159
Member
Just a query about long-distance SWR services.
In my opinion, these are not run like proper Intercity services, which they should be.
Some of these lines, e.g. to Portsmouth, are using commuter-grade 450s.
Also, include 4 bike spaces per carriage - you should see how crowded these get on weekends.
The services themselves are quite slow, except when it comes to peak times - to get to Southampton, the Poole and Bournemouth, one has to stop at Clapham Junction, Woking, (BSK), Winchester and then a slow calling pattern all the way to Weymouth.
The services are too regular as well - I would welcome a more diverse calling pattern off-peak, e.g.
0.5tph Wat-CLJ-Salisbury-Exeter,
0.5tph Wat-WOK-BSK-Andover-Salisbury,
0.5tph Wat-Salisbury-Yeovil-Axminster-Exeter
0.5tph Wat-BSK-Westbury-Bath-Bristol
and 1 tph BSK-Exeter semi-fast,
1.5 tph BSK-Exeter slow
These services also only achieve 100mph from Farnborough to around St Denys. Line speeds could be easily upgraded to 125mph in that section and 100 from Wimbledon (current 80).
NR should create more passing loops on WoE and quad track and straighten out the New Forest part of SWML.
In my opinion, these are not run like proper Intercity services, which they should be.
Some of these lines, e.g. to Portsmouth, are using commuter-grade 450s.
Also, include 4 bike spaces per carriage - you should see how crowded these get on weekends.
The services themselves are quite slow, except when it comes to peak times - to get to Southampton, the Poole and Bournemouth, one has to stop at Clapham Junction, Woking, (BSK), Winchester and then a slow calling pattern all the way to Weymouth.
The services are too regular as well - I would welcome a more diverse calling pattern off-peak, e.g.
0.5tph Wat-CLJ-Salisbury-Exeter,
0.5tph Wat-WOK-BSK-Andover-Salisbury,
0.5tph Wat-Salisbury-Yeovil-Axminster-Exeter
0.5tph Wat-BSK-Westbury-Bath-Bristol
and 1 tph BSK-Exeter semi-fast,
1.5 tph BSK-Exeter slow
These services also only achieve 100mph from Farnborough to around St Denys. Line speeds could be easily upgraded to 125mph in that section and 100 from Wimbledon (current 80).
NR should create more passing loops on WoE and quad track and straighten out the New Forest part of SWML.