring needed to get Barry Island and Penarth served by LR trains running on NR metals is a small fraction of the total needed for the rest of the Valleys, but would preserve essentially all cross-city connections already in existence.
And once again, the bidders for the Valley Lines consist of infrastructure and operations companies. The operator will push for a network design which will be cheap and efficient for them to run. Breaking through running arbitrarily is only going to mean higher costs for them, when the solution is really rather simple.