Well if the Tory MP is making sense, its more than can be said for your comments that's for sure.
The wires wont be going to Oxford for the moment but they are not stopping at Didcot and will run to Cardiff as planned, and I think its unlikely that wires will not get to Oxford at some point.
Well yes Network Rail have gone vastly over budget and time and while you could argue that Network Rails management of it has been Second Rate I'm not sure you can call the actuall project Second Rate
Really I doubt many people would agree about the Voyager, the point is IEP will substancially reduce Diesel under the wires running, and will certainly be quieter than a Voyager on Electric and according to those who have been on IEP its quieter on Diesel as well. Yes an alternative would have been to use Pendolino with probably some diesel dragging, but Dft decided IEP was a more flexible and cost effective solution, and whether you like the Bi-mode concept or not I'm not sure you can call it a second rate solution
The electrification was never planned to go anywhere near Newton Abbot so that was never going to happen, and the Electrostars were never planned to serve Bristol on any regular basis as far as I am aware.
amazingly a tory is speaking sense..BI-MODE shouldnt really be required, they are second best and the only winners in this farce are hitachi.
The joke of GWML and stopping the wires at didcot ? the question one has to ask is, why bother in the first place ?!
The wires wont be going to Oxford for the moment but they are not stopping at Didcot and will run to Cardiff as planned, and I think its unlikely that wires will not get to Oxford at some point.
Network rail & the Government should be hanging their heads in shame at treating the GWR like a second class electrification project. It Makes a mockery of everything Brunel, his contractors and Navvies acheived, what BR engineers did when upgrading to 125mph on the western routes. GWR really should lose the G now - and just be Western Railway as there is nothing great in this 2nd rate electrification project.!
Well yes Network Rail have gone vastly over budget and time and while you could argue that Network Rails management of it has been Second Rate I'm not sure you can call the actuall project Second Rate
we have a proven product in Pendolino and Voyager, on the GWR the next versions of these fleets would have perfect for the line. but No investment in the 2nd best is easier.!
Really I doubt many people would agree about the Voyager, the point is IEP will substancially reduce Diesel under the wires running, and will certainly be quieter than a Voyager on Electric and according to those who have been on IEP its quieter on Diesel as well. Yes an alternative would have been to use Pendolino with probably some diesel dragging, but Dft decided IEP was a more flexible and cost effective solution, and whether you like the Bi-mode concept or not I'm not sure you can call it a second rate solution
these IEP things that are being assembled in newton should be only using their diesels for the last bit of jobs - ie - newton abbot - paignton and branches etc, the diesel tanks should be in ideal and perfect world filled weekly. Not daily as will now be the case.
i have seen the GWR electrostar units on testing regular days from BY, and they look very sexy, its a pity they wont be used properly and their legs wont be stretched properly on the western from at least oxford and Bristol.
Bi-mode on the western is a joke and farce...its something again Brunel and gooch would have been ashamed to have been involved in if they were alive today !
The electrification was never planned to go anywhere near Newton Abbot so that was never going to happen, and the Electrostars were never planned to serve Bristol on any regular basis as far as I am aware.
Last edited: