Many delays and cancellations throughout the day, some delays in 3 figures, starting originally from the weather conditions yesterday but aggravated by further incidents, the Marches route being the prime sufferer.
The line was closed firstly between Newport and Abergavenny and then between Abergavenny and Hereford due to trees either blocking the line or overhanging over it due to the weight of snow. Bustitution difficult due to road conditions. but when the line re-opened late morning a points failure at Craven Arms occurred causing further disruption. Fresh trains were started from Cardiff to maintain normal working towards West Wales.
Also suffering badly was the Heart of Wales line between Llandovery and Llandrindod which is likely to remain closed until Wednesday after Network Rail are expected to work during the day tomorrow, their resources being stretched and difficulty in reaching sites where trees had come down. The route difficulties were further aggravated by a 1201 Llandrindod Wells to Shrewsbury which failed between Knighton and Craven Arms and has having to be rescued by a 1Z99 DMU from Shrewsbury due to a major systems failure, 1Z99 also conveying Maintenance technicians to enable the train to be moved and ETA Shrewsbury is 390L.
Further to this a lorry has struck a bridge at Aberbeeg causing damage but following inspections, trains are allowed to travel at slow speed but severely delaying and cancelling Ebbw Vale services.
Due to these problems there has been a disastrous knock on effect at Cardiff apart from on the Cardiff Valley lines. Will add a little more shortly after seeking further info.
ADD:- 2T08 ex Llandrindod now arrived Shrewsbury at 2032 420L. Not all due failure as 139L departing.
The line was closed firstly between Newport and Abergavenny and then between Abergavenny and Hereford due to trees either blocking the line or overhanging over it due to the weight of snow. Bustitution difficult due to road conditions. but when the line re-opened late morning a points failure at Craven Arms occurred causing further disruption. Fresh trains were started from Cardiff to maintain normal working towards West Wales.
Also suffering badly was the Heart of Wales line between Llandovery and Llandrindod which is likely to remain closed until Wednesday after Network Rail are expected to work during the day tomorrow, their resources being stretched and difficulty in reaching sites where trees had come down. The route difficulties were further aggravated by a 1201 Llandrindod Wells to Shrewsbury which failed between Knighton and Craven Arms and has having to be rescued by a 1Z99 DMU from Shrewsbury due to a major systems failure, 1Z99 also conveying Maintenance technicians to enable the train to be moved and ETA Shrewsbury is 390L.
Further to this a lorry has struck a bridge at Aberbeeg causing damage but following inspections, trains are allowed to travel at slow speed but severely delaying and cancelling Ebbw Vale services.
Due to these problems there has been a disastrous knock on effect at Cardiff apart from on the Cardiff Valley lines. Will add a little more shortly after seeking further info.
ADD:- 2T08 ex Llandrindod now arrived Shrewsbury at 2032 420L. Not all due failure as 139L departing.