Llanigraham
On Moderation
Network rail just being Network Rail.......useless!!
And of course, you being an expert in all manner of electronics, interlocking and railway procedures could have done better?
:roll::roll::roll:
Network rail just being Network Rail.......useless!!
I'm certain that it wasn't NR that installed the stuff along there, it was either BR or Railtrack and as such NR have been put in the unfortunate position of having to pick up the pieces when that kit goes kaput.
Anyone know who installed the kit in Slough IECC?
And of course, you being an expert in all manner of electronics, interlocking and railway procedures could have done better?
:roll::roll::roll:
There's always 'anoraks' who like to point out every bit of inaccuracy in a documentary, but what we should all be grateful for is that there is a television documentary about railways. Just enjoy it.To us it may seem a bit annoying but to the general public they have no idea and it doesn't really cause too much issue.
I did find it hilarious, and extremely annoying, when the cockwomble motioned the camera towards him to he could have it out with the poor member of staff about why "he" didn't fix the signalling issues and that he pays £5000 for a ticket etc.... whilst his frustration is understandable, his attitude just made him look like an idiot and was definitely for the cameras![]()
Read thisWith the data links is it something like a network card in each point (set of blades) and signal connected to a network switch, connected to a network switch, then connected to a high speed data link to the signalling centre?
If it was my job to repair these things. Yes I would hope I would have at least ensured the same thing didn't happen again but worse 24 hours later.
Or I would expect some repercussions.
I did find it hilarious, and extremely annoying, when the cockwomble motioned the camera towards him to he could have it out with the poor member of staff about why "he" didn't fix the signalling issues and that he pays £5000 for a ticketetc.... whilst his frustration is understandable, his attitude just made him look like an idiot and was definitely for the cameras![]()
If it was my job to repair these things. Yes I would hope I would have at least ensured the same thing didn't happen again but worse 24 hours later.
Or I would expect some repercussions.
Thank you, confirms my original thought, you don't work for the railway and you don't know or understand anything about the systems used.
:roll::roll:
What is your problem? Seriously?
It doesn't make a difference what I do for work or whether I understand these particular systems or not.
If I went to work made a mistake / didn't fix something that was my job to fix, which caused as much financial and general unrest and chaos as this did and then let it happen or didn't prevent it happening again causing even more chaos less than 24 hours later there would be consequences for me / my company.
I dont understand why you take issue with that.
I look forward to your next post with rolling eyes. It seems to happen a lot in your posts.
It must be wonderful to be you.............:roll::roll::roll::roll::roll:
somewhat unfair maybe ? I have not seen the documentry, but are we certain the fault was exactly the same fault again ? and as for these season ticket holders that think they own the railway, as PLYMOTHIAN states they get the cheapest travel of all, but do not like to have that bit pointed out to them it seems !Network rail just being Network Rail.......useless!!
Yeah it was the same fault. There were two devices inside a data link - A and B. Both failed due to heat, they removed B and then A came back online which then failed the next day. Or something to that extentsomewhat unfair maybe ? I have not seen the documentry, but are we certain the fault was exactly the same fault again ? and as for these season ticket holders that think they own the railway, as PLYMOTHIAN states they get the cheapest travel of all, but do not like to have that bit pointed out to them it seems !
It doesn't make a difference what I do for work or whether I understand these particular systems or not.
If I went to work made a mistake / didn't fix something that was my job to fix, which caused as much financial and general unrest and chaos as this did and then let it happen or didn't prevent it happening again causing even more chaos less than 24 hours later there would be consequences for me / my company.
I dont understand why you take issue with that.
Yeah it was the same fault. There were two devices inside a data link - A and B. Both failed due to heat, they removed B and then A came back online which then failed the next day. Or something to that extent

It may well have been fixed, but a 'new' part simply failed, not much you can do about that really, we had some new LED recessed light installed, one of them failed, so bought a new 'branded' one, worked a treat for 1 day they went pop ! replaced again with another, been fine ever since![]()
What is your problem? Seriously?
It doesn't make a difference what I do for work or whether I understand these particular systems or not.
If I went to work made a mistake / didn't fix something that was my job to fix, which caused as much financial and general unrest and chaos as this did and then let it happen or didn't prevent it happening again causing even more chaos less than 24 hours later there would be consequences for me / my company.
I dont understand why you take issue with that.
I look forward to your next post with rolling eyes. It seems to happen a lot in your posts.
It must be wonderful to be you.............:roll::roll::roll::roll::roll:
I finally caught up with the series last night, but having looked at the My5 app again, it would appear that episode 4 has disappeared.Tried to watch the latest episode, only to find My5 catchup has not uploaded it.
It actually does. It's the crux of the matter for fault finding. Your lack of knowledge, while spouting this or that should happen is a problem.
Because your lack of knowledge of the subject is very good reason to take issue with.
Try fault finding a complex system, that presents varying symptoms, while the phone is ringing constantly from control looking for updates.
As soon as the fault has cleared, but not necessary been rectified, trains are running again, and further access to work on that equipment has gone.
Would you rather they have held all services until the fault was fully rectified, or get services back running again?
Keep in mind that the night shift Techs may well have other time critical work to attend to during the no train period, would you suggest that that work is cancelled, possibly causing further delays if S&T attendance at P-Way work doesn't happen, and they go back and look for a fault that may not actually be there any longer?
I've (and I'd bet every other Tech) have spent hours looking for something, that may only ever happen very, very briefly, only for it to disappear, all while the readings appear to be in spec.
Trying to find that, in very small gaps with trains running is a difficult job, and there is only a finite number of staff to attend.
If you are not happy with why there is a lack of staff to fault the equipment, address your complaints to NR management, the Phase 2bc reorganisation, and not the Techs.
How many episodes is the series meant to run for?
Eight according to Network Rail.
https://www.networkrail.co.uk/new-documentary-series-begins-tonight-paddington-station-247/
I finally caught up with the series last night, but having looked at the My5 app again, it would appear that episode 4 has disappeared.