I'm starting from the observation that county and other councils lobby for lots of road schemes to "ease congestion" and quite a lot get built, all over the place. I don't remember seeing a thread that explores this in the rail context.
Having been delayed the other day on departure southbound from Crewe awaiting the passing of a late-running express it occurred to me that there are places on the network where delays can multiply for the lack of a little bit of infrastructure, but not many smaller improvements get made. In fact I would guess that "simplifications" to reduce ongoing maintainance costs are more likely [common] even though they make the network less resilient.
In the case of Crewe I was quite surprised to see on Open Train Times (http://www.opentraintimes.com/maps/signalling/crewe) that at Crewe South Junction there are only 3 tracks for all the WCML traffic at one point, even though it is a 4-track railway everywhere else south of Weaver Junction. Clearly the continuation of the line through platform 5 southbound would allow stoppers to depart and get further south before taking their place behind the delayed non-stop trains. (the situation occurs repeatedly, e.g.at 1249 today.)
I am aware of the 2-track eastern approach to Edinburgh Waverley where the ECML and now the borders line enter the station, besides other big jobs that need doing like Welwyn on the ECML and Oxford Rd to Piccadilly in Manchester. There are also some single-lead junctions where one delay must snowball causing much wider consequences,
How many other pinch points are there (nationally) and how would you rank them in terms of benefits to be gained versus the costs?
Having been delayed the other day on departure southbound from Crewe awaiting the passing of a late-running express it occurred to me that there are places on the network where delays can multiply for the lack of a little bit of infrastructure, but not many smaller improvements get made. In fact I would guess that "simplifications" to reduce ongoing maintainance costs are more likely [common] even though they make the network less resilient.
In the case of Crewe I was quite surprised to see on Open Train Times (http://www.opentraintimes.com/maps/signalling/crewe) that at Crewe South Junction there are only 3 tracks for all the WCML traffic at one point, even though it is a 4-track railway everywhere else south of Weaver Junction. Clearly the continuation of the line through platform 5 southbound would allow stoppers to depart and get further south before taking their place behind the delayed non-stop trains. (the situation occurs repeatedly, e.g.at 1249 today.)
I am aware of the 2-track eastern approach to Edinburgh Waverley where the ECML and now the borders line enter the station, besides other big jobs that need doing like Welwyn on the ECML and Oxford Rd to Piccadilly in Manchester. There are also some single-lead junctions where one delay must snowball causing much wider consequences,
How many other pinch points are there (nationally) and how would you rank them in terms of benefits to be gained versus the costs?