The below are taken from the SWR franchise thread, what are people's views?
I thought starting a new thread would open it to a wider audience.
I thought starting a new thread would open it to a wider audience.
The Franchise agreement has now appeared on the DfT website, including a rather odd requirement to look at the feasibility of converting their ~30 year old DMUs into bi-modal DEMUs.
?!?!?!?!?!?!?!?!?!? what sort of idiots do the have working at the DFT? converting DEMU's or EMU yes but DMMUs? the would surely need some quite heavy modification, not least finding space for both traction convertors, motors AND still have space for an engine with enough power not only to not impede acceleration but to be able to operate at a minimum of 90mph.
It is only a feasibility study, but it is one that I could probably write right now! I suspect the answer may come back as "try again with more appropriate stock" - but seeing it in the franchise agreement really hammered home that bi-mode is flavour of the month/year/parliament at the DfT
Seeing as BR had serious proposals around 1990 to extend 3rd rail to either Salisbury or Exeter it’s a shame going by what you suggeting we’re unlikely to be any further forward almost 30 years later.
Strictly speaking they are DHMUs not DMMUs.
But the point is very valid. Why is there this obsession with UPOW* multiple units?
* Under Powered Over Weight
I would like to see electrification extended West from Basingstoke, however I would guess that it's likely to happen in stages (i.e. possibly taking over 5 years) to reach all the way to Exeter and so I can see the logic in having units that can take advantage of the new wires.
However where it could really be beneficial is once the wires reach Yeovil and SWR can then replace the units with straight EMU's. As then other areas could then have access to the 158/159's. My guess would be that they would be preferable to the converted 319's not least due to their air conditioning.
It could also mean that (given the SWR have funded the first units) the rest of the 158 fleet could follow as the big development costs have been covered, making the cost per unit for the rest of the fleet less than what the SWR fleet had cost.