Does anyone know which are the two 1973 Stock units which have been withdrawn for conversion to Tube RAT use please?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,838
Location
Epsom
Yes thank you; the pictures provided the answer; for the benefit of anyone else wondering, it appears the two units are:

868 - 668 - 869

890 - 690 - 891

...which also suggests if you haven't got them for haulage already, it's too late to do so...
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,785
Location
Somewhere, not in London
Seriously but the A stock adehesion train never carried passengers even when the A stock was still in service.

6036 never carried passengers when it was converted.

But the A60s that it was inserted into prior to 2010 where passenger service units, and returned to it thereafter.

But the two P-RATs have been converted on a temporary basis, it's part of the project spec if you dig through the TfL, Renewals and/or Rolling Stock Renewals Board papers.
 

MatthewRead

On Moderation
Joined
21 Nov 2014
Messages
1,643
Location
West london
6036 never carried passengers when it was converted.

But the A60s that it was inserted into prior to 2010 where passenger service units, and returned to it thereafter.

But the two P-RATs have been converted on a temporary basis, it's part of the project spec if you dig through the TfL, Renewals and/or Rolling Stock Renewals Board papers.

So will the interior be any different to a regular 1973 tube stock?
 

Mojo

Forum Staff
Staff Member
Administrator
Joined
7 Aug 2005
Messages
21,180
Location
0035
So will the interior be any different to a regular 1973 tube stock?

Yes, it has some of the seats lifted and sandier tanks and other equipment fitted (photos are in the link above). Following testing and training with the Test Train Operators, it has now been decided that the trains will have to run as a 6 car, so another single ended unit will be added to each of the units converted, but they will not have any modifications.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,785
Location
Somewhere, not in London
Yes, it has some of the seats lifted and sandier tanks and other equipment fitted (photos are in the link above). Following testing and training with the Test Train Operators, it has now been decided that the trains will have to run as a 6 car, so another single ended unit will be added to each of the units converted, but they will not have any modifications.

Other than the in cab controls and somehow shoving the harness through the M doors?
 

rebmcr

Established Member
Joined
15 Nov 2011
Messages
4,005
Location
St Neots
Are the grab rails installed around the equipment meant to preserve the train's function as an emergency evacuation route, should it become sandwiched between services in a tunnel?
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,785
Location
Somewhere, not in London
Are the grab rails installed around the equipment meant to preserve the train's function as an emergency evacuation route, should it become sandwiched between services in a tunnel?

Only one of them is for that function, it's mainly due to the grab rails being used to secure the sandite equipment into position.
 

Mojo

Forum Staff
Staff Member
Administrator
Joined
7 Aug 2005
Messages
21,180
Location
0035
Are the grab rails installed around the equipment meant to preserve the train's function as an emergency evacuation route, should it become sandwiched between services in a tunnel?

Only one of them is for that function, it's mainly due to the grab rails being used to secure the sandite equipment into position.
With the equipment on board you wouldn't be able to get through anyway!
 