Actually reminds me of the 376s, in a weird sort of way. (And those aren't bad units - save for some glaring omissions in the spec sheet, such as air con!)
 

route:oxford

Established Member
Joined
1 Nov 2008
Messages
4,949
Really like the USB sockets.

Good obvious location that doesn't need scrabbling at foot level and are in sight as you get up to leave the train.
 

simple simon

Member
Joined
13 Feb 2011
Messages
728
Location
Suburban London
I thought that the D stock (and for that matter, the C stock) were both built cabling suitable for use on lines with voltages of at least 1000v.

This was because they operated on British Rail lines which were electrified at 750v dc and standard higher / lower fluctuations meant that they would sometimes see 900v - or even more.

The more voltage upgrades on the Subsurface lines had to wait for the A stock to go and are not being applied to routes shared with Piccadilly Line 1973 tube stock.

Simon (replying to some messages dated 17th September)
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Today's Railways UK are reporting D-Trains will enter passenger service on the Bedford to Bletchley route at the December 2018 timetable change.
 

gazthomas

Established Member
Joined
5 Jun 2011
Messages
3,466
Location
Llandudno
Posted on Vivarail's website on Tuesday 11 October 2017:

"New trains, new technology and new jobs

Earlier this year we announced that the first two D-Trains would be ready for service in 2018. To make this happen:
  • we scaled up our production process and built a new strip-out facility
  • we employed new people: creating jobs and investing in training to create a highly skilled workforce
  • we built relationships with key suppliers – industry-leading experts in their own right
And we became excited about battery technology!"

http://vivarail.co.uk/new-trains-new-technology-new-jobs/
 

Old Hill Bank

Member
Joined
6 Mar 2010
Messages
971
Location
Kidderminster
Posted on Vivarail's website on Tuesday 11 October 2017:

"New trains, new technology and new jobs

Earlier this year we announced that the first two D-Trains would be ready for service in 2018. To make this happen:
  • we scaled up our production process and built a new strip-out facility
  • we employed new people: creating jobs and investing in training to create a highly skilled workforce
  • we built relationships with key suppliers – industry-leading experts in their own right
And we became excited about battery technology!"

http://vivarail.co.uk/new-trains-new-technology-new-jobs/
Well we have been told that Marston Vale is planned to go 230 operation next December (2018) but they are still unable to confirm a single order, don't you just love the rail industry.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
What about those orders Viverail claimed they had many months ago, but would not confirm what they were.

I imagine one 'order' was the current LM franchise agreeing to a trial, only for the trial to fall through after the prototype caught fire and they couldn't fix it in time.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,773
Location
Nottingham
Speculating, the other order may have been for trains to take construction workers to the Moorside nuclear power station, which now won't be built for some time (if ever).
 

keith1879

Member
Joined
1 Jun 2015
Messages
393
Also possible that Abellio approached them ages ago re the Marston Vale but the order was subject to the franchise win. This could explain the secrecy.

Seems a highly likely explanation to me. Wouldn't it be nice if we could all just wait and see what happens now that there seems to be a real prospect of them actually being used.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,287
This whole programme does seem really slow, 3 years down the line to get 2 units in service
 

coppercapped

Established Member
Joined
13 Sep 2015
Messages
3,339
Location
Reading
This whole programme does seem really slow, 3 years down the line to get 2 units in service
Hmm! It's a question of proportion!

The decision to order Hitachi's Class 80X trains for the IEP was made by the DfT in March 2011 and the contract was placed in July 2012.

It's now 12 October 2017 and none of them have yet entered service - that 6 1/2 years since the original decision and 5 1/4 years since the contract was signed. Two World Wars were each fought in less time.

If Vivarail gets its trains out next year then it will be a hare among the tortoises...
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Hmm! It's a question of proportion!

The decision to order Hitachi's Class 80X trains for the IEP was made by the DfT in March 2011 and the contract was placed in July 2012.

It's now 12 October 2017 and none of them have yet entered service - that 6 1/2 years since the original decision and 5 1/4 years since the contract was signed. Two World Wars were each fought in less time.

If Vivarail gets its trains out next year then it will be a hare among the tortoises...

D-Trains were seen as an alternative to brand new DMUs.

Vivarail started working on the prototype unit in early 2015, having agreed to purchase the D-Trains in late 2014.

CAF signed the Civity agreement with Arriva in early 2016.

Yet both are set to enter passenger service in 2018, with Vivarail having missed a deadline to get the D-Trains introduced this year.
 

mushroomchow

Member
Joined
14 Feb 2017
Messages
455
Location
Where HSTs Still Scream. Kind of.
The Marston Vale does seem like a good candidate. Fairly detached from the wider network, 60mph limit, quite a few stops giving the acceleration capabilities a good test.

And of course, if things go belly-up, it won't be too much hassle for WMR to draft in a DMU to fill the gap.
 

Old Hill Bank

Member
Joined
6 Mar 2010
Messages
971
Location
Kidderminster
The Marston Vale does seem like a good candidate. Fairly detached from the wider network, 60mph limit, quite a few stops giving the acceleration capabilities a good test.

And of course, if things go belly-up, it won't be too much hassle for WMR to draft in a DMU to fill the gap.

The biggest problem LM have and WMT will have is getting DMUs between Tyseley and Bletchley along with the associated traction and route knowledge required. To have three 2-car units that can be maintained locally has to be a bonus.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,287
Hmm! It's a question of proportion!

The decision to order Hitachi's Class 80X trains for the IEP was made by the DfT in March 2011 and the contract was placed in July 2012.

It's now 12 October 2017 and none of them have yet entered service - that 6 1/2 years since the original decision and 5 1/4 years since the contract was signed. Two World Wars were each fought in less time.

If Vivarail gets its trains out next year then it will be a hare among the tortoises...

But then those are brand new and complicated trains (and bought through a vastly complicated procedure too)

The D-Trains are meant to be a cheap and timely solution to a short term lack of DMUs, rebuilding existing stock. That they are now talking about battery technology suggests project drift, as the target market is slowly drifting away...
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,204
That they are now talking about battery technology suggests project drift, as the target market is slowly drifting away...

Can't say I agree on this, battery train technology is definitely something that is looking at a big push in development for the future.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,204
Not many lines need them. Most can take 23m carriages or if not then it's a relatively simple project to lengthen platforms.

However there's not much point doing the lengthenings once and then again, if the stations are going to be ripped out in ~10 years anyway for EWR.
 

Old Hill Bank

Member
Joined
6 Mar 2010
Messages
971
Location
Kidderminster
Not many lines need them. Most can take 23m carriages or if not then it's a relatively simple project to lengthen platforms.
That is a far to simplistic view. Often there is other infrastructure in the way and it all costs money to move. If it's a signal major reassessments may be required, if its a set of points or lord forbid a level crossing involved a seemingly simple task gets quite involved and therefore expensive.
 