TRUG is no more AFAIK, the Marlow - Maidenhead Passengers' Association (MMPA) look after matters here.
I've seen the public PDF plans for the new footbridges on the line (this was done before the mishap with the rail-crane with the old Taplow footbridge), I recall that the layout of the footbridge lift on the central island platform would take advantage of the extra width available as platform 2 was decommissioned. I expect that raising the platform height would cost ££££.
I've seen the public PDF plans for the new footbridges on the line (this was done before the mishap with the rail-crane with the old Taplow footbridge), I recall that the layout of the footbridge lift on the central island platform would take advantage of the extra width available as platform 2 was decommissioned. I expect that raising the platform height would cost ££££.

