168lover
Member
Double track into London Marylebone in the peak sees 33 train movements in an hour which is a fair few
I'm starting from the observation that county and other councils lobby for lots of road schemes to "ease congestion" and quite a lot get built, all over the place. I don't remember seeing a thread that explores this in the rail context.
Having been delayed the other day on departure southbound from Crewe awaiting the passing of a late-running express it occurred to me that there are places on the network where delays can multiply for the lack of a little bit of infrastructure, but not many smaller improvements get made. In fact I would guess that "simplifications" to reduce ongoing maintainance costs are more likely [common] even though they make the network less resilient.
In the case of Crewe I was quite surprised to see on Open Train Times (http://www.opentraintimes.com/maps/signalling/crewe) that at Crewe South Junction there are only 3 tracks for all the WCML traffic at one point, even though it is a 4-track railway everywhere else south of Weaver Junction. Clearly the continuation of the line through platform 5 southbound would allow stoppers to depart and get further south before taking their place behind the delayed non-stop trains. (the situation occurs repeatedly, e.g.at 1249 today.)
I am aware of the 2-track eastern approach to Edinburgh Waverley where the ECML and now the borders line enter the station, besides other big jobs that need doing like Welwyn on the ECML and Oxford Rd to Piccadilly in Manchester. There are also some single-lead junctions where one delay must snowball causing much wider consequences,
How many other pinch points are there (nationally) and how would you rank them in terms of benefits to be gained versus the costs?
Double track into London Marylebone in the peak sees 33 train movements in an hour which is a fair few
... but at least the fleet performance should improve in the near future, whereas there's no obvious quick fix for the infrastructure.
Manchester Piccadilly Platforms 13/14 to Manchester Oxford Road, doesn't help the lines into Piccadilly from Ardwick & beyond are also very busy, so few trains can start/terminate at Piccadilly P13/14.
Ardwick Jn outside Manchester Piccadilly for trains passing through to Oxford Road. Of course this is being solved by Ordsall Chord, rerouting etc.
The Leeds-Hull line was for a while but that was a rolling stock issue. Still not great mind.
There’s a certain TPE service that often gets stuck behind a Northern stopper between Huddersfield and Stalybridge and can’t pass. They’re about five minutes apart all that way and the TPE is the second train after the Northern stopper that starts at Hud going on to Wigan or wherever. The stopper is terrible at keeping time and any delay on that puts the TPE behind it back a similar amount. Annoying when said TPE service is the one that has to get through Ardwick Jn to the Oxford Road corridor.
Many years ago, didn't the ECML franchisee at the time, I forget who, try to get Welwyn North closed to speed up long-distance trains?
Much as Hertford is useful during engineering works, or more long-term closures like after the Hatfield and Potters Bar accidents, it's virtually useless for the day-to-day service, since the loop now carries an intensive service in its own right. Even if one could find a path for a fast train or two per hour going this way, reliability would be abysmal due to the risk of something or other running late and thus the fast service getting stuck behind a stopping train.
Am I right in thinking that the reason the Hertford Loop can't be improved by adding more tracks is mostly due to a bad alignment?