For the MML expresses, yes, but for 158/159 replacement you certainly don'tWhatever is ordered must be 125mph capable.
For the MML expresses, yes, but for 158/159 replacement you certainly don'tWhatever is ordered must be 125mph capable.
Possibly as part of a major rebuild, but they're all promised to the Portsmouth Direct expresses under SWR I thought, where they won't need diesels.Could u bi-mode a 442?
The 319s can't even keep up with the timetable on the Manchester Airport stoppers!Bi Mode conversions of 158/9s is a joke. Sadly what I can see them finding feasible is the hybrid 319s or worse hybridising 455s. This would be a downgrade of what are very well suited units for the routes they serve.
Don't worry, it's only a few years until the Grayling realises it'll be political suicide to let new trains sit in the sidings and all the 319s are scrapped...The 319s can't even keep up with the timetable on the Manchester Airport stoppers!
Don't worry, it's only a few years until the Grayling realises it'll be political suicide to let new trains sit in the sidings and all the 319s are scrapped...
It's vastly, vastly easier to convert EMUs to bi-modes by just adding a generator or two (be that under or above floor) than it is to convert DMUs to bi-modes (with the need to add all sorts of electrical gubbins etc).
Lets take tachnology a step further, is it possible to have electric motors providing power to the hydraulic systems?
Aside from the poor acceleration characteristic, they're doing their job. Do you think Grayling's really going to pay any heed to the north?
Hydraulics work on a pressure basis
You could body mount a large traction motor feeding into the existing gearboxes and final drive, but there would be no point putting it through the hydraulic transmission as it would duplicate that function and waste energy.
...but we'll continue to see suggestions for filling the route with unsuitable trains (Voyagers, Meridians etc)![]()
Like Voyagers, class 91s and ATP-P power cars. There may be others. Less unsprung weight than axle hung motors.
I'm not a hydraulic expert, but I thought the final drive from the output side of the transmission to axle gearboxes also typically used mechanical cardan shafts, and what I thought Bletchleyite meant was substituting a body mounted traction motor where the hydraulic transmission module is today, reusing the mechanical cardan shafts and gearboxes.Those are mechanical Cardan shafts, not hydraulic gearboxes.
I'm not a hydraulic expert, but I thought the final drive from the output side of the transmission to axle gearboxes also typically used mechanical cardan shafts, and what I thought Bletchleyite meant was substituting a body mounted traction motor where the hydraulic transmission module is today, reusing the mechanical cardan shafts and gearboxes.
http://www.westernchampion.co.uk/loco-d1015-technical.php
If the engine stays in the same place, then both the alternator and the traction motor would have to go into the space vacated by the hydraulics. I think that's a pretty tall order.Yes, that's what I meant. The hydraulic "gearbox" would be removed.
If the engine stays in the same place, then both the alternator and the traction motor would have to go into the space vacated by the hydraulics. I think that's a pretty tall order.
Some bogies, such as the BR series 3 used first on the PEP units and most recently on Electrostars and Turbostars, have used either traction motors or cardan shaft drive in the same basic design. However I'm not sure if a bogie can be converted from one to the other, as they may have different mountings etc. As far as I'm aware the T4 bogie used on the 158/159 has only ever been used with a cardan drive or unpowered.
Yes, nearly all diesel/hydraulics use multiple torque converters and fluid couplings and switch between them to change gear, although there's a trend towards conventional bus type automatic gearboxes.Not Sprinter transmissions. They essentially work by a large "fan" turning the oil which turns another "fan" connected to the wheels, in very simplified terms.
Why? 100mph would be quite adequate.
I read it as the expresses under discussion, not the local fleet.For the MML expresses, yes, but for 158/159 replacement you certainly don't
Not on the Midland Main Line it wouldn't. Majority of linespeed in excess of 100mph with a decent bit 120-125mph!

I read it as the expresses under discussion, not the local fleet.
If I (BEng, MEng, CEng) were engineering Bi-mode conversion for 159s assuming 455s can be canabalised for parts..
The proposal is clearly not as ridiculous as initial responses suggested.